• Title/Summary/Keyword: Snow Removing

Search Result 21, Processing Time 0.035 seconds

Designing a Snow-removing Tool Through Ergonomic Approach

  • Jung, Kwang Tae;Nam, Jung Min
    • Journal of the Ergonomics Society of Korea
    • /
    • v.35 no.5
    • /
    • pp.439-447
    • /
    • 2016
  • Objective: The purpose of this study is to design a snow-removing tool using an ergonomic approach. Background: It is necessary to remove snow on the garden of a house or side street to prevent a fall hazard. When a user removes snow using a snow-removing tool, he or she experiences lots of physical discomfort. Therefore it is necessary to design a snow-removing tool to reduce a user's physical discomfort. Method: In this study, a new design for a snow-removing tool was developed considering user needs. The design prototype was compared with an existing tool through electromyography and subjective evaluation. Results: From the comparison evaluation, significant differences between the new design and the existing tool were identified in both muscle fatigue and subjective rating of discomfort. Conclusion: The result showed that the new design is better from the aspect of easing physical discomfort. Application: A new snow-removing tool can be developed using the design so that it can reduce a user's physical discomfort.

A Study on Countermeasures Against Heavy Snow on Road in Seoul : Focusing on Seocho 1-dong (서울시 도로의 폭설대응방안 연구 : 서초 1동을 중심으로)

  • Won, Jong-Seok;Bae, Yoon-Shin;Kim, Sang-Gyoon
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.67-74
    • /
    • 2014
  • PURPOSES : This study is to investigate the countermeasures against heavy snow on road in Seoul: Focusing on Seocho 1-dong. METHODS : Since 2000, three cases of the top 10 in the highest snow fall depth in a day occurred in 2001(234mm, 156mm) and 2010(258mm) and the possibility of heavy snow is getting higher. 10 days after heavy snow fall when the snow thaws, socio-economic damages occurred often. For example, the insufficient snow removing, difficulty in patients transfer, crash accidents, injuries from a fall, the increasing cost of snow removing etc. RESULTS : For the effective deploying snow removing equipment and workers, it is necessary to understand emergency snow removing spots. Seocho 1-dong was tested because it contains mountains, hill and urban areas as well as various buildings and road types exposures. CONCLUSIONS : Based on the domestic and international heavy snow researches, the elements for vulnerability were analyzed and vulnerable areas to snow fall were derived.

Development of LED Traffic Light Lens with snow removing function (제설 기능을 갖는 LED 신호등 렌즈 개발)

  • Lee, Dongeun;Seol, Dongyoul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.13 no.4
    • /
    • pp.41-48
    • /
    • 2017
  • It is necessary to develop an LED traffic light lens having a snow removal function capable of clearly providing a traffic signal to the driver even when a traffic light is blurred due to heavy snow and wind in the winter season. This study is focused on the research and development of the traffic light lens in the process of developing the LED traffic light with the snow removal function. In the developed traffic light lens, instead of attaching the film heater, the coated nichrome wire was wound into a coil shape and inserted directly into the groove in the lens. The developed heater system facilitates the insertion of the heating wire with high elasticity into a curved lens and can provide a sufficient heat without deformation of the PC lens. The proposed traffic lights were tested in various external environments and the test results showed that complete snow removal is possible without tunnel effect.

Snow-Falling Measurement System monitoring the Height of Snow using the Photo Coupler (포토카플러를 이용한 눈(snow)높이 감지 강설 계측시스템)

  • 최만용;박해원;박정학;김원태
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.517-520
    • /
    • 2003
  • The snow-fatting measurement system including the snow sensor applying the photo-coupler is investigated in this study and using this snow sensor the height of snow fallen is measured. To measure the snow depth, five photo sensors are arranged with 5 mm distance. The snow-falling measurement system, which is measuring the motor revolution controlled with stepping motor, is mounted above the snow surface. From this work, it is feasible to measure quantitatively the snow on real time. Its software implements a proven method to achieve valid measurements also under difficult conditions as future study. In cases where the snow sensor is applieded to the prediction of snow in the meteorological observation system and the snow removing system, it is recommend the GRS-Option in order to improve the quality of snow measurements for better compensation.

  • PDF

Development of Inspection Robot for Removing Snow on Stays of Cable-Stayed Bridge (사장교 케이블의 잔설 제거용 점검 로봇 개발)

  • Kim, Jaehwan;Seo, Dong-Woo;Jung, Kyu-San;Park, Ki-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.246-252
    • /
    • 2020
  • Safety accidents have been reported due to falling accumulated snow from cables of cable-supported bridges. In addition to the direct damage caused by falling snow, secondary damage, such as traffic accidents, can occur. Various methods have been proposed to prevent these accidents, but there are still problems in safety and practicality. In this study, a cable robot type was selected as one of the active methods for removing accumulated snow on cables. An attempt was made to increase the climbing ability of the robot to improve the efficiency of snow removal. In addition, the available range of cable diameter for the robot can be adjusted flexibly to be applied to cables used in the field. A high-resolution camera was also installed to check the surface condition of the cable in real time to increase the utility, and be used as a cable inspection robot. A three-axis accelerometer and a tension conversion algorithm were added to measure the tension force of cables. To verify the performance, indoor and field experiments were conducted, and future improvements for the inspection robot were proposed.

Regional snows scenario for the support systems Analysis (지역별 제설 시나리오 응원체계 구축연구)

  • Kim, Heejae;Oak, Youngsuk;Kim, Geunyoung
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.163-172
    • /
    • 2017
  • Because of abnormal weather, a heavy snow on the Northern latitudes occurs frequently. This has resulted in significant damage and recovery costs. In korea, it has been declared a special disaster area due to heavy snowfall in Gangneung and Pohang 2004, 2005 and 2011, so there was a revision of action instruction for the road snow removal. Although, in our current system, snow removing methodology, regional equipment holdings, and snow responsible interval, respectively, has been classified by the National Highway, near cities and provinces support system not yet prepared. Only, if snow removing is not possible within the region itself, which contained the contents of "support and assistance to military or nearby offices requests". In this thesis, we studied the disaster scenario development according to heavy snow and the response and support system to the features of each regional. For the scenario deduction, we preferentially collected day snowfall and disaster yearbook data to regionals, classified similar pattern and plotted GIS snow map. We also classified heavy snow disaster by region and type and we deduced five-step scenario. The five-step scenario is nationwide(1st-stage), the National Capital region(2nd-stage), the Chungcheong Provinces(3rd-stage), the Kangwon province(4th-stage) and the Ch?l a provinces(5th-stage). Therefore we build near provinces support system according to five-step scenario.

A Study on the Characteristics of the Earth Heat Extraction Using Termosyphon (Termosyphon의 지열채열 성능에 관한 고찰)

  • Shin, H.J.;Seo, J.Y.
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.5 no.3
    • /
    • pp.226-233
    • /
    • 1993
  • Thermosyphons are simple devices that can passively transport thermal energy over relatively large distance with little temperature degradation. Especially, the thermosyphon system requires no costly energy input and is completely maintenance free. These attributes permit the use of low grade thermal energy for thermal control of structures including the stabilization of highway foundations. This paper presents the experimental results of the snow melting system in which thermosyphon was utilized to ransfer the earth energy to the pavement to remove snow and ice. The test facility, three earth heated and one unheated test panels, is designed to investigate the variables associated with removing snow and ice from pavement surfaces. The results of these test show that the earth heated panel surface temperature is higher $2{\sim}6^{\circ}C$ than unheated panel when the ambient air temperature is $-7^{\circ}C$. The thermal performance of this earth source thermosyphon system for road heating showed that there was no snow on the heated test panels when the snowfall was 5cm average for the region.

  • PDF

A Study on the Fabrication and Characteristics of Snow Removal PV Module & System using Heating Film (발열 필름을 이용한 제설 기능 PV module & system 제작 및 특성평가)

  • Park, Eun Bee;Cho, Geun Yuoung;Cho, Sung Bae;Kim, Hyun Jun;Yu, Jeong Jae;Park, Chi Hong
    • Current Photovoltaic Research
    • /
    • v.4 no.4
    • /
    • pp.159-163
    • /
    • 2016
  • Piled snow upon PV module interferes with Photoelectric Effect process through photovoltaic directly. As a result of this phenomenon, its generation efficiencies keep decreasing or are stuck at zero power generating status. In addition, PV facilities have been installed on those places such as water surface, roof-top, and other isolated places, dealing with conditions of "Securing high REC weighted value", "Difficulty of securing land" and so forth. Through this study, we are able to actualize the function of heating over PV modules when it snows. We adopted laminating method through heating film and modules, guaranteeing warranty more than for 25 years. Also we are trying remote control systemically, not by hardware control, to run parallel with automatic driving and monitoring system which enable to control operation time, insolation, amount of snowfall automatically. We applied analysis of actual proof to both snow removal PV system and general PV power system, and these led to bear power consumption analysis while snow-removing, and its comparison after finishing the task as "One stone, two birds." In the long run, we could carry out economic analysis against snow removal system, and this helps to verify the most maximized control method for snow removal conditons on a basis of weather information. this study shall let prevent people from negligent accidents, and improve power generation problems as mentioned from the top. Ultimately, we expect to apply this system to heavy snowfall regions in winter season in spite of its limited system installaion in Korean territory, initially.

Performance and Adequate Usage of Deicing Materials (도로 융설제 성능 평가와 적정 사용량 산정)

  • Yun Duk-Geun;Jeong Jun-Hwa
    • International Journal of Highway Engineering
    • /
    • v.8 no.1 s.27
    • /
    • pp.55-64
    • /
    • 2006
  • Deicing work is usually considered as a main part of winter road management activity. The deicing includes the physical method which removes snow with tools and the chemical method which melts snow with deicing materials. When removing snow using deicing materials, using excessive deicing materials will cause the environment and budget problems. When deicing materials are used less than the required amount, snow will remain on the road surface. In this research, the performance of deicing marerials has been evaluated and the amount of deicing materials has been determined by the laboratory and the field experiments. Also the adequate usages of deicing materials has been proposed.

  • PDF

A Study on the Thermal Response Characteristics of Snow Removing Facilities using Heat Pipe (히트파이프식 제설설비의 열응답 특성에 관한 연구)

  • Lee, Yong-Soo;Jang, Yeong-Suk
    • Solar Energy
    • /
    • v.17 no.4
    • /
    • pp.45-56
    • /
    • 1997
  • The purpose of this research was to study the characteristics of heat transfer of snow removing facilities using heat pipe by experimental method. Heat pipes was constructed a flexible tube connected between evaporator and condenser ends for altitude adjustment of evaporator and it was constituted an internal diameter of 25.4mm, a length of 950mm for heating section and a length of 6000mm for condenser section with copper material for closed system. The results showed that the effect of heat transfer was increased when inclination angle and inlet temperature of heating water increased. Wall temperature response by inclined angle $4.5^{\circ}c-9^{\circ}c$ and working fluid amount 0.96 from to 1.3 times of evaporator volume were better than those of other working fluid and angle.

  • PDF