• 제목/요약/키워드: Small Hydro-Power

검색결과 175건 처리시간 0.028초

Design optimization of cylindrical burnable absorber inserted into annular fuel pellets for soluble-boron-free SMR

  • Jo, YuGwon;Shin, Ho Cheol
    • Nuclear Engineering and Technology
    • /
    • 제54권4호
    • /
    • pp.1464-1470
    • /
    • 2022
  • This paper presents a high performance burnable absorber named as CIMBA (Cylindrically Inserted and Mechanically Separated Burnable Absorber) for the soluble-boron-free SMR. The CIMBA is the cylindrical gadolinia inserted into the annular fuel pellets. Although the CIMBA utilizes the spatial self-shielding effect of the fuel material, a large reactivity upswing occurs when the gadolinia is depleted. To minimize the reactivity swing of the CIMBA-loaded FA, two approaches were investigated. One is controlling the spatial self-shielding effect of the CIMBA as burnup proceeds by a multi-layered structure of the CIMBA (ML-CIMBA) and the other is the mixed-loading of two different types of CIMBA (MIX-CIMBA). Both approaches show promising performances to minimize the reactivity swing, where the MIX-CIMBA is more preferable due to its simpler fabrication process. In conclusion, the MIX-CIMBA is expected to accelerate the commercialization of the CIMBA and can be used to achieve an optimal soluble-boron-free SMR core design.

Spring water를 이용한 소수력 개발 (Development of Small Hydro Power Using Spring Water)

  • 신동선;김영국;최홍열;장정호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.1142_1143
    • /
    • 2009
  • 베칼 소수력발전소 개발 사업은 이라크 전후복구사업의 일환으로 이라크 아르빌의 열악한 전력사정을 감안하여 베칼지역의 용출수를 이용하여 소수력발전소를 건립하는 것이다. 본 사업은 정치 및 경제적으로 어려운 열악한 환경속에서 소수력발전소를 건설을 위해 현지조사 및 실시설계를 수행하였고 2009년 8월에 상업발전을 목표로 시공이 순조롭게 진행중이다.

  • PDF

부하변동에 따른 발전기 특성해석 (Characteristics Analysis of Generator by Load Variation)

  • 김종겸
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 추계학술대회
    • /
    • pp.507-510
    • /
    • 2006
  • 본 논문은 신재생에너지의 한 분야로서 청정에너지인 소수력 발전시스템 운영시 수용가 부하의 변동에 따른 발전기의 특성변화를 해석한 것이다. 모의에 사용된 동기발전기-전동기가 부하의 변동에 따라 토크, 속도, 전류 등이 어떤 영향을 받는지 전자계 과도해석 프로그램을 사용하여 나타내었다.

  • PDF

강우상태에 의한 소수력발전소의 수문학적 성능특성 변화 (The Variation of Hydrologic Performance Characteristics for Small Hydro Power Plant with Rainfall Condition)

  • 박완순;이철형
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2008년도 학술발표회 논문집
    • /
    • pp.1369-1372
    • /
    • 2008
  • 소수력자원은 신재생에너지 중에서도 온실가스 배출량이 가장 적고 에너지밀도가 매우 높기 때문에 개발할 가치가 큰 청정부존자원으로 평가되고 있다. 강우상태의 변화는 Weibull분포의 축척모수와 형상모수를 인위적으로 변화시켜 소수력발전소의 설계인자들의 변화를 모사하였다. 분석 결과, 소수력발전입지의 수문학적 성능특성은 해당유역의 강우상태에 따라 변하는 것으로 밝혀졌다.

  • PDF

유도전동기를 발전기로 사용시 동작 특성 해석 (Analysis for the Operating Characteristics when the Induction Motor is Used as a Generator)

  • 김종겸
    • 신재생에너지
    • /
    • 제10권2호
    • /
    • pp.5-11
    • /
    • 2014
  • Squirrel cage induction motor is the main driving system of industrial field and familiar with its use in a large variety of applications. The structure and operating characteristics of induction generator is almost identical to induction motor, but the induction generator part is used restrictively from hydropower power and wind power development etc. Recently induction generator is commonly used for micro & small hydro power applications due to its simplicity, reliability, low cost and robustness. Input and output of induction motor has turned against at the induction generator operation. Rotation speed of induction generator is small faster than synchronous speed of induction motor. As output of induction machines increases with the increasement of speed, so loss is same. Actually, generator efficiency is lower than motor at this condition. If induction generator is connected with mechanical load such as increaser, total efficiency is decreased. Consequently the quality in compliance with an induction motor parameter applying like that in the generator is a possibility of having the error of some. In this paper, we analyzed that input, output, torque and efficiency of induction machine is different from each other above and below synchronous speed.

강우자료 분석에 의한 소수력 발전소의 성능예측 (Performance Prediction of Small Hydropower Plant through Analyzing Rainfall Data)

  • 이철형;박완순;신동렬;정헌생
    • 태양에너지
    • /
    • 제9권3호
    • /
    • pp.81-91
    • /
    • 1989
  • This study represents the method to predict the flow duration curve and primary design specifications of small hydropower plant at hydropower site through analyzing the monthly rainfall data. Weibull distribution was selected to characterize the rainfall data and Thiessen method was used to calculate monthly average flowrate at site. Application of these results, primary design specifications such as design flowrate, annual average load factor and utility factor, annual average hydropower density and annual electric energy production were estimated and discussed for surveyed site located in Daigi-ri, Kangwon province. And performance characteristic model of small hydro-power plant was applied to estimate these specifications.

  • PDF

삼천포 화력발전소 방류수로 및 방류해역의 흐름 관측 및 특성분석 (Flow Measurement and Characteristic Analysis in the Effluent Regions of the Samcheonpo Thermal Power Plant(TPP))

  • 조홍연;정신택;강금석
    • 한국해안해양공학회지
    • /
    • 제18권4호
    • /
    • pp.329-337
    • /
    • 2006
  • 삼천포 화력발전소에서 냉각수로 이용되고 방류되는 해수를 이용한 소수력 발전소가 삼천포 해역에 건설되고 있다. 본 연구에서는 소수력 발전소가 건설되는 지점, 즉 방류수로 및 방류해역의 흐름을 관측하고 흐름특성을 분석하였다. 방류수로의 흐름은 냉각수 방류량에 의한 영향이 지배적이며, 공간적으로는 냉각수가 합류되는 Weir 상류구간, 합류된 냉각수가 방류수로를 통하여 배출되는 Weir 하류구간, 방류해역으로 구분할 수 있다. Weir 상류 지점은 측면에서 유입되는 냉각수로 인하여 유량이 점차 증가하나, 수로의 폭이 증가하기 때문에 수위 변화가 미미한 지역이며, Weir 하류지점은 월류된 냉각수가 사류(super-critical flow)구간을 거쳐서 수리학적 도약으로 인한 강한 연직방향의 요동을 보이며 방류해역으로 이동하는 구간이다. 한편, 방류수에 의한 영향으로 외해방향으로의 해수흐름이 형성되나 유속은 조위의 승강운동에 크게 영향을 받는 것으로 파악되었다. 또한, 방류해역의 조위는 통영 검조소에 비하여 평균조차는 약 10% 크게 나타나고 있으며, 파랑전파에 의한 영향은 미미한 정도로 파악되었다.

초소수력 발전 잠재량의 가시화를 위한 앱 개발 (Development of App. for Visualization of Micro Hydro Power Potential)

  • 김동현;양창욱;이승오
    • 한국콘텐츠학회논문지
    • /
    • 제17권4호
    • /
    • pp.1-11
    • /
    • 2017
  • 신재생에너지에 대한 관심이 증가하고 있지만 부정적인 여론으로 인해 초소수력 발전소 개발이 부진한 실정이다. 그러나 다른 신재생에너지에 비해 에너지 변환효율이 높고 이산화탄소를 배출하지 않아 대체에너지로써 개발 및 확대에 대한 관심이 필요하다. 이에 본 연구는 이클립스(Eclipse)를 이용하여 초소수력 발전량을 가시화하는 지도를 담는 애플리케이션을 개발하였다. 이를 통해 먼저 대상지점을 선택하고 미 공병단에서 제공하는 HEC-HMS으로 산출한 확률 설계유량으로 발전용량을 산정한 후 경제성 분석을 수행할 수 있다. 시범지역으로 강수량이 풍부한 강원도 영월군을 선정한 후, 국가수자원관리종합정보에서 제공하는 기초자료를 이용하여 초소수력 발전 잠재량 분석을 수행하였다. 본 연구 결과로 대상지점의 예상발전량, 연간전기생산량, 경제성분석 등을 단시간에 평가할 수 있고, 전국을 대상으로 잠재되어 있는 초소수력 발전 가능지역을 선별하는데 활용될 것으로 기대된다. 또한 간편하게 발전 가능지역을 선별할 수 있기 때문에 초기 투자비용을 줄일 수 있을 것으로 판단된다.

원자력발전소의 노심냉각회복 조치에 대한 운전원 조치시간 평가 (An Evaluation of Operator's Action Time for Core Cooling Recovery Operation in Nuclear Power Plant)

  • 배연경
    • 한국안전학회지
    • /
    • 제27권5호
    • /
    • pp.229-234
    • /
    • 2012
  • Operator's action time is evaluated from MAAP4 analysis used in conventional probabilistic safety assessment(PSA) of a nuclear power plant. MAAP4 code which was developed for severe accident analysis is too conservative to perform a realistic PSA. A best-estimate code such as RELAP5/MOD3, MARS has been used to reduce the conservatism of thermal hydraulic analysis. In this study, operator's action time of core cooling recovery operation is evaluated by using the MARS code, which its Fussell-Vessely(F-V) value was evaluated as highly important in a small break loss of coolant(SBLOCA) event and loss of component cooling water(LOCCW) event in previous PSA. The main conclusions were elicited : (1) MARS analysis provides larger time window for operator's action time than MAAP4 analysis and gives the more realistic time window in PSA (2) Sufficient operator's action time can reduce human error probability and core damage frequency in PSA.

분산전원의 전력계통연계에 따른 영향 및 시뮬레이션 (Impact of Power System Interconnection to Embedded Generation and simulation)

  • 박지웅;김종형;신명철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.280-282
    • /
    • 2002
  • As EG(Embedded Generation : photo-voltaic, wind, combined heat and power, fuel cell, small hydro etc.) grows fast in adopting to peak load reducing at the middle or the end of distribution system, there much has been interested in interconnection of EG. This paper discusses the various issue of a embedded generator to power system and shows the simulation of its various situation that could happen (focusing on load-flow by EG) by using a commercial software CYME(PSAF) for load-flow. With a result of above simulation, this paper shows a way of possible solution briefly.

  • PDF