• 제목/요약/키워드: Site Risk

검색결과 1,327건 처리시간 0.032초

굴착기 투입 작업의 위험성 평가모델 개발 (Development of a Risk Assesment Model for Excavator Work)

  • 강수민;나보현;양예진;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.133-134
    • /
    • 2022
  • Recently, the criteria for assessing industrial accidents have been replaced by the mortality rate. It was found that the number of deaths from excavation work was the highest among construction machinery. The risk assessment is being conducted, however the industrial accident mortality rate has not decreased. Accordingly, this study aims to provide the basic for the create of a risk assessment model specialized in construction work at excavator. It provides absolute value from the risk model which is capable of delivery the probability of a disaster. In addition, we provide a relative risk model that compares the risk through scores between detailed works. The relative risk model is combined by likelihood and severity; the likelihood indicates the frequency of accidents and the severity indicates seriousness of fatal accidents. A variable that reflects the conditions of the construction site was added to the risk assessment model based on past disaster cases. And using the concepts of probability and average, the risk assessment process was quantified and used as an objective indicator. Therefore, the model is expected to reduce disasters by raising the awareness of disasters.

  • PDF

해상풍력발전의 HSE 관리를 위한 모델기반 HSE 위험성 평가 모듈 개발 및 평가 (Development and evaluation of a model-based HSE risk assessment module for HSE management in offshore wind power)

  • 김성래;남건우;이태경;강대영;김준영
    • 시스템엔지니어링학술지
    • /
    • 제19권2호
    • /
    • pp.74-91
    • /
    • 2023
  • This study provides an in-depth comparison and analysis of various risk assessment models widely used in modern industries, and proposes the most suitable model for risk assessment of offshore wind power in Korea. The assessment models were selected by considering various factors such as the purpose of risk assessment, stakeholder requirements, and characteristics of offshore wind power. We also emphasized the importance of using different risk assessment models in combination in situations of high uncertainty. To systematize the combination of risk assessment models, we used systems engineering which is effective to develop a new system. Systems engineering was used to define the complete, traceable functions from site requirements, and model-based systems engineering was used to manage the design information from requirements to detailed functions in a single model. The developed risk assessment module provide automatic conversion between risk assessment models to enable risk assessment suitable for offshore wind power. The functionality and usability of the offshore wind risk assessment module were verified by the evaluation of three wind power experts.

3D 재해 정보 표출시스템과 현장 지원 APP간의 연계를 통한 효과적인 Risk Map 정보제공 방안 (A Plan to Provide Effective Risk Map Information by Linking a 3D Disaster Information Display System with an On-site Assistance Application)

  • 김도령;강수명;류동하;박주성;조명희
    • 한국지리정보학회지
    • /
    • 제19권1호
    • /
    • pp.141-153
    • /
    • 2016
  • 자연재해의 발생빈도 증가와 대규모화는 전 세계적 기후변화와 도심 및 인간 생활환경의 변화로 인해 발생하는 대표적인 부정적 사례라고 할 수 있다. 특히 자연재해에 의해서 일어나는 피해는 인적, 물적 등 시민의 안전 및 재산과 직결된다. 그뿐만 아니라, 그 피해는 SOC 시설물에도 직 간접적으로 발생한다. SOC 시설물의 경우 재난 발생에 의한 손상 시에 시민의 안전에 대한 권리 침해 등을 초래한다. 따라서 본 연구는 재난 발생 시에 일어날 수 있는 교량, 보, 댐 등의 SOC 시설물에 대한 피해 정보를 다루고 있는 3D 재해정보 표출시스템과 현장지원 어플리케이션간의 신속하고 효과적인 Risk Map 정보 제공 방안을 제시한다. 본 연구에서는 신속한 Risk Map 정보 제공을 동적 표현 기술이라고 정의하고, 이를 재난정보를 표출하는 시스템과 정보를 현장에서 활용할 수 있는 확산시스템, 또한 이러한 관계 정보를 구축하고 있는 DB 시스템과 유기적으로 연동할 수 있도록 모듈을 개발한다. 해당 모듈에서는 재난 정보를 가공 및 압축하여 효율적으로 정보를 제공 가능할 수 있도록 하였다. 이를 기반으로 효율적인 재난 정보 압축방안을 마련하며, 향후 신속한 정보 송 수신 체계를 확보할 수 있다.

Diversity of Arbuscular Mycorrhizal Fungi Associated with a Sb Accumulator Plant, Ramie (Boehmeria nivea), in an Active Sb Mining

  • Wei, Yuan;Chen, ZhiPeng;Wu, FengChang;Li, JiNing;ShangGuan, YuXian;Li, FaSheng;Zeng, Qing Ru;Hou, Hong
    • Journal of Microbiology and Biotechnology
    • /
    • 제25권8호
    • /
    • pp.1205-1215
    • /
    • 2015
  • Arbuscular mycorrhizal fungi (AMF) have great potential for assisting heavy metal hyperaccumulators in the remediation of contaminated soils. However, little information is available about the symbiosis of AMF associated with an antimony (Sb) accumulator plant under natural conditions. Therefore, the objective of this study was to investigate the colonization and molecular diversity of AMF associated with the Sb accumulator ramie (Boehmeria nivea) growing in Sb-contaminated soils. Four Sb mine spoils and one adjacent reference area were selected from Xikuangshan in southern China. PCR-DGGE was used to analyze the AMF community composition in ramie roots. Morphological identification was also used to analyze the species in the rhizosphere soil of ramie. Results obtained showed that mycorrhizal symbiosis was established successfully even in the most heavily polluted sites. From the unpolluted site Ref to the highest polluted site T4, the spore numbers and AMF diversity increased at first and then decreased. Colonization increased consistently with the increasing Sb concentrations in the soil. A total of 14 species were identified by morphological analysis. From the total number of species, 4 (29%) belonged to Glomus, 2 (14%) belonged to Acaulospora, 2 (14%) belonged to Funneliformis, 1 (7%) belonged to Claroideoglomus, 1 (7%) belonged to Gigaspora, 1 (7%) belonged to Paraglomus, 1 (7%) belonging to Rhizophagus, 1 (7%) belonging to Sclervocystis, and 1 (7%) belonged to Scutellospora. Some AMF sequences were present even in the most polluted site. Morphological identification and phylogenetic analysis both revealed that most species were affiliated with Glomus, suggesting that Glomus was the dominant genus in this AMF community. This study demonstrated that ramie associated with AMF may have great potential for remediation of Sb-contaminated soils.

해체부지의 잔류방사능 조사 절차 수립에 관한 연구 (Study on the Establishment of Residual Radioactivity Investigation Procedure in Decommissioning Site)

  • 김학수;임용규;박경록;손중권;강기두;김경덕;정찬우
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2004년도 학술논문집
    • /
    • pp.24-31
    • /
    • 2004
  • 원자력발전소를 안전하게 해체하기 위해서는, 해체부지 개방기준의 준수여부를 확인하기 위해 수행되는 환경이나 설비의 방사선학적 조사의 계획, 실시 그리고 평가에 대한 상세 지침을 제공하는 절차가 필요하다. 본 연구에서는 해외 원전 해체 사례와 MARSSIM을 근간으로 부지운영이력평가, 오염범위조사, 오염현황 상세 조사, 제염복구 지원조사, 최종부지조사의 순으로 해체 부지내 잔류방사능을 조사하는 절차를 제시하였다.

  • PDF

ASTM 규격을 통한 국내 부지조사 기법 개발

  • 안훈기;권영호;박신영;이영훈;공성호
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2002년도 총회 및 춘계학술발표회
    • /
    • pp.291-294
    • /
    • 2002
  • The Environmental Site Assessment System(ESAS) in Korea which became effective as of 2002 is very similar to the ASTM standard practice in United States. Unlike the United States, however, we do not have Phase I ESA, enough environmental professionals with approved training and practical experiences, and detailed guidelines for a governmental action. As a result of comparison the ESAS with the ASTM standard practice, the ASTM standard practice is focused on the Innocent Landowner Defense and has a difference in data search process as well as legal and methodological ways from the ESAS. Therefore, the Transaction Screen Process in ASTM E-1528 standard practice is suggested to reduce the risk potentially produced under on-site assessment and to achieve efficient on-site assessment. In addition, social and executive supports are discussed to more activate on-site assessment. In near future this study is expected to be standardized more in detail with activation of on-site assessment and it is also expected to increase the role and responsibility of environmental professionals considerably.

  • PDF

건설현장의 위험성평가 효율적 활용을 위한 운영 시스템 구축사례 분석 - H 건설사 사례중심으로 (Analysis of Operation System Establishment Cases for Efficient use of Risk Assessment at Construction Sites - H Focusing on Construction Company Cases)

  • 이재붕
    • 한국재난정보학회 논문집
    • /
    • 제18권4호
    • /
    • pp.828-838
    • /
    • 2022
  • 연구목적: 위험성평가의 전산시스템 구축을 통해 건설현장에서 위험성평가 대상 공종 근로자가 쉽게 작성할 수 있고 효율적 위험성평가 활동으로 재해 저감을 기대할 수 있는지의 사례 분석을 목적으로 한다. 연구방법: 작업공종 분류만으로 해당작업의 위험요인과 안전대책을 제공받아 위험추정과 대책수립을 할 수 있으며, 해당작업의 재해사례 제시로 실질적 재해예방 활동이 가능하도록 시스템을 구축하였다. 연구결과: H건설사의 ERP내 위험성평가 전산시스템 구축 이후 현장적용에 따른 년간 환산재해율 변화분석을 통해 국내 건설업의 환산재해율이 증가하는 반면 H건설사의 환산재해율은 감소하였음을 확인하였다. 결론: 위험성평가 전산시스템화를 통해 현장작업 대상 근로자가 위험성평가에 쉽게 접근할 수 있고 해당공정의 위험요인 평가 및 위험예방 대책의 수립이 가능하게 되어, 평가 기간 동안 실제 재해율 감소에 영향이 있는 것으로 분석되었다.

쉴드 TBM 터널에 적용 가능한 리스크 관리: II. 리스크 분석 방법 (Risk management applicable to shield TBM tunnel: II. Risk analysis methodology)

  • 현기창;민상윤;문준배;정경환;이인모
    • 한국터널지하공간학회 논문집
    • /
    • 제14권6호
    • /
    • pp.683-697
    • /
    • 2012
  • 본 논문에서는 쉴드 TBM 터널에서 적용 가능한 리스크 분석 방법을 연구하였다. FTA 방법을 통해 리스크 아이템과 각각의 발생확률을 확인하고 AHP 방법을 통해 각각의 리스크 아이템의 영향도를 구하였다. 마지막으로 각각의 리스크 아이템의 리스크 레벨을 평가할 수 있었다. 개발된 방법을 EPB 쉴드 터널이 사용된 서울 지하철 현장에 적용하여 리스크 분석 결과가 현장 데이터에 부합하는 합리적 결과임을 검증하였다.

건설공사의 리스크분석을 위한 퍼지평가모형 개발 (Development of Fuzzy Model for Analyzing Construction Risk Factors)

  • 박서영;강인석;김창학;손창백
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.519-524
    • /
    • 2001
  • 국내·외적으로 건설공사의 리스크관리에 대한 중요성은 더욱 커져가고 있지만, 합리적인 리스크인자의 구축방법과 개별 리스크인자의 분석 및 정량화가 용이하지 않기 때문에 실무적 운용이 가능한 리스크분석시스템을 구축한 경우는 극히 미흡한 실정이다. 본 연구에서는 전문가의 주관적 판단과 언어적 변량을 이용하여 리스크를 정량화하기 위한 퍼지분석방법을 제시한다. 본 퍼지분석방법은 건설공사의 리스크인자를 발생확률 발생강도, 발생빈도로 구분하여 평가하게 함으로서 그 적용성과 정확성을 높일 수 있도록 하였고, 언어적 변량을 이용하여 리스크를 정량화하기 때문에 복잡한 자료의 구축과 분석시간을 단축하였으며, 그 적용이 매우 쉽다는 장점을 갖게 된다.

  • PDF

A Risk Evaluation Model Using On-Site Meteorological Data

  • Kang, Chang-Sun
    • Nuclear Engineering and Technology
    • /
    • 제11권2호
    • /
    • pp.127-132
    • /
    • 1979
  • 원자력 시설에서 방사선 방출에 의한 주거 인구에 미치는 영향을 분석평가하는데 부지의 기상 조건을 직접 관련시키는 방법을 고려해 보았다. 이 방법은 정상가동시에 누출되는 방사능과 가상사고시의 누출로 부터 자연환경에 주는 영향을 보다 현실에 맞게 평가하는데 사용될 수 있다. 개개인이 받을 방사선량과 전체인구가 받을 피폭선량을 보다 논리적으로 계산함으로써 설비 설계에 반영하여 누출량과 대기내의 화산을 별도로 분석하여 평가하는 재래식 방법으로 부터 초래되는 필요 이상의 안전설계를 지양할 수 있다.

  • PDF