• 제목/요약/키워드: Site risk management

Search Result 407, Processing Time 0.025 seconds

Construction Risk Assessment Methodology Using Site Risk Influence Factors (건설현장 위험영향요소 기반의 위험도 산정 방법론)

  • Lee, Hyun-Soo;Kim, Hyun-Soo;Park, Moon-Seo;Lee, Kwang-Pyo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Considering variable and changeable characteristics of construction site, risk of same trade can be different by combination of inherent characteristics. But established safety management has performed like other industries not reflecting characteristics of construction. So, to suggest risk assessment methodology considering risk influence factors in construction site, this study extracts risk influence factors by literature reviews and surveys, builds the weighting system for classification of factors. And risk of trade is calculated based on frequency and severity of risk. Risk assessment methodology is suggested by integrating risk influence factors and risk of trade. From this, risk considering the conditions of construction sites can be derived and based on the derived risk, safety management can be performed more effectively. This study has meaning for assessing the risk which can reflect characteristics of construction site considering risk influence factors.

A Study on the Control of Hazard Facilities Management system in Urban area by utilizing GIS (지리정보시스템(GIS)을 이용한 도심지 내의 위해시설 관리시스템 구축에 관한 연구)

  • Ham, Eun-Gu;Roh, Sam-Kew
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.4 s.19
    • /
    • pp.9-15
    • /
    • 2005
  • This research developed the RMIS(Risk Management Information System) which focus on works of risk management fields required of apply of a space information, and focus on the DB to establish and apply the space information efficiently with research scope on the LPG refueling station in city. On the basis of the RMIS, this research provides the baseline to lead on an efficiency of safety inspection of LPG refueling station, advance risk assessment, and efficient making decision of an accident correspondence assessment with interlocking the GIS representing risk through the automation of a quantitative risk assessment standardize requirement to control at real-time. The RMIS development process is as follows. firstly, Relational Database(RDB) was developed by using fundamental data both On-site and Off-site relating data as peforming risk assessment on the LPG refueling station in city. Second, the risk management integral database system was developed to monitor and control the risk efficiently for user with using the Visual Basic Program. Third, through interlocking the risk management integral database system and the GIS(Falcon-map) was suggested the decision making method. Represented results through out the RMIS program development are as follows. Firstly, the RMIS was established the mutual information to advance management the risk efficiently for user and inspector with using the risk management data. Second, as this study managed risk for on-site and off-site separately and considered effect for inside and outside of facility, constructed the basis on safety management which can respond to major accident. Third, it was composed the baseline to making decision that on the basis of user interface.

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF

Weighting Factor of Consciousness between Main and Sub Contractor for Establishing an Effective Risk Management in Construction Industry (건설현장 공사주체간 위험성관리의식의 중요도 설정에 관한 연구)

  • Son, Ki-Sang;Eun, Nam-Kwon
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.4
    • /
    • pp.72-80
    • /
    • 2013
  • Accident prevention plan it a construction site should be analyzed and made with risk evaluation and management, from recent year, in Korea. Accidents occurred in construction site are related to all parties such as owner, main and subcontractor, labour. But analyzing some relationship between main and subcontractor is very important to estimate what risk between then are existed in a site. There are some different aspects concerning with risk management between them. Everywork has its own risk in there, This is the reason why everywork which are made by subcontractor himself should be evaluated for risk level. And main contractor should provide for subcontractor to prevent each risk at the work, all the time.

A study on the Research & Analysis of the Health and safety Managing's Understanding on the Applied Construction work site Risk Assessment - Focus on Site manager & manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choe, Su-Hwan;Bae, Jun-Tae;Lee, Yeon-Su;Kim, Chi-Gyeong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.1-11
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

  • PDF

Construction site disaster risk analysis method Using big data Considering individual work units of construction partner company (협력업체 작업 단위를 고려한 빅데이터 기반 건설현장 재해위험도 분석 방안)

  • Choi, Hochang;Lee, Jung-chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.265-266
    • /
    • 2023
  • Recently, many disasters have occurred due to poor management of construction site. In addition, as legal regulations on safety management at construction sites are strengthened, its importance is being further emphasized. In relation to smart safety management technology, a study was introduced to build an analysis model through various safety-related data collected within construction companies. This model derives quantitative disaster risk about the site level through information related to past disasters and near misses. However, construction work is performed separately by work group of each partner company. There is a limitation in that individual workers cannot directly experience this analysis information. In this study, we propose a method to derive the safety disaster risk of individual work units from disaster risk of the site level. We expect that this study to be helpful for smart safety management technology of construction sites.

  • PDF

Viaduct seismic response under spatial variable ground motion considering site conditions

  • Derbal, Rachid;Benmansour, Nassima;Djafour, Mustapha;Matallah, Mohammed;Ivorra, Salvador
    • Earthquakes and Structures
    • /
    • v.17 no.6
    • /
    • pp.557-566
    • /
    • 2019
  • The evaluation of the seismic hazard for a given site is to estimate the seismic ground motion at the surface. This is the result of the combination of the action of the seismic source, which generates seismic waves, the propagation of these waves between the source and the site, and site local conditions. The aim of this work is to evaluate the sensitivity of dynamic response of extended structures to spatial variable ground motions (SVGM). All factors of spatial variability of ground motion are considered, especially local site effect. In this paper, a method is presented to simulate spatially varying earthquake ground motions. The scheme for generating spatially varying ground motions is established for spatial locations on the ground surface with varying site conditions. In this proposed method, two steps are necessary. Firstly, the base rock motions are assumed to have the same intensity and are modelled with a filtered Tajimi-Kanai power spectral density function. An empirical coherency loss model is used to define spatial variable seismic ground motions at the base rock. In the second step, power spectral density function of ground motion on surface is derived by considering site amplification effect based on the one dimensional seismic wave propagation theory. Several dynamics analysis of a curved viaduct to various cases of spatially varying seismic ground motions are performed. For comparison, responses to uniform ground motion, to spatial ground motions without considering local site effect, to spatial ground motions with considering coherency loss, phase delay and local site effects are also calculated. The results showed that the generated seismic signals are strongly conditioned by the local site effect. In the same sense, the dynamic response of the viaduct is very sensitive of the variation of local geological conditions of the site. The effect of neglecting local site effect in dynamic analysis gives rise to a significant underestimation of the seismic demand of the structure.

Future Direction on Policy and Technology Development for the Risk-based Contaminated Site Management (위해성 기반 오염부지관리를 위한 정책 및 기술개발 방향)

  • Cho, Myung-Hyun;Kim, Do-Hyung;Baek, Kitae
    • Journal of Soil and Groundwater Environment
    • /
    • v.22 no.5
    • /
    • pp.48-62
    • /
    • 2017
  • Korea and other countries have made various efforts to preserve soil. During the past several decades, Korea has implemented various policies on soil conservation practices; however, those policies have often lacked consideration of human and ecosystem risk management. while other countries have practiced various policies closely related to risk-based management for contaminated sites. Therefore, there is a great need for a paradigm shift of policy to better manage contaminated sites in risk-based strategies, while applying different management plans for soil and groundwater. In addition, the new policies should be administered with provision to improve soil health and related functions in ecosystem. This study has reviewed the trend in relevant policies in Korea and foreign countries to suggest the future policy directions for contaminated site management in Korea. For better management of contaminated sites, coherent policy that could complement the law, system, and relevant technology is required.

Improvement of Synthesis Construction Plan through 6sigma (6시그마를 통한 종합시공계획서 작성 프로세스 개선)

  • Baek, Ho-Jin;Yoo, Chang-Kyu;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.613-617
    • /
    • 2007
  • To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

  • PDF

A Strategy for the Generation of Accident Scenarios Using Multi-Component Analysis in Quantitative Risk Assessment (화학공정 위험영향 평가기술에서의 다중요소분석기법을 이용한 사고시나리오 산정에 관한 전략)

  • 김구회;이동언;김용하;안성준;윤인섭
    • Fire Science and Engineering
    • /
    • v.15 no.4
    • /
    • pp.24-33
    • /
    • 2001
  • This article proposes a strategy for producing accident scenarios in quantitative risk, which is peformed in process design or operation steps. Present worldwide chemical processes need off-site risk assessment as well as on-site one. Most governments in the world require industrial companies to submit the proper emergency plans through off-site risk assessment. Korea is also preparing for executing Integrated Risk Management System along with PSM and SMS. However.

  • PDF