• Title/Summary/Keyword: Slab track

Search Result 223, Processing Time 0.036 seconds

A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads (고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구)

  • 조병완;김영진;허민회;정태호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.493-598
    • /
    • 2000
  • In the rail facilities, the rail track consists of rail, tie, fastening, accessories and bed. The rail track is largely divided into Ballast Bed Track (BBT) and Concrete Bed Track (CBT) according to the type of bed. In this thesis, among Concrete Bed Track, slab track, which is used for the Japanese high speed railway, is a target of this study. Dynamic analysis by using finite element method are performed where moving train load is periodic function. Then through parametric study, some conclusions are obtained as follows. Cement Asphalt Mortar (CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore, change of CAM spring coefficient should be handled with care. For slab thickness, thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated. Improved structural type is proposed, then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF

Evaluation of Vibration and Noise character on the Floating Slab Track (부유궤도의 진동$\cdot$소음 특성 평가)

  • Hun Young;Lee sang jin;Kim gi hun;Lee in se
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.343-348
    • /
    • 2003
  • As one of countermeasures for vibration and noise source which come from train operation in subway system, the heavy-weighted tunnel structure and the low-vibration track design have been adopted. In recent the low-vibration concrete track have been constructed to enhance the maintenance effectiveness as well as the reduction of vibration. This paper is explaining and evaluating of the characteristics of vibration and its effects comparing to tile ballast track, concrete track, and full surface supported floating slab track installed on Express bus terminal in Seoul subway No. 7 line.

  • PDF

Trial Installation and Performance Evaluation of Prefabricated Concrete Slab Track on Revenue Line (프리캐스트 콘크리트 슬래브궤도의 영업선 시험시공 및 성능평가)

  • Jang, Seung-Yup;Kang, Yun-Suk;Lee, Hu-Sam;Kim, Yu-Bong;Lee, Jong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.840-845
    • /
    • 2008
  • To develop our original technology of concrete slab track, being widely accepted for new track, prefabricated concrete slab track, or precast concrete slab track has been developed. They have two different types according to slab shape and its dimensions, connection of slabs and connecting structure onto substructure. After the system design and successful performance evaluation in the laboratory, the trial installation on revenue line has been carried out. This paper is presenting the result of the trial installation and the performance tests in field. The performance tests have been performed as visual inspection for cracks and damages, measurement of track alignment and elastic behavior of track under passing trains. The performance test results during last 2 years have shown that no remarkable damages and settlements were found, and track alignment and elastic track behavior both exhibits good status.

  • PDF

A New Slab Track System (새로운 슬래브궤도 시스템)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.213-218
    • /
    • 2002
  • A new German high speed railway slab track was investigated. The construction objective was to provide a durable and maintenance free track system consisting of precast concretepanels of consistently high quality and highest achievable accuracy in track geometry. The System on the basis of precast panels similar to the slab track system constructed on the line Dachau- Karlsfeld in 1997.

  • PDF

The effect of the poor infilling of the underpouring in precast slab track system on structural behavior (프리캐스트 슬래브 궤도 시스템의 충전층 충전불량이 궤도구물의 구조적 안전성에 미치는 영향)

  • Kim, Yoo-Bong;Kang, Young-Jong;Moon, Do-Young;An, Ki-Hong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.256-260
    • /
    • 2010
  • It has been proved that precast slab track has advantage of rapid construction speed and good quality compared to in-situ concrete slab track. A korean precast slab track, which is named as a K-PST, was developed and had been installed on the embankment and explored on the air. The developed track system consists of precast track panel and underpouring layer which is made of cement-asphalt mortar. Consequently, poor filling of underpouring layer directly could affect on the long-term performance of the track system. As a preliminary study, the effect of the poor infilling of the underpouring in precasst slab track system on structural behavior was investigated through FEM analysis.

  • PDF

Behavior of Fastening system of HSR bridge ends deck on Slab Track installed Bridge (슬래브궤도가 부설된 고속철도 교량단부 체결장치의 거동)

  • Chun, Dae-Sung;Choi, Jung-Youl;An, Hea-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1637-1646
    • /
    • 2008
  • Deformations of bridge deck ends on abutment can cause extreme deformations on track. Especially, since slab track was fixed onto the bridge deck slab on concrete slab track installed bridges, deformations of bridge deck ends directly affect the slab track behavior, and thus these interactions can bring about the premature failure of rail fastenings or other deteriorations to lower the serviceability. In this study, a foreign standard to evaluate forces on track components caused by the track-bridge interactions and the behavior of bridge deck ends was investigated and for real scale bridges. It was found that rail support spring coefficients, as well as toe loads, support spacing were very important parameters.

  • PDF

Construction and Development of Turnout on concrete roadbed applicable to high speed railway (고속철도 적용을 위한 콘크리트 도상 분기기 개발 및 부설)

  • Park, Choon-Bok;Kwon, Ho-Jin;Jeon, Se-Gon;Yoon, Byung-Hyun;Oh, Soo-Jin;Choi, Yong-Seok
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1223-1228
    • /
    • 2007
  • Since KHSL 2nd phase was adapted as a main track design, the interests of concrete slab track system have been gradually increased in the division of rail track engineering and many engineering companies have been trying to adapt a concrete slab track system at this moment. Advantages of this system proved in advanced country, japan and Germany etc. are excellent maintenance, track stability and increasing of buckling resistance This developed turnout is same with the KHSR 1st phase's design and applications rules, components and signaling system since it observes KTX specification. Comparing it with the former turnout, High-elasticity pad, lubrication-free roller slide plate and Rheda2000 PC sleeper are only different. The purpose of this study is the development of high speed turnout on concrete slab track and its application on site. Now these studies are going to show the verification and confidence about the interface between ballast-track and concrete slab track by finding and solving the possible problems when it is installed on site and to make these turnouts applied perfectly and completely on concrete slab track. Its first trial construction in korea had been successfully completed at Sangju-station on July 20th ,2007 thanks to KORAIL and KR. Hereunder Sampyo E&C trys to introduce all of turnout technologies on concrete slab track system with Rheda 2000 sleeper

  • PDF

A Behavior Analysis of HSR concrete slab track under Variety of Rail pad stiffness on fatigue effect (피로효과를 고려한 레일패드 스프링계수 변화에 따른 콘크리트 슬래브 궤도의 거동분석)

  • Eom, Mac;Choi, Jung-Youl;Chun, Dae-Sung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.340-350
    • /
    • 2007
  • The major objective of this study is to investigate the fatigue effects of rail pad on High Speed Railway with concrete slab track system. It analyzed the mechanical behaviors of HSR concrete slab track with applying rail pad stiffness based on fatigue effect(hardening and increasing stiffness) on the 3-dimensional FE analysis and laboratory test for static & dynamic characteristics. As a result, the hardening of rail pad due to fatigue loading condition are negative effect for the static & dynamic response of concrete slab track which is before act on fatigue effect. The analytical and experimental study are carried out to investigate rail pad on fatigue effected increase vertical acceleration and stress and decrease suitable deflection on slab track. And rail pad based on fatigue effect induced dynamic maximum stresses, the increase of damage of slab track is predicted by adopting fatigue effected rail pad. after due consideration The servicing HSR concrete slab track with resilient track system has need of the reasonable determination after due consideration fatigue effect of rail pad stiffness which could be reducing the effect of static and dynamic behavior that degradation phenomenon of structure by an unusual response characteristic and a drop durability.

  • PDF

Numerical analyses on the effects of micro pile installation beneath slab tracks (슬래브궤도 하부의 마이크로파일 설치효과 수치해석)

  • Lee Su-Hyung;Kim Dae-Sang;Lee Il-Wha;Chung Choong-Ki
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.922-927
    • /
    • 2004
  • The bending moment and settlement of the slab track can be reduced by the installation of small numbers of micro piles beneath the track. This paper presents the effect of micro pile installation on the reduction of bending moment and settlement of slab track, estimated by a numerical method. The slab track is modeled as a plate based on the Mindlin's plate theory, and soil and piles are modeled as Winkler and coupled springs, respectively. The stiffness of piles is obtained by the approximate analytical method proposed by Randolph and Wroth. and the modulus of subgrade reaction is adopted to evaluate Winkler spring constant. From the analysis results, the effect of the micro pile installation is significant to considerably reduce the settlement of slab track. However, for the proper reduction of bending moments in a slab track, the pile arrangement should be reasonably taken into account to prevent the stress concentration at pile location.

  • PDF

A Study on the Criteria of Settlement in Concrete Slabtrack (토노반상 콘크리트궤도의 노반허용침하기준설정에 관한 연구)

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Yun-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.355-364
    • /
    • 2007
  • Recently a concrete slab tracks are being constructed on roadbed in the Gyoeng-bu 2nd phase high speed railways. In respdnding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides a roadbed design criteria and the maintenance system. The proposed roadbed design criteria and the maintenance system are based on the developed analysis meathod of train/slab-track interaction. where the roadbed settlement and train speed are utilized as mediating variables. In the analysis, the dynamic response of train/slab-track interaction apply to various speeds and settlements. the roadbed settlement is shown in a sinusoidal shape of wave, the scope of the settlement occurrence presented in its wavelengths, include 6meters, 10meters, 15merwes, 20meters, 30meters. The train speeds involved are 50, 100, 150, 200, 250, 300, 350, 400kilometers per hour.