1 |
KHNP, "Probabilistic Safety Assessment for Kori Unit 3&4", 2008.
|
2 |
U.S. EPR, "FSAR Tier 2 Section 19.1", Rev.0 pp.16
|
3 |
KHNP, "Human Relaiability Analysis Report for Kori Unit 3&4", 2008.
|
4 |
KHNP, "Success Criteria Analysis Report for Kori Unit 3&4", 2008.
|
5 |
NEI 00-02, "Probabilistic Risk Assessment Peer Review Process Guidance Rev. A3", March, 2000.
|
6 |
F. Rahn, "MAAP4 Application Guidance", EPRI, 2008.
|
7 |
ASME, ASME/ANS RA-Sa-2009, "Addenda to ASME/ANS RA-S-2008 Standard for Level I/ Large Early Release Frequency Probabilitsitc Risk Assessment for Nuclear Power Plant", 2009.
|
8 |
Han S.J., Lim H.G., Yang J.E., "An Estimation of an Operator's Action Time by using the MARS code in a Small Break LOCA without a HPSI for a PWR", Nucl. Eng. and Design, Vol. 237 pp. 750, 2007.
|
9 |
KHNP, "Emergency Operating Procedure ER-C.1 Response to Degraded Core Cooling", Rev. 6. Nov. 21, 2006.
|
10 |
Westinghouse Electric Company, "WOG 2000 Reactor Coolant Pump Seal Leakage Model for Westinghouse PWRs", WCAP-15603, Rev. 1, 2002.
|
11 |
KHNP, "Emergency Operating Procedure Supplement-1.3 Switch to Cold Leg Recirculation", Rev. No. 21, 2006.
|
12 |
Jung. W.D., Kang D.I., Kim J.H., "Development of a Standard Method for Human Reliability Analysis (HRA) of Nuclear Power Plants-Level 1 PSA Full Power Internal HRA", KAERI/TR-2961 /2005, 2005.
|
13 |
KHNP, "Emergency Operating Procedure ER-C.2 Response to Inadequate Core Cooling", Rev. 6. Nov. 21, 2006.
|