• Title/Summary/Keyword: Software Construction

Search Result 1,195, Processing Time 0.031 seconds

A Framework for the IFC Interoperability Test Method to Support BIM (BIM 지원을 위한 IFC모델 호환성 검사 방법에 관한 기초 연구)

  • Kang, Hoon-Sig;Lee, Ghang;Shin, Yun-Ah
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.674-677
    • /
    • 2008
  • The Architecture, engineering, & construction (AEC) industry domains have grown more complex and larger, BIM is a digital representation of a building to facilitate the exchange and development of construction information integration and interoperability. Industry Foundation Classes (IFCs), under development by International Alliance for Interoperability (IAI), represent the part of buildings or elements of a process. IFC has been adopted as a central information repository in order to deliver integrated building information. Other BIM software could open the IFC file, recognize standard objects such as walls, window, and doors as building components. The IFC standard is generally agreed to be of high quality and is widely implemented in software. However, sometimes, information distortion or information toss occurrs during information exchang. The IAI Model Support Group (IAI-MSG) offers the opportunity to certify IFC-compliant applications based on a structuralized approach. However, IFC interoperability error also have occurred by using certificated tools. As project participants exchange BIM information by using BIM software they will need a reliable and efficient exchange of information. In this paper, previous interoperability tests were analyzed, and we propose a new concept in interoperability test.

  • PDF

The Design and Implementation of a Reusable Viewer Component

  • Kim, Hong-Gab;Lim, Young-Jae;Kim, Kyung-Ok
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.66-69
    • /
    • 2002
  • This article outlines the capabilities of a viewer component called GridViewer, and proves its reusability. GridViewer was designed for the construction of the image display part of GIS or remote sensing application software, and consequently it is particularly straightforward to closely couple GridViewer with access to very large images. Displaying is performed through pyramid structure, which enables to treat very large dataset up to several gigabytes in size under the limited capability of PC. GridViewer is free from responsibility to handle various formats of raster data files by taking grid coverage, which is designed by OGC to promote interoperability between implementations done by data vendors and software vendors providing analysis and grid processing implementations. GridViewer differs from other such viewer by allowing for clients to extend its function and capability by using small set of methods originally implemented in it. We show its reusability and expandability by applying it in developing application programs performing various functions not supported originally by the GridViewer COM component.

  • PDF

An Argument-based Approach to Manage Collaborative Negotiations in Software Systems Design

  • Lu, Stephen C-Y.;Jing, Nan
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.3
    • /
    • pp.266-287
    • /
    • 2008
  • To manage collaborative negotiation in software system design, we have built a socio-technical argument-based negotiation management approach by integrating a Socio-technical Co-construction Process (STCP) with an Argument-based Negotiation Process (ABNP). This paper reviews relevant research work and presents each step of this approach. The STCP provides rich contextual information of technical decisions and social interactions in a system design process. The ABNP provides STCP with a negotiation management and conflict resolution strategy by guiding software engineers to generate, exchange and evaluate their argument claims in negotiation activities. In addition, this paper describes a prototype system which implements this new approach using the advanced Web-based software technologies with the goal of demonstrating how to systematically enhance the negotiation management capabilities in a dynamic socio-technical framework.

The Solution Of Software Contract (기획특집 - 공공 소프트웨어 발주관행 개선방안(IT 프로젝트관리 실무))

  • Shim, Ki-Bo
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.5
    • /
    • pp.29-31
    • /
    • 2009
  • A general practice in software ordering behavior in public sector has been an enormous obstacle standing in development path of Korea's software industry. Standard on software development cost estimation is supposedly based on Function Point, but in general, it is on headcounting (a number of people involved in a project). Moreover, it is difficult to change a contract in an on-going project, since statement of work is not precisely and carefully described. But it has a simple solution. Design and Implementation should be a separate project, as in construction industry, and both power and responsibility for design should be given to an expert with a national-level qualification. Here, there is a simple way for Korea to reborn as one of the strongest software country.

  • PDF

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

FRAMEWORK FOR HIGHLY INTEGRATED, INTEROPERABLE CONSTRUCTION SIMULATION ENVIRONMENTS

  • Simaan M. AbouRizk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.71-82
    • /
    • 2009
  • This paper describes the use of a highly interactive and inter-operative application for complex simulation environments, or Synthetic Environments (SE), as deployed for construction as Construction Synthetic Environments (CSE). Based on the High Level Architecture (HLA), this research focuses on implementing simulation technology in a software environment, COSYE, that will be the foundation for building CSE applications. This framework is discussed in the context of tunneling and industrial construction applications, including steel fabrication and pipe-spool manufacture. The framework is demonstrated using the NEST sanitary tunnel project in Edmonton, Canada, in which COSYE was used for scenario-based analysis and planning.

  • PDF

Trend Analysis on literature of Personnel Training in Construction Management Specialty Based on Visualization Technology (基于可视化技术的我国高校工程管理人才培养研究态势分析)

  • Xu, Lu;Wu, Renhua;Cai, Binqing
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.214-224
    • /
    • 2017
  • This paper focuses on bibliometrics analysis of personnel training in construction management specialty using visualization software CiteSpace from CNKI database. And points out the research situation and development trend of college personnel training on construction management in China. The results show : (1)the research of professional talents in colleges of construction management presents continued activity, and the source journals are widely. There are a lot of researchers pay attention to this issue, but collaborate little with each other; (2)Most of literature fasten on the practical talent training mode, practical teaching reform and course system reformation. Therefore, we should be further strengthened in academic cooperation, be further broadened research scope, be further enriched the insight of the research, and should follow with interest the issue on personnel training on construction management under the background of new engineering disciplines.

  • PDF

The Development of Interface technology Between 3D Modeling Data and Cable Engineering Program Data (전선로 3D Modeling 데이터와 케이블 엔지니어링 데이터의 연계 기술개발)

  • Cho, Sung-Don;Yoo, Gi-Hong;Kim, Soon-Goo
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.400-401
    • /
    • 2007
  • 3D Modeling S/W인 PDS(Plant Design System)의 Electrical Raceway Modeling Software인 EE-Raceway로 작성된 DB에서 트레이, 트레이 Link, Fitting 데이터를 추출하여 케이블 엔지니어링 프로그램의 Input 자료로 활용하는 연계기술과 활용에 대하여 소개하고자 한다

  • PDF

RESEARCH AND DEVELOPMENT OF PROGRAM MANAGEMENT SUPPORTING SYSTEM

  • Tetsuya Yamada;Shigehiko Tanabe
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.480-489
    • /
    • 2007
  • Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.

  • PDF

Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management

  • Chan, Eric W.L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.18-27
    • /
    • 2011
  • Although information communication technology (ICT) is long regard as very useful tool in today's construction engineering and project management environment, organizations must not only operate based upon its original setting, but also requires on-going observation, additional features and fine-tuning actions before the desirable outcome can be achieved. However, it is a very common phenomenon that organizations purchase the licensed "off-the-shelf-software" package and customize it to suit their own business need. Due to the incapability of such software and inefficient customization, the possible result is making that ICT tool not user-friendly and sometimes the whole system becomes obsolete. The purpose of this paper is to review and report those actions taken (between February 2006 and December 2010) by a construction organization to enhance the performance of its Enterprise Resource Planning (ERP) system launched in December 2002. Such actions include: improving data inputting method; removing the transition bottleneck; introducing crystallization function; revising the organization's "Delegation and Limits of Authority"; publishing the "League Table" amongst users; integrating the 3D Mode into the system and upgrading hardware. Whilst the ultimate goals of such system are well beyond the time limit of this research study, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth US$500 million after the ERP system was functioned properly and effectively. Their experience and success becomes an exemplar which can be borrowed by those companies, from managerial perspectives and as a roadmap, planning to adopt information technology (IT) strategy and use ICT tool in the construction engineering and project management framework. Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.