• 제목/요약/키워드: Smart contractors

검색결과 7건 처리시간 0.021초

BIM지침의 통합관리를 위한 구조화에 관한 연구 (A Study on Development of Framework Based BIM Guideline System)

  • 한지수;이세잎;조찬원;김구택;조주원
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.210-219
    • /
    • 2015
  • As various contractors have been asking BIM data in the construction industry, BIM guidelines and standards has become increasingly important these days. Above all, BIM guidelines should be established properly because it is utilized at the earliest stage of BIM data creation. However, each of the existing BIM guidelines was totally different by contractors, disciplines or phases so that it caused problems about repetitious work, inefficient management and so on. In order to overcome these problems, we suggest integrated management system for BIM guidelines. We firstly collected and analyzed existing guidelines, secondly standardized guideline phrases and lastly constructed data structure of integrated management system. This integrated management system is expected to increase work efficiency to avoid working error for designers and enable easy creation or revision of BIM guidelines for contractors.

초고층 건축물 전력관리 시스템에 BIM 적용을 위한 기초적 연구 (A Fundamental Study on Applying BIM to Power Manage System of Super Tall Buildings)

  • 조찬원;권순호;이운재;노태임;옥종호
    • 한국CDE학회논문집
    • /
    • 제17권2호
    • /
    • pp.140-148
    • /
    • 2012
  • This study aims to provide power monitoring system for super tall buildings with 3D BIM (Building Information Modeling) technology. In order to realize this subject, standard specifications for BIM objects and attributes were studied through analyzing processes and elements of electrical utilities for power management systems applied for super tall buildings. These standard BIM specifications could be used by designers, contractors and facility operators, and thus could be helpful to realize BIM information sharing between multiple disciplines and construction phases. And further study has been suggested to develop standard specification and applications from this study.

복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출 (Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication)

  • 이동민;장세준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제9권3호
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

목표달성기여도와 예상적용효과에 의한 시공단계 BIM 주요 업무 도출 - 공공부문 공동주택 건설사업 사례를 중심으로 - (Identification of Major BIM-applicable Tasks with Contribution to Achieving Objectives and Expected Benefit in Construction Stage: Focused on the Case of Public Apartment Housing Projects)

  • 송상훈;방종대;손정락
    • 한국BIM학회 논문집
    • /
    • 제9권3호
    • /
    • pp.41-53
    • /
    • 2019
  • As a central part in smart construction, BIM has been rapidly spread in construction industry at large. However, the level of applying BIM in construction stage is still relatively lower than that in design stage due to unclear application method, inadequate design BIM model, technical faults of BIM itself, etc. Under these circumstances, public owners inevitably need to adjust the scope and pace in BIM application considering their internal support and capabilities of contractors. This study aims to suggest major BIM-applicable tasks during construction stage in the process of establishing gradual long-term and short-term introduction strategy for public apartment housing projects. Those major tasks were identified with the combination of the importance of tasks and the future benefits of BIM using IPA method. To do so, the degrees of contribution to achieving objectives in construction, current task execution, and communication requirement were investigated by internal site managers. On the other hand, the expected benefits and current level of using BIM were assessed by BIM experts. Among operational tasks by phases, design review, construction plan review, making as-built drawing, etc. were categorized as major tasks. In addition, progress control, regular meeting, master schedule development, work inspection, on-site quality check, etc. were also drawn as major tasks by management areas. The results of this study will provide the useful reference for owners concerned about the introduction of new technologies.

중소기업의 블록체인 적용효과와 법제도 및 정책적 과제에 대한 융합적 연구 (A Study on the Effectiveness of Blockchain and Legal System and Policy Tasks for SMEs)

  • 안명구;박용석
    • 융합정보논문지
    • /
    • 제9권7호
    • /
    • pp.14-24
    • /
    • 2019
  • 블록체인의 활용이 금융서비스 등에서 우선적으로 진행되고 있고, 중소기업 분야의 경우 블록체인의 활용도와 효과성이 높은 분야로 거론된다. 본 연구에서는 중소기업에 블록체인을 적용했을 때 나타날 수 있는 효과성에 대해서 확인하고 적용 시 우선적으로 필요한 법제적 및 정책적 과제를 살펴보기 위한 논문이다. 이는 관련 주제를 함께 다룸으로서 그 도입에 대한 당위성을 알아보기 쉽게 하기 위함이다. 선행연구의 부족으로 다양한 논문과 보고서를 참고하였으며, 공급사슬관리 최적화, 서류작업의 간략화, 제품 생산성 향상, 자금 흐름 원활화 등의 긍정적 효과가 나타날 수 있다는 것을 확인했다. 또한 전자거래기본법, 전자상거래법, 전자금융거래법, 개인정보보호법에 관한 법제적 보완의 필요성을 확인했으며, 플랫폼 개발, 중소기업 대상 교육 제도, 거래 표준화 지침, 세금 감면 정책, 블록체인 연구 개발을 위한 정책적 보완의 필요성을 확인하였다. 향후 보다 광범위한 실무적인 연구와 구체적인 차원의 개별 법률 연구가 필요하다.