• Title/Summary/Keyword: Slope excavation method

Search Result 92, Processing Time 0.032 seconds

Numerical Analysis on the Behavior of a Colluvium Slope Reinforced with Soil Nails and Anchors (소일네일과 앵커로 보강된 붕적층 비탈면의 거동에 관한 수치해석)

  • Jang, Myoung-Hwan;Kim, Hoon-Tae;Yoo, Nam-Jae
    • Journal of Industrial Technology
    • /
    • v.33 no.A
    • /
    • pp.73-80
    • /
    • 2013
  • This paper is results of numerical analysis on the behavior of colluvium slope with combinations of soil nails and earth anchors during excavation. In order to maintain the stability of the colluvium cut, being composed of gravel and boulder and thus local in stability being expected during slope cut, temporary reinforcing method of soil nailing with shotcrete might be used. Subsequent method of cast-in-place facing with earth anchors can be used to maintain cut slope stable permanently. For the cut slope where these methods had been applied, the numerical techniques were applied to their behaviors and investigate the stability of the slope. Limit equilibrium methods were used to confirm to maintain the slope stability during and after excavation and application of those reinforcing methods. Another numerical technique of FEM was also used to find the stress and strain as well as deformation distribution in reinforcing materials and slope ground during excavation.

  • PDF

The Reinforcement Method and Stability Analysis of Cut Slopes (절토사면의 안정해석과 보강방법)

  • 지인택;이달원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.1
    • /
    • pp.112-121
    • /
    • 1997
  • The aim of this study was to analyze the slope stability relating to the failure of cut slopes and the characteristics of stress-strain relations obtained by limit equilibrium method, finite element method, and stereographic projection method for the reinforced cut slopes. The following conclusions were made : 1.To use stereographic projection method led to little possibility to take the toppling and wedge failure while to use the other methods led to the failure. It was recommended to reduce the slope inclination from 1:1 to 1: 1.5~1 :1.8 and adopt coir mesh method to protect the slope surface. position with the horizontal displacement after final excavation moved to the excavation base. The maximum shear strain values concentrated at the excavation base indicated the possibility to induce the local failure. 3. It was recommended that the slope inclination for blast rock with the slope height larger than l0m was 1: 0.5, 1:1, and 1: 1~1 :1.5 for hard rocks, soft and ordinary rocks, and ripping and soils, respectively. 4. Berm width criteria for blast rock with the slope height larger than l0m were recommended as follow : 2~3m per 20m slope height for hard rocks, 1 ~2m per l0m slope height for soft and ordinary rocks, 1 ~ l.5m per 5m slope height for ripping and soils.

  • PDF

Centrifuge Model Experiments and Numerical Analyses on the Behaviour of Excavated Clayey Soil (점토굴착 사면의 거동에 관한 원심모형실험 및 수치해석)

  • Choi, Min Soo;Jeong, Gil-Soo;Park, Byung-Soo;Yoo, Nam-Jae
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.55-62
    • /
    • 2005
  • This paper is the results of experimental and numerical works on analyzing the geotechnical engineering behavior and characteristics of excavated clay slope formed by the method of excavated replacement which is one of treatments in soft soil ground. For the centrifuge model tests, models of excavated clay slope were prepared by remolding the marine clayey soil sampled from the field. Tests were performed with changing the slope to investigate the behavior of them. On the other hand, numerical analyses were carried out to analyze the change of safety factor against instability of slope with time. Changes of pore water pressure, shear strength and displacement were also investigated. As results of centrifuge model tests with slopes of 1:1.5 and 1:3 using the confining body of simulating the effect of excavation, for the case of 1:1.5, slope failure occurred right after remove the confining body whereas relatively small displacements within the range of 3.2mm, implying to maintain the stability of slope, were observed for the case of 1:3 slope. From the results of numerical analyses using the software of PLAXIS to investigate the stability of slope after excavation, the minimum safety factor against slope failure was 1.28 for the case of 1:3 slope. The further researches in the future are required with considerations of build up of static pore water pressures during acceleration of centrifuge, depth of excavation influencing the behavior of the slope and permeability of the slope since excavation of the slope was not simulated well resulted from the limitations of apparatus at the stage of excavation during the centrifuge tests.

  • PDF

A Study on the Rapid Construction Method for Ground Excavation (지반굴착을 위한 급속시공 방안 연구)

  • Sim, Jae-Uk;Son, Sung-Gon;An, Hyung-Jun;Kim, In-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1251-1258
    • /
    • 2008
  • The purpose of this research is to introduce the new temporary earth retaining wall system using landslide stabilizing piles. This system is a self-supported retaining wall(SSR) without installing supports such as tiebacks, struts and rakers. The SSR is a kind of gravity structures consisting of twin parallel lines of piles driven below dredge level, tied together at head of soldier piles and landslide stabilizing piles by beams. There are three types of excavation wall structures: standard method for medium retained heights(<8.0m), internal excavation method and slope excavation method for deep-excavation applications(>8.0m). In the present study, the measured data from seven different sites which the SSR was used for excavation were collected and analyzed to investigate the characteristic behavior lateral wall movements associated with urban excavations in Korea.

  • PDF

Experimental Study on Load Transfer Characteristic by Adjacent Slope Excavation in a Jointed Rock Mass (절리암반에서 근접 사면굴착에 의한 하중전이특성에 대한 실험적 연구)

  • Lee, Jin-Wook;Lee, Sang-Duk
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.321-328
    • /
    • 2009
  • A optimal reinforcement in the joint rock slope excavation adjacent to an existing tunnel would be influenced by excavation distance from the tunnel, slope angel, and joint conditions but has been empirically determined so far. In this study, large scale model tests were conducted to find out the relationship between load translation on the excavation surface and bebavior of the tunnel according to excavation steps of the jointed rock slope. Consequently, two main parameters, joint dip and sloped angle were investigated in those model tests. From the test results, it was found that tunnel deformation was the largest one when the excavation of joints located closer to the tunnel crown or invert. Stability of the slope and the tunnel were varied in a certain excavation stage related to the angle of slope. In the future, based on results of this study the reinforcement method for the tunnel and slope safety in a jointed rock mass will be demonstrated.

A Study of the Existing Slope Stability in a Big City (대도시 기존 사면의 안정화 연구)

  • 이수곤;양홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.265-272
    • /
    • 2001
  • Excavation in a big city is different from excavation in a local area because construction methods and stability are directly connected in a loss of life. Especially, estimate of rock mass slope stability is excuted by more detail and safty work. In this study, we are made reserches in rock mass slope stability and safety method that the slope is closed by elementary school in a big city. The result of many field study and numerical analysis is shown up direct reinforcement used to anchor.

  • PDF

The Slope Stability Establishment with P.C. Anchoring Method (P.C. Anchoring 공법을 활용한 사면안정대책)

  • 박철숙;손재호;인영길;장두희
    • Proceedings of the KSEG Conference
    • /
    • 2002.04a
    • /
    • pp.61-73
    • /
    • 2002
  • Daegok dam is Concrete Face Rockfill Dam(C.F.R.D) of which 52m height, 190m length, that construction in beneath 306, Chanjeon-Ri, Dudong-Myeon, Ulju-Gun, Ulsan Metrocity. Left slope excavation of spillway have related to Daegok dam construction are developing crack in Sta. No. 1~2, EL. 134~137m after 67.0mm rainfall from 2000. 7. 23. 13:00 to 7. 24. 04:00. Surface geological survey and slope stability investigation with stereographic projection method in order of slope stability establishment. Partial supplement excavation and SSL. P. C. Anchoring method is able to pre-stressing are think about unstable element after excavation. This slope stability establishment is very successfully completion.

  • PDF

Safety Assessment to Construction Position of Constructed Steel Structures under Declinating Earth Pressure (편토압을 받는 파형강판 구조물의 시공위치별 안전성 평가)

  • Lee, Sang-Hyun;Lim, Heui-Dae
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.1
    • /
    • pp.28-34
    • /
    • 2008
  • The corrugated steel plate structures is applied to the construction of mountain tunnel portal part with shallow depth, the tunnel on the outskirts of urban areas and ecology move passage. In this study, A finite element method is used for research the behavior of corrugated steel plate structures due to construction position under declinating earth pressure and excavation depth. A finite element method were performed varying construction position(10, 15, 20 and 25m) from slope and excavation depth from surface. The hoop thrust and moment, displacement of corrugated steel plate subjected to construction position and excavation depth is determined from a finite element method. From results of finite element method, it was found that the increase of thrust and the decrease of displacement as the amount of distance increase from slope with construction position. But the thrust and moment, displacement has not different value with excavation depth.

Stability Analysis of Excavation Slope on Soft Ground (연약지반 굴착사면의 안정해석)

  • Kang, Yea Mook;Cho, Jae Hong;Kim, Yong Seong;Kim, Ji Hoon
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.25-38
    • /
    • 1996
  • To investigate the stability problem of irrigation-drainage channel excavation slope on soft ground, analyzed the behavior of the soft ground with excavation slope by the limit equilibrium method and the finite element method, and compared with field tests. The results of this study were summarized as follows; 1. When rapid drawdown the water level, the crack was occurred by the effect of the excess pore water pressure, and the pore water pressure was decreased slowly. 2. As the width of excavation was larger, the crack width was larger. And, excavated depth was deeper, the progressive failure was appeared. 3. When the soft ground excavation was small-scale, the minimum safety factor was more effected by cohesion(1.0, 1.5, 2.0, 2.5, 3.0) than excavated slope inclination(1:l, 1:1.5, 1:2). 4. As excavation was progressed, the settlement occurred on the top-slope due to plastic domain, and heaving was occurred at the bottom of excavation. 5. The maximum shear stress was appeared greatly as the base part of slope went down. Because of the increase of the maximum shear stress, tension area occurred and local failure possibility was increased. 6. As the excavation depth was increased, the maximum shear strain was appeared greatly at the base of slope and distribution pattern was concentrated beneath the middle of slope.

  • PDF

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF