Proceedings of the Korean Operations and Management Science Society Conference
/
1996.04a
/
pp.225-229
/
1996
In order to accomplish large-size information systems successfully, one of the most improtant factor is the system integration(SI) of individual software projects which consist of the systems. A developer of each project should consider aspects of SI through the development cycle, and a manager of the entire system should manage, control, and evaluate each from a SI point of view. In this research, management models for the system managers, development models for the developers of unit projects, and standardized output documents for the management and evaluation purpose are presented based on the SI concepts.
Since the advent of Six Sigma in 1980's, Six Sigma is widely used in various industry areas, such as manufacturing, financial, government, and service, and proves its innovation ability and value by providing lots of success stories. Several researches have been conducted to adopt Six Sigma for Software Development and Software Quality Assurance-Software Six Sigma. Although the wide use of Six Sigma, there is no software tool to support the execution of Six Sigma Project. For this reason, the Quantitative Six Sigma Project Management is required to support for measuring and analyzing Six Sigma Projects, storing and reporting the results from Six Sigma Projects, and managing Six Sigma Projects through the whole process of, DMAIC or DMADV. In this paper, we introduce the design and implementation of a Quantitative Six Sigma Project Management Framework and Tool. The execution of Six Sigma Project based on Six Sigma Project Management Tool benefits the quantification, the systematization, and the integration.
Journal of Korean Society of Industrial and Systems Engineering
/
v.44
no.3
/
pp.276-287
/
2021
Project Management Information System (PMIS) is a special purpose information system that is created to provide useful information for project managers and participants to make effective and efficient decision making during projects. The use of PMIS is increasing in project based industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project management performance. However, it is unclear what are the difference of PMIS impacts between industries, and still need to be studied further. The purpose of this study is to compare the impact of PMIS on project management performance between industries. We assume that the effects of PMIS will be different depending on the industry types. Five hypotheses are established and tested by using statistical methods. Data were collected by using a survey questionnaire from those people who had experience of using PMIS in various project related industries such as construction, defense, manufacturing, software development and telecommunication. The survey questionnaire consists of 5 point scale items and were distributed through e-mails and google drive network. A total of 181 responses were collected, and 137 were used for analysis after excluding those responses with missing items. Statistical techniques such as factor analysis and multiple regression are used to analyze the data. Summarizing the results, it is found that the impacts of PMIS quality on the PM performance are different depending on the industry types where PMIS is used. System quality seems to be more important for improving the PM performance in construction industry while information quality seems more important for manufacturing industry. As for the ICT and R&D industries, PMIS seems to have relatively lesser impact compared to construction and manufacturing industries.
Proceedings of the Korea Database Society Conference
/
2010.06a
/
pp.13-19
/
2010
Information competitiveness accounts for substantial parts of business competitiveness necessary for business management in the knowledge-information society in the 21st century. To improve quality. productivity and competitiveness through information in the fields of SMEs particularly having difficulties under rapidly changing business environment. the government has operated "SME Information Support Project" for the past 8 years. The methodology for developing the standard for this project known as EISDM (Enterprise Information System Development Methodology) provides communication between IT businesses and SMEs participating in this project. and standardized output document formats and how to make out such documents. Infortunately. the number of personnel partaking in the development project for SMEs is no more than 2~4 per site on average. Further. they are required to complete demand analyses. development. testing and operation in about 6 months. which is a very short period. Moreover, there is too much demand for documentation, which is likely to end up being formal work process just for supervision and inspection. That is, the documentation could be for noting but documents. which will prove useless outputs after the project finishes. Therefore, this study proposes an improvement approach as an information system development methodology taking into account SMEs' characteristics and environment so as to relieve developers from such excessive burden of documentation, to save time and resources through efficient management of software development as the original purpose of the methodology, and to produce required quality software.
For high-quality software development, it is necessary to detect and fix the defects inserted. If defect management activities are not properly performed, it will lead to the project delay and project failure due to rework. Therefore, organizations need to establish defect management process and institutionalize it. Process standard models handle defect management in the area of project monitoring and control. However, small organizations experience difficulties in implementing and applying defect management process in a real situation. In this paper, we propose a defect management process for small organization which is designed in accordance with the characteristics of a small projects such as few participants and short development period. The proposed defect management process will be based on a tool chain with open source software such as Redmine, Subversion, Maven, Jenkins that support a defect management process and SW Visualization in systematic way. We also proposed a way of constructing defect database and various methods of analyzing and controlling defect data based on it. In an effort to prove the effectiveness of the proposed process, we applied the process and tool chain to a small organization.
Proceedings of the Korea Society of Environmental Toocicology Conference
/
2003.10a
/
pp.162-163
/
2003
The Eco-2 Project presents a win-win strategy for the environment and for the economy (ECO-2 is an abbreviation of Ecology and Economy), The project was initiated by the Korean Ministry of the Environment to promote the development of an environmental industry technology as a means of driving national development in this sector. Our project work belongs to the category of integrated environment management technology, and is described as a development and utilization of risk assessment and analysis system for integrated environmental management in municipal and industrial areas. The goal of our project is to develop available system software in health and ecological risk assessment and to offer it as Decision Support System (DSS) to aid the effective management of environmental risk in municipal and industrial areas in Korea.
Research on information systems and software engineering has often neglected behavioral effects, which may play a role in decision making on software development. The current study addresses this issue by empirically investigating the behavioral roots of over-requirement in the context of a software development project via an experiment. The negative phenomenon of over-requirement refers to specifying a software system beyond the actual needs of the customer or the market, which overload the system with unneeded features. The research question addressed here is whether over-requirement is due in part to the emotional involvement of developers with the software features they developed because of behavioral effects. Previous studies have demonstrated that under the endowment, I-designed-it-myself, and IKEA effects, people become emotionally involved and overvalue physical items that they respectively possess, self-design, or self-create. The findings of our experiment show that participants over-valued features they were assigned to be responsible for, to specify, or to construct, thereby confirming that the three behavioral effects play a role in software development decisions and affect over-requirement. Thus, the study contributes to software development research and practice from the behavioral economics perspective, highlighting the roots of over-requirement.
As the functional and nonfunctional requirements of defence systems become more complex and precise, concerning about the systematic development of software embedded into the defence systems has become surged up. In order to develop more reliable and correct software, and to extend the life cycle of the developing software, adoption of some engineering technologies such as development process, methodology, CASE tools and documentation is essentially required. This paper introduce an approach to technical information management in embedded software development process, with an instance, airborne ECM system development project. Particularly, we suggest and explain how to guide the software development according to process and methodology, and how to generate technical documents using CASE tool.
As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.
Recently, bottom-up information systems (BUIS), developed according to the requirements of individual user departments, have become popular. However, effective management of BUIS projects is not enough, with many organizations having experienced integration challenges with such individual projects. BUIS projects are relatively small and limited in scope, as opposed to the large, complex systems developed through traditional top-down information system development projects. Due to these differences in characteristics, the control modes as well as the aspects to improve development performance in each type of project are also different. Therefore, it is difficult to apply the results of prior research on control in system development projects to improve BUIS project performance. The purpose of this study is to derive a new theory of control to improve BUIS project performance. The results contribute to the improvement of firm performance through effective control of BUIS projects in modern enterprises.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.