• Title/Summary/Keyword: Site Planning Optimization

Search Result 34, Processing Time 0.024 seconds

A Process of Optimization for the Best Orientation of Building Façades Based on the Genetic Algorithm by Utilizing Digital Topographic Map Data (수치지형도 데이터를 활용한 유전자 알고리즘 기반 건축외피의 최적향 산정 프로세스)

  • Choe, Seung-Ju;Han, Seung-Hoon
    • Land and Housing Review
    • /
    • v.13 no.1
    • /
    • pp.113-129
    • /
    • 2022
  • A building's eco-friendliness is directly related to various values including the life cycle cost of a building. However, the conventional architectural design method has a limitation in that it cannot create an optimized case according to the surrounding environmental conditions. Therefore, the purpose of this research is to present a design assistance tool that can review planning cases optimized for the environmental conditions of the building site in the planning stage of architectural production. To achieve the purpose of the study, an algorithm for realizing 3D modeling of the region and analysis of the solar environment was produced based on the site contours, building, and road information from the digital topographic map provided by the National Geographic Information Institute. To examine the validity of the developed algorithm, a comparative experiment was conducted targeting the elevation direction of the existing building. As a result, it was found that the optimal elevation direction selected by the algorithm can receive higher insolation compared to the front facade of the main building.

Regional Assessment of Seismic Site Effects and Induced Vulnerable Area in Gyeonggi-do, South Korea, Using GIS (GIS 기반 경기도 광역영역의 부지지진응답 특성 및 연계 지진 취약지역 분석)

  • Kim, Han-Saem;Sun, Chang-Guk;Cho, Hyung-Ik;Nam, Jee-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.5
    • /
    • pp.19-35
    • /
    • 2018
  • The necessity of predicting the spatial information of the site-specific seismic response, which is essential information for the comprehensive earthquake disaster countermeasures, is increasing for the mid-west urban areas where the earthquake-induced damages can be increased due to frequent occurrence of mid-scale earthquake such as 2016 Gyeongju Earthquake and 2017 Pohang Earthquake. Especially, researches on strategic securing of site survey datasets and understanding the site-specific site response characteristics were conducted for Gyeonggi-do, South Korea. In this study, a GIS-based framework for site-specific assessment of site response and induced vulnerable area in Gyeonggi-do, South Korea was proposed. Geo-Data based on GIS platform was constructed for regional estimation of geotechnical characteristics by collecting borehole and land coverage datasets. And the geo-spatial grid information was developed for deriving spatial distribution of geotechnical layer and site response parameters based on the optimization of the geostatistical interpolation method. Accordingly, base information for Improving earthquake preparedness measures was derived as seismic zonation map with administrative sub-units considering the quantitative site effect of Gyeonggi-do.

The Strategy for Interconnection Branch Line Construction used Optimization Program (최적화 기법을 적용한 효율적인 철도 연결선 구축 전략)

  • Kim, Yong-seok;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.853-858
    • /
    • 2019
  • One of the methods which can enhance the efficiency of railroad network is construction of interconnection branch line for several route to share one railway. In Korea, this method already has been implemented or excuted as project level. This study suggests a network design model and a solution algorithm to choice most proper site to construction it and determine the priority of branch lines which can be considered in planning level, not project level. The model is a non-linear optimization program which minimize total cost-construction cost, operating cost and passengers' travel cost. The decision variables are a binary variable to explain whether construction or not and its direction and a integer variable of the frequencies of travel routes. The solution algorithm-problem solution and route choice and also the result of implementation for example network are suggested. This result can be more advanced after application in real network and calibration of parameters.

Estimation of Optimum Capacity for Rainwater Storage Facilities based on Mass Balance and Economic Analysis (Mass-balance 및 경제성 분석에 의한 빗물저류시설 적정 규모 산정)

  • Kim, Youngmin;Lee, Sangho;Lee, Jung-Hun;Kim, Ree-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.2
    • /
    • pp.233-238
    • /
    • 2008
  • Recently, rainwater harvesting facilities have increasingly constructed mainly in elementary schools and government buildings. Nevertheless, few methods are available for efficient planning and design of rainwater harvesting facilities by considering the weather conditions and purpose of rainwater management in each site, which may lead to a construction of uneconomic facilities. The current method estimates the size of rainwater storage tank by multiplying the size of building or plottage with a certain ratio and has many limitations. In this study, we first developed a method for planning and design of rainwater storage facilities using $Rainstock^{TM}$ model, which is based on mass balance, and economic analysis. Then, the model was applied for the design of a rainwater harvesting facility in a building with the catchment area of $1,000m^2$. The model calculation indicated that the economic feasibility of rainwater harvesting depends on not only the size of storage tank but also the water usage rate. When the water usage rate is $1m^3/day$, the rainwater harvesting facility is not cost-effective regardless of the size of the storage tank. With increasing the water usage rate, the economical efficiency of the facility was improved for a specific size of the storage tank. Based on the model calculation, the optimum tank sizes for $5m^3/day$ and $10m^3/day$ of water usage rates were $24m^3$ and $57m^3$, respectively. It is expected that the model is useful for optimization of rainwater storage facilities in planning and designing steps.

Estimation of Optimal Harvest Volume for the Long-term Forest Management Planning using Goal Programming (장기산림경영계획의 목표수확량 산출을 위한 목표계획법의 적용)

  • Won, Hyun-Kyu;Kim, Young-Hwan;Kwon, Soon-Duk
    • Journal of Korean Society of Forest Science
    • /
    • v.98 no.1
    • /
    • pp.125-131
    • /
    • 2009
  • To facilitate the sustainable forest management, Forest Service in Korea has assigned 2.9 million hectare forests as 'intensive management forests' and encouraged local governments to develop a strategic management plan for their forests. One of problems for the sustainable forest management in Korea is the skewed distribution of forest age classes. Currently the majority of forestlands in Korea is occupied by age classes III and IV. In this study, we intended to find an optimum harvest volume, which enable one to make the intensive management forest in Youngdong-Gun evenly distributed for the age classes and allow an even harvest volume through a 50 year time horizon. To develop an optimization model, we applied the goal programming technique which is adequate for a multi-purpose management planning. The results indicated that it is necessary to harvest 1.2 million cubic meters in each decade to achieve the most stable distribution of age classes for the study site. The harvest volume target resulted from this study would be used in a management planning or an associated policy making process in the future.

Lifting Work Process Optimization Method in High-rise Building Construction Through Improvement of CYCLONE Modeling Method (CYCLONE 모델링 기법 개선을 통한 초고층 공사의 자재 양중 작업 프로세스 최적화 연구)

  • Hawng, Doowon;Kwon, Okyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.58-70
    • /
    • 2017
  • The planning for material lifting operations is one of the key processes in high-rise building construction. Several previous studies have used rough calculations by referring to existing practices or establishing a target value for lifting cycle time or operating rate. Therefore, the purpose of this study is to propose a material lifting process optimization method for reducing the lifting cycle time and increasing the operating rate. In this study, we improve the cyclic operation network (CYCLONE) modeling method that considers the duration and zone information of each work task. This method can be used to hand over work tasks to another crew group in the work process. According to this methodology, this study optimizes the material lifting process, performs a sensitivity analysis, and evaluates the field applicability of the proposed material lifting process optimization method. Therefore, the optimized process was then applied to a high-rise building construction site. The lifting work process time and operating rate for the simulated as - is lifting process data, optimized process data, and field application result data were compared for each lifting height. From this comparison, the effectiveness of the optimization methodology was confirmed.

Global Online Leadership Strategies for Public and Private Sectors (공공기관 및 수출기업 글로벌 온라인 홍보전략)

  • Jeong, Euiseob;Moon, SunJoo;Kim, Chanho;Yun, Insik;Park, Boyana
    • Journal of Korea Technology Innovation Society
    • /
    • v.16 no.1
    • /
    • pp.1-19
    • /
    • 2013
  • A myriad of information production channels and medium including internet, social media, and multi media channels emerged, often with conflicting interests, disseminate unwanted and inaccurate information which could result in sudden severe public relations damage to the global companies with world class products if not dealt with in the professional way. Properly crafted and managed public relations thus should become the integral part of all organizations. In particular online public relations leadership becomes even more important to public organizations responsible for national branding and interests and to private sectors expanding into the global markets. The research aims to increase global competitiveness of the pubic and exporters by presenting the online leadership strategy 101. For this purpose, locally produced web sites are analysed both from technical and global marketing perspectives. From the research all web sites were classified into three types of ghost, wreck, and moron. The 2012 research showed that 99% was moron, followed by 67% wreck and 1% ghost. The research presents must strategies for global public relations and marketing. They include strategic planning, public relation training, white hat search engine optimization, web standards, web accessibility, mobile web site and the inbound marketing strategies.

  • PDF

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

Optimization of Contaminated Land Investigation based on Different Fitness-for-Purpose Criteria (조사목적별 기준에 부합하는 오염부지 조사방법의 최적화 방안에 관한 연구)

  • Jong-Chun Lee;Michael H. Ramsey
    • Economic and Environmental Geology
    • /
    • v.36 no.3
    • /
    • pp.191-200
    • /
    • 2003
  • Investigations on the contaminated lands due to heavy metals from mining activities or hydrocarbons from oil spillage for example, should be planned based on specific fitness-for-purpose criteria(FFP criteria). A FFP criterion is site specific or varies with situation, based on which not only the data quality but also the decision quality can be determined. The limiting factors on the qualities can be, for example, the total budget for the investigation, regulatory guidance or expert's subjective fitness-for-purpose criterion. This paper deals with planning of investigation methods that can satisfy each suggested FFP criterion based on economic factors and the data quality. To this aim, a probabilistic loss function was applied to derive the cost effective investigation method that balances the measurement uncertainty, which estimates the degree of the data quality, with the decision quality. In addition, investigation planning methods when the objectives of investigations do not lie in the classification of the land but simply in producing the estimation of the mean concentration of the contaminant at the site(e.g. for the use in risk assessment), were also suggested. Furthermore, the efficient allocation of resources between sampling and analysis was also devised. These methods were applied to the two contaminated sites in the UK to test the validity of each method.

A Study on the Optimal Resource Configuration Considering Load Characteristics of Electric Vehicles in Micro Grid Environment (전기자동차 부하 특성을 고려한 마이크로그리드의 최적 전원 구성에 관한 연구)

  • Hwang, Sung-Wook;Chae, Woo-Kyu;Lee, Hak-Ju;Yun, Sang-Yun;Kim, Jung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.228-231
    • /
    • 2015
  • In power system research fields, one of current key issues is the construction and commercialization of micro grid site which is called green island, carbon zero island, energy independent island, building micro grid, etc. and various affiliated technologies have been being vigorously developed to realize. In addition, various researches about electric vehicles (EVs) are in progress and it is expected to penetrate rapidly with the next a few years. Some new load models should be developed integrating with electric vehicle loads because the EVs' deployment could cause the change of load composition rate on power system planning and operations. EVs are also resources for micro grid as well as distributed generation and demand response so that various supply and demand side resources should be considered for micro grid researches. In this paper, the load composition rate of residential sectors is prospected considering the deployment of EVs and the resource configuration of micro grid is optimized based on net present cost. In the optimization, the load patten of case studies includes EV's charging characteristics and various cases are simulated comparing micro grid environment and normal condition. HOMER is used to compare various cases and economic effects.