• 제목/요약/키워드: Sluice

검색결과 156건 처리시간 0.021초

배수갑문 방류시점 및 방류량에 따른 담수호의 수질변화 (Water Quality Behavior by the Sluice Gate Operation of Freshwater Lake)

  • 김선주;김성준;김필식;이창형
    • 한국농공학회지
    • /
    • 제45권1호
    • /
    • pp.91-101
    • /
    • 2003
  • Boryeong Seadike located at southwestern seashore of Korean peninsula completed in 1997. Sluice gate operation can be an important factor to maintain lake water quality and reduce retaining time of pollutants within lake. The lake water quality simulation model, WASPS was adopted and tested to find out proper gate operation timing and discharge amount. From the simulation of sluice gate operation, the results showed that the later the time of discharge for loosing 1 day successively to 6 days, the better the quality of water. Discharge amount showed relatively minor changes of water quality. This means that pollutants flowed into lake from watershed do not have enough time to mix up with deep water when the gate opened at early time. About 3 days delay of discharge caused the dilution effect to stabilize the lake water quality in case of Boryeong freshwater lake.

금강하구둑 배수갑문 조작에 의한 상류수역의 수위변동 (Variation of Water Level on the Upstream Gauging Station by Operation of the Drainage Sluice Gate of Geumgang Estuary Dam)

  • 박승기
    • 한국농공학회논문집
    • /
    • 제47권6호
    • /
    • pp.15-24
    • /
    • 2005
  • The normalization on the characteristics of water level change at the upstream gauging station was attempted according to the operation of drainage sluice gate of the Geumgang estuary dam. The characteristics were normalized by the analysis of water level change and by the linear-regression of the water level data measured at the inner station of Geumgang estuary dam and upstream gauging station. The results of normalization may be referred to the management of Geumgang estuary lake, the operation of pumping and drainage stations in the shore of the lake. The mean response time of water level change on Ibpo, Ganggyeong and Gyuam water level station were 39,81 and 160 minutes, when sluice gate was opened respectively. The mean velocity of surface wave, the mean displacement of water level change, the mean time of water level change and the mean rate of water level change varied largely depending on the location of gauging station and the characteristics of stream section of the water level gauging station.

래크바형 수문권양기에 적용된 정유압장치의 컴퓨터 시뮬레이션에 의한 작동특성 연구 (Computer Simulation Study of the Hydrostatic Transmission Applied to the Rack-Bar Type Sluice Gate)

  • 이성래
    • 유공압시스템학회논문집
    • /
    • 제6권2호
    • /
    • pp.14-21
    • /
    • 2009
  • The typical hydraulic hoisting system of the rack-bar type sluice gate is composed of a hydraulic supply unit using an uni-directional pump, a direction control valve, a hydraulic motor, a counter balance valve, and flow control valves. Here, the hydrostatic transmission is applied to the hoisting system of rack-bar type sluice gate to simplify the operation of gate such that the upward and downward direction of gate is simply controlled by the direction of pump rotation. The new hydraulic hoisting system is composed of a bi-directional pump, a hydraulic motor, two counter balance valves, two check valves, two pilot-operated check valves, two relief valves and a shuttle valve. The characteristics of a suggested system are analyzed by computer simulations.

  • PDF

정유압식 래크바형 수문권양기의 개발 (Development of the Rack-Bar Type Sluice Gate Applying the Hydrostatic Transmission)

  • 이성래
    • 유공압시스템학회논문집
    • /
    • 제7권4호
    • /
    • pp.15-22
    • /
    • 2010
  • The typical hydraulic hoisting system of the rack-bar type sluice gate is composed of a hydraulic supply unit using an uni-directional pump, a direction control valve, a hydraulic motor, a counter balance valve, and flow control valves. Here, the hydrostatic transmission is applied to the hoisting system of rack-bar type sluice gate to simplify the operation of gate such that the upward and downward direction of gate is simply controlled by the direction of pump rotation. The new hydraulic hoisting system is composed of a bi-directional pump, a hydraulic motor, a counter balance valve, two check valves, two pilot-operated check valves, two relief valves and a shuttle valve. The characteristics of a suggested system are analyzed by computer simulations and experiments.

  • PDF

정유압식 래크바형 수문권양기의 개발 (Development of the Rack-Bar Type Sluice Gate Applying the Hydrostatic Transmission)

  • 이성래
    • 유공압시스템학회:학술대회논문집
    • /
    • 유공압시스템학회 2010년도 춘계학술대회
    • /
    • pp.86-92
    • /
    • 2010
  • The typical hydraulic hoisting system of the rack-bar type sluice gate is composed of a hydraulic supply unit using an uni-directional pump, a direction control valve, a hydraulic motor, a counter balance valve, and flow control valves. Here, the hydrostatic transmission is applied to the hoisting system of rack-bar type sluice gate to simplify the operation of gate such that the upward and downward direction of gate is simply controlled by the direction of pump rotation. The new hydraulic hoisting system is composed of a bi-directional pump, a hydraulic motor, a counter balance valve, two check valves, two pilot-operated check valves, two relief valves and a shuttle valve. The characteristics of a suggested system are analyzed by computer simulations and experiments.

  • PDF

국내 배수갑문에 설치된 어도의 운영실태 및 개선 방향 (Improvement Plan and Conditions for Operation of Fishways Installed at Sluice Gates in Domestic Dikes)

  • 김재옥
    • 한국관개배수논문집
    • /
    • 제18권1호
    • /
    • pp.44-57
    • /
    • 2011
  • The status of fishway installed in domestic dikes showed a cascade types and sluice gate types 36% (four sites) and 64% (seven sites), respectively. Fishway of cascade type was constructed four sites (Iweon, Busa, Geum river, Haenam) and only Geum river was one of them has operated much more effectively since remodeling in a fishway and fishways of the others was not operated because of several problems like a desalination, a shortage of inflow water and variation of management elevation. Fishway of sluice gate type was installed seven sites and three sites (Yeongsan, Yeongam, Geumho) one of them were continuously operated until now. This results has a interesting interpretations. Prolonged discharge of inductive water from fishway can positively affect not only ascending of fishes but also fish fauna of around of the sea. The others of a sluice gate fishway were not operated because of seawater circulation through sluice gate until now. The closed reasons of fishway in domestic dikes may be summarized as follows: impassibility of sluice gate open by shortage of inflow water, problem of proper operating by long distance of between fishway and management office, absence of operating manual, seawater circulation, lack of fishway operating awareness. It was takes a long time for solution of hardware part but software part can be to find the answer through making a fishway operation manual and development of education program for manager. In this paper we deal with fishway in domestic dikes. Proper fishway control by manager was essential for ascending of migration fishes especially at fishway installed in dikes. Thus it was necessary to make manual for fishway operation and effort of continuously maintenance.

  • PDF

조력발전용 수문 형상에 따른 통수성능에 관한 실험적 연구 - I. 수리모형실험 (Experimental Investigation of Water Discharge Capability According to Shape of Sluice for Tidal Power Generation - I. Physical Experiment)

  • 이달수;오상호;이진학;박우선;조휴상;김덕구
    • 한국해안·해양공학회논문집
    • /
    • 제20권1호
    • /
    • pp.73-80
    • /
    • 2008
  • 이 연구에서는 조력발전소 건설의 경제성에 큰 영향을 미치는 수문(sluice)형상의 설계기술을 향상시키기 위해서 개수로 시스템에서 수리모형실험을 수행하였다. 수문 형상을 결정짓는 주요한 설계 파라미터의 변화가 수문의 통수성능에 미치는 영향이 예측 가능하게 되기 위해서는 기존의 조력발전소 타당성조사 및 설계사업 등에서의 수리모형실험 방법과 차별화 되는 정밀한 실험을 수행해야 할 필요성이 있었다. 이를 위해서 유량공급시설 및 정류수조 내에 다양한 정류장치를 그 형상 및 배치 방법을 다르게 설치하여 관측수로 내 흐름이 최대한 안정화되도록 실험시설을 구성하였다. 그리고 유량 및 수위 계측 과정에서 개입되는 계측 오차를 최소화하기 위한 실험이 이루어질 수 있도록 계측장비의 종류 및 수위 계측위치를 결정하였다. 또한, 개수로 내 흐름에서 불가피하게 발생하는 바닥 및 양측면 마찰에 의한 수두 손실효과를 고려하는 수두차 평가 방법도 제시하였다.

조력발전용 수문 형상에 따른 통수성능에 관한 실험적 연구 - II. 실험결과 및 분석 (Experimental Investigation of Water Discharge Capability According to Shape of Sluice for Tidal Power Generation - II. Experimental Results and Analysis)

  • 이달수;오상호;이진학;박우선;조휴상;안석진
    • 한국해안·해양공학회논문집
    • /
    • 제20권1호
    • /
    • pp.81-92
    • /
    • 2008
  • 이 연구에서는 개수로시스템에 설치된 조력발전용 수문(sluice)에 대한 수리모형실험을 수행하여 취득된 자료의 분석 결과를 제시하였다. 실험은 수문 최소단면의 폭 및 바닥높이가 서로 다른 여섯 가지 수문 모형에 대하여 이루어졌다. 수문의 측면형상이 같을 경우에 수문 최소단면의 폭을 증가시킴으로써 수문의 유량계수는 대체로 증가하였지만, 유량이 작고 수문 상류측의 수위가 낮을 때는 유량계수가 증가하다가 감소하는 경향이 나타났다. 또한, 최소단면의 폭에 무관하게 최소단면의 바닥높이가 높은 경우에 유량계수가 크게 나타났다. 실험결과로부터 기존의 타당성조사 사업 등의 수문 설계시에 주로 적용하였던 유량계수 값은 과소산정되었으며, 따라서 유량계수 값을 상향조정하여 사용하는 것이 타당하다는 결론을 얻었다.

FDC 동조제어기법을 이용한 유압-기계식 수문 제어 모니터링 (Sluice Gates Control Monitoring of Oil Pressure-Machine Using FDC Tuning Control Technique)

  • 허광희;김충길
    • 대한토목학회논문집
    • /
    • 제30권4A호
    • /
    • pp.337-342
    • /
    • 2010
  • 일반적으로 하천 시설에 사용되는 수문은 기계식 및 유압식, 혼합식 권양기에 의하여 개폐되며, 구조물의 크기 및 구조상 2개 이상의 인양장치로 동조를 이루며 안전하게 개폐되어야 한다. 수문의 개폐 시 설계상 정확히 고려할 수 없는 수압 및 마찰로 인하여 구조물에 추가적인 하중이 발생하게 된다. 이러한 추가적인 하중은 수문의 끼임 현상 및 권양기의 과부하 등을 초래하고, 이는 수문의 안전에 중대한 영향을 미치게 된다. 본 논문에서는 이러한 수문의 개폐 시 발생하는 불안전한 요소에 대응하여 권양기가 동조를 이룰 수 있도록 유압 및 변위를 동시에 고려한 FDC(Force-Displacement Control)시스템을 설계하였다. 설계된 FDC 시스템을 XG5000프로그램의 PID 기능을 이용하여 구현하였으며, 다중 유압 실린더 수문 권양기(winch) 모형을 제작하여 FDC 시스템을 실험적으로 검증하였다. 실험 결과 개발한 FDC 시스템은 수문의 개폐 시 발생하는 다양한 외부하중에 대응하여, 다중 유압 실린더로 이루어진 수문 권양기가 동조를 이루며 개폐됨을 확인하였다. 실험 결과로부터 FDC 시스템은 수문 권양기에 적용시 효과적임을 확인 하였다.