• 제목/요약/키워드: Single Point Vulnerability(SPV)

검색결과 7건 처리시간 0.026초

신규노형 원전의 발전정지유발기기 선정을 위한 고장모드영향분석 (Failure Mode Effective Analysis for selection of Single Point Vulnerability in New type Nuclear Power Plant)

  • 현진우;염동운
    • 한국압력기기공학회 논문집
    • /
    • 제10권1호
    • /
    • pp.31-36
    • /
    • 2014
  • For decreasing an unexpected shutdown of Nuclear Power Plants, Korea Hydro & Nuclear Power co.(KHNP) has developed Single Point Vulnerability(SPV) of NPPs since 2008. SPV is the equipment that cause reactor shutdown & turbine trip or more than 50% power rundown due to its malfunction. New type Nuclear Power Plants need to develop the SPV list, so performed the SPV selection for about 1 year. To develop this, Failure Mode Effect Analysis(FMEA) methods are used. As results of FMEA analysis, about 700 equipment are selected as SPV. Thereafter those are going to be applied to new type Nuclear Power Plants to enhance equipment reliability.

국내 표준형 원전의 단일 고장 취약성(SPV) 평가 (Evaluation of Single Point Vulnerability on Korean Standard Nuclear Power Plants)

  • 지문구;김명수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.685-686
    • /
    • 2008
  • For the purpose of reducing the plant trip/transient by the failure of a single component during plant operation or maintenance, the list of critical components with Single Point Vulnerability (SPV) on KSNP (Korean Standard Nuclear Power Plant), the standardized methodology of SPV evaluation and the plan to improve reliability of the equipment have been established. In addition, SPV component lists for the other domestic operating Nuclear Power Plants have been made, and the proper procedure for SPV management will be developed.

  • PDF

신규원전의 기기별 고장분석을 통한 발전정지유발기기 선정 (Selection of Single Point Vulnerability through the Failure Mode Effect Analysis of Equipment in Newly built Nuclear Power Plant)

  • 현진우;염동운;송태영
    • 전기학회논문지
    • /
    • 제61권4호
    • /
    • pp.509-512
    • /
    • 2012
  • For decreasing an unexpected shutdown of Nuclear Power Plants, Korea Hydro & Nuclear Power co.(KHNP) has developed Single Point Vulnerability(SPV) of NPPs since 2008. SPV is the equipment that cause reactor shutdown & turbine trip or more than 50% power rundown due to its malfunction. Newly built Nuclear Power Plants need to develop the SPV list, so performed the job which analyse equipment failure effect for SPV selection for 1 year. To develop this, Failure Mode Effect Analysis(FMEA) and Fault Tree Analysis(FTA) methods are used. As results of this analysis, about 900 equipment are selected as SPV. Thereafter those are going to be applied to Nuclear Power Plants to enhance equipment reliability.

원전 기기의 기능적중요도결정 방법론에 대한 연구 (A Study on the Functional Importance Determination Methodology for Components in Nuclear Power Plants)

  • 송태영
    • 한국압력기기공학회 논문집
    • /
    • 제9권1호
    • /
    • pp.1-7
    • /
    • 2013
  • In around 2000, the U.S. NPPs have developed the various advanced engineering processes based on the INPO AP-913(Equipment Reliability Process Description) and showed the high performance in availability. With these benchmarking cases, the Korean NPPs have introduced the advanced engineering technology since 2005. The first step of the advanced engineering is to analyze and determine component importance for all components of a plant. This process is called Functional Importance Determination(FID). These results are basically utilized to determine the priority with limited resources in various areas. However, because the consistency of FID results is insufficient despite applying the same criteria in the existing operating NPPs, the degree of application is low. Therefore, this paper presents the improved methodology for FID interfacing system functions of Maintenance Rule Program and results of Single Point Vulnerability(SPV). This improved methodology is expected to contribute to enhance the reliability of FID data.

표준형 원전 원자로냉각재계통의 발전정지유발기기 분석 (Single Point Vulnerability Analysis of Reactor Coolant System in OPR-1000)

  • 이은찬;배연경;김명수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1999-2000
    • /
    • 2011
  • 본 연구의 목적은 발전소의 정상적인 출력운전을 위해 필요한 주요 계통의 기능에 영향을 미쳐 발전소 불시정지를 유발할 수 있는 핵심 기기, 즉, 발전정지유발기기의 설치 개소를 체계적인 방법을 통하여 정밀 분석하고, 해당 기기의 고장모드와 그 영향을 검토하여 이를 방지하기 위한 대책을 수립하도록 하는 것이다. 발전정지유발기기의 평가는 발전소 종사자로 하여금 가동 중 발전소에서 발생 가능한 발전정지 영향기기와 그들의 상호관계를 이해하고, 정량적 평가를 통해 해당기기들의 발전소 발전정지 영향을 시각적으로 확인하여 불시 발전정지를 예방할 수 있는 대응 논리를 인지할 수 있도록 하는데 그 목적이 있다. 원자로냉각재계통에 대한 발전정지유발기기(SPV, Single Point Vulnerability)를 분석하기 위해 고장모드영향분석(FMEA, Failure Mode Effect Analysis)을 수행하고 상세 고장수목을 개발하여 통합단위의 계통 분석을 수행하였다. 분석결과 원자로냉각재계통의 발전정지유발기기는 원자로냉각재 펌프와 가압기 주살수 밸브의 제어회로에 집중되어 있는 것으로 나타났다.

  • PDF

APR1400 급수공급계통 엔지니어링 프로그램 개발 (Development of Engineering Program for APR1400 Feedwater Supplying System)

  • 염동운;주태영;현진우
    • 에너지공학
    • /
    • 제26권2호
    • /
    • pp.12-22
    • /
    • 2017
  • 국내 가동원전은 안전성 및 설비 신뢰도 제고를 위해 엔지니어링 프로그램들을 이행하고 있다. 엔지니어링 프로그램에는 설비의 정비효과를 감시하는 정비규정(MR), 예방정비 프로그램 개발 및 설비관리 우선순위 결정을 위한 기능적중요도결정(FID), 발전설비 불시정지 최소화를 위한 발전정지유발기기(SPV) 및 효율적 작업관리를 위한 기능적설비그룹(FEG) 등이 있다. 최근에 건설 중인 APR1400형 원전도 운영초기 단계부터 엔지니어링 체계 정착을 위해 고유 설계특성을 반영하여 급수공급계통의 엔지니어링 프로그램들을 개발하였으며, 향후 운영단계에서 프로그램 이행을 통해 각 프로그램의 적합성을 검증할 예정이다. 결과적으로 신규원전 고유 설계특성을 반영하여 개발한 엔지니어링 프로그램 이행을 통해 APR1400 급수공급계통의 신뢰성이 향상될 것으로 기대된다.

원자력발전소에서 리스크를 고려한 작업관리 방법 (A Study on the Work Management Method Considering Risks in Nuclear Power Plants)

  • 송태영
    • 한국압력기기공학회 논문집
    • /
    • 제10권1호
    • /
    • pp.37-43
    • /
    • 2014
  • Nuclear power plants(NPPs) are consisted of power production functions and safety functions preventing leakage of radiation. Operators working in NPPs shall maintain these functions during an operation period through various activities such as improvement & modification, corrective maintenance, preventive maintenance and surveillance test. According to the performance of these work activities, there are configuration changes in NPPs systems. Its changes cause the increase of safety risks(CDF) and plant trip risks. Recently, the importance of risk management is increasing gradually in the operation process of NPPs. Therefore, this paper presents the work management methods using the various risk monitoring systems during power operation and overhaul period. Also this paper suggests the optimum application ways of risk systems for work management.