• Title/Summary/Keyword: Sihwa tidal power plant

Search Result 26, Processing Time 0.027 seconds

A Study on Power System Characteristics and Economic Benefit by Operating the New SIHWA Tidal Power Plant (시화호 조력발전소 신설에 따른 전력계통 특성 및 경제적 이득 분석)

  • Kim, Kyu-Ho;Song, Kyung-Bin;Kim, Sang-Min;Lee, Mu-Sung;Choi, Hong-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.6
    • /
    • pp.791-796
    • /
    • 2012
  • This paper presents the various analysis of the power system for operating the new SIHWA tidal power plant. In the analysis of the power system, summer load condition of 2011 is used. Especially, power flow, fault current, voltage and contingency of SIHWA tidal power plant area are analyzed by using PSS/E and there is no problem for the dynamic stability simulation. The new SIHWA tidal power plant is located in near metropolitan area where about 43% amount of the system load is consumed. Therefore, transmission losses are reduced. In addition, system marginal price can be lowered by generating the new SIHWA tidal power plant. The generation pattern of the SIHWA tidal plant is analyzed and the changes of generation are presented for various water levels by control of the rotor angle alpha and beta in water wheel generator.

A Study on Power System Characteristics by Installing SIHWA Tidal Power Plant (시화호 조력발전소 운전에 따른 전력계통 특성 분석에 관한 연구)

  • Kim, Kyu-Ho;Song, Kyung-Bin;Kim, Sang-Min;Choi, Hong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.254-255
    • /
    • 2011
  • This paper presents a method to analysis the effect for integrating Sihwa tidal power into power systems. Especially, power flow, fault current, voltage and contingency of sihwa tidal power plant area are calculated and the generation characteristics of tidal machine are analyzed.

  • PDF

Effect of Intake Vortex Occurrence on the Performance of an Axial Hydraulic Turbine in Sihwa-Lake Tidal Power Plant, Korea

  • Kim, Jin-Hyuk;Heo, Man-Woong;Cha, Kyung-Hun;Kim, Kwang-Yong;Tac, Se-Wyan;Cho, Yong;Hwang, Jae-Chun;Collins, Maria
    • International Journal of Fluid Machinery and Systems
    • /
    • v.5 no.4
    • /
    • pp.174-179
    • /
    • 2012
  • A numerical study to investigate the effect of intake vortex occurrence on the performance of an axial hydraulic turbine for generating tidal power energy in Sihwa-lake tidal power plant, Korea, is performed. Numerical analysis of the flow through an sxial hydraulic turbine is carried out by solving three-dimensional Reynolds-averaged Navier-Stokes dquations with the shear stress transport turbulence model. In the real turbine operation, the vortex flows are occurred in both the side corners around the intake of an axial hydraulic turbine due to the interaction between the inflow angle of water and intake structure. To analyze these vortex phenomena and to evaluate their impacts on the turbine performance, the internal flow fields of the axial hydraulic turbines with the different inflow angles are compared with their performances. As the results of numerical analysis, the vortex flows do not directly affect the turbine performance.

Dynamic Characteristic Analysis of Water-Turbine Generator Control System of Sihwa Tidal Power Plant (시화조력발전소 수차발전기 제어시스템의 동적 특성 해석)

  • Ahn, Sang-Ji;Ban, Yu-Hyeon;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.61 no.4
    • /
    • pp.180-185
    • /
    • 2012
  • Tidal power is one of new and renewable energy sources. The seawater is stored inside a tidal embankment built at the mouth of a river or bay, where tides ebb and flow. The water turbine-generators produce power by exploiting the gap in the water level between the water outside and inside the embankment. Tidal power plant is a large plant that is installed on the sea. And then, the facility's operations and a separate control system for monitoring and maintenance is required. However, this plant predictive control of building systems and technologies have been avoided the transfer of technology from advanced global companies. Accordingly, the control system for core technology development and localization is urgently needed. This paper presents modeling and simulation using by PSS/E about generator, governor, exciter, and power system stabilizer for control system in Sihwa tidal power plant to improve the efficiency and develope of core technology. And the dynamic characteristics of governor and exciter were analyzed.

Changes in the Macrobenthic Community in Sihwa Tidal Flat After Operation of the Tidal Power Plant (조력발전소 가동 후 시화갯벌의 대형저서동물군집 변화)

  • Kim, Minkyu;Koo, Bon Joo
    • Ocean and Polar Research
    • /
    • v.38 no.4
    • /
    • pp.315-324
    • /
    • 2016
  • In this study, we investigated changes in the macrobenthic community in Sihwa tidal flat before and after the operation of a Tidal Power Plant (TPP). In order to investigate changes in the macrobenthic community structure, field surveys were conducted at eighteen stations in 4 transect lines every September from 2011 to 2015. Mean density of macrobenthos decreased to $116ind./m^2$ in 2015 from $1,602ind./m^2$ in 2011. While the mean density of macrobenthos has decreased, species richness and biomass have gradually increased. The species diversity and SEP (Shannon-wiener Evenness Proportion) have also gradually increased over time since the operation of the TPP. The macrobenthic community in Sihwa tidal flat was divided into 4 groups on a yearly base. Before the operation of TPP, opportunistic species such as Neanthes succina and Polydora cornuta largely contributed to the structure of the macrobenthic community, while equilibrium species such as Periserrula leucophryna and Scopimera globosa contributed after the operation. With the operation of TPP, the macrobenthic community has rapidly recovered and this might be related to improvement in the quality of water and sedimentary environments as a result of an increase in water mass volume exchanged through the TPP gate.

The Intertidal Area in Lake Sihwa After Operation of the Tidal Power Plant (조력발전소 가동 후 시화호 내 조간대의 면적 변화)

  • Kim, Minkyu;Koo, Bon Joo
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.18 no.4
    • /
    • pp.310-316
    • /
    • 2015
  • The intertidal area in Lake Sihwa formed after operation of Sihwa-Lake tidal power plant and the change of the area in Lake Sihwa by period were analyzed. For computation of the intertidal area, remote sensing techniques were applied and high resolution Digital Elevation Model (DEM) was generated with root mean square (rms) error 14.4 cm. The intertidal area was $165.1km^2$ in 1910s, $115.2km^2$ in 1991 before completion of Sihwa dyke, $5.6km^2$ in 2010 during the period on operation of sluice gate, and $20.3km^2$ in 2013 after operation of Sihwa tidal power plant. Intertidal in Lake Sihwa was nearly dissipated after completion of Sihwa dyke, but significantly increased with operation of Sihwa tidal power plant from April 2012 as developing a regular tide environment and increasing of sea water flux. The re-formation of tidal flat of Sihwa Lake is an uncommon case. This study that precisely analyzed on the area of artificially formed Sihwa tidal flat would be applicable for management and making conservation plan.

Development of Start·Stop Control System at Water Turbine Generator for Tidal Power Plant (조력발전소를 위한 수차발전기의 기동·정지 제어시스템 개발)

  • Cho, Byong-Og;Park, Chul-Won
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.106-112
    • /
    • 2014
  • Recently, tidal power generation has gained much attention. South Korea's tidal power generation systems were imported from abroad by turnkey type and have being operated. Therefore, for efficient operation and technological independence of a tidal power system, development of core technology is required. This paper deals with the start stop control system of water turbine generator in the tidal power plant, as one of our development project results. Using the SCADA system, the status and operations of water turbine generator in the tidal power plant, as well as simulation for calculation of maximum power were carried out. A small model type of start stop control device was also developed. In addition, the control system in Sihwa tidal power plant was modeled, and the results obtained by the dynamic simulation were given in graphics by 2D simulator.

Analysis of Operating Characteristics in Tidal Power Generation According to Tide Level

  • Hong, Jeong-Jo;Oh, Young-sun
    • International Journal of Contents
    • /
    • v.18 no.1
    • /
    • pp.76-84
    • /
    • 2022
  • Tidal power generation plays a critical role in reducing greenhouse gas emissions. It uses a tidal force generated by gravitational force between the moon, the earth, and the sun. The change of seawater height generates the tide-generating force, and the magnitude of the change is the tide level. The tide level change has the same period as the tide-generating force twice a day, every 29.5 days, every year, and every 18.6 years. Sihwa Lake Tidal Power Station is Korea's first tidal power plant that began commercial power generation in August 2011 and has been accumulating a large volume of data on electricity production, power generation sales, sluice displacement, and tide levels. The purpose of this paper was to analyze the impact of the inefficiency factors affecting production and the tidal level change on tidal power generation and their characteristics using Sihwa Lake Tidal Power's operational performance data. Throughout this paper we show that tidal power generating operation is accurately predicting the trends of magnitude of tidal force to be periodical for each day. determining the drop to initiate the water turbine generator factoring the constraints on the operation of Sihwa Lake, and reflecting the water discharge through the floodgate and water turbine during the standby mode in the power generation plan to be in the optimal condition until the initiation of the next power generation can maximize power generation.

Prototype Hardware Design and Optimal Algorithm of PC Based Start·Stop Control System for Tidal Generation (조력용 PC 기반 기동·정지 제어시스템의 최적화 알고리즘과 시제품 하드웨어 설계)

  • Kim, Yoon-Sang;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.89-94
    • /
    • 2014
  • Tidal generation has become one of environmentally friendly new and renewable future sources of energy. The Sihwa Tidal Power Plant in South Korea, which was imported from abroad by turnkey type in 2011, connected to the power system in 2012, and is currently under commercial operation. However, leading companies are reluctant to disclose their technologies associated with the control systems and are not cooperative in technology transfers, making it a high priority to develop core technologies in South Korea. In order to develop a start stop control system for tidal generation, this paper presents the optimal algorithm for decision making and prototype of hardware design. First, control systems in tidal power, such as plant operation control, data interfaces between systems, monitoring and control points of the control system, are analyzed. The software development and PC based emulator processes for optimization algorithm processing are described. Finally, verification of the algorithm implementation, hardware platform for start stop control device, and implementation of prototype control system were discussed.

A Study on Start·Stop System at Water Turbine-Generator for Tidal Power Plant (조력발전용 수차발전기의 기동·정지시스템에 관한 연구)

  • Oh, Min-Hwan;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.113-118
    • /
    • 2014
  • Tidal power is one of new and renewable energy sources. Tidal power is generated by using the gap in the water level between the water outside and inside the embankment. All tidal power plant in Korea were being operated by import of turn-key from abroad. The know-how and technology which are the most important to build predictive control system has become increasingly difficult to obtain from advanced countries because most of them avoid to transfer, which the domestic development of the control system is needed. In this paper, a study on start stop system at water turbine-generator for tidal power plant at the beginning of development was presented. For improvement the efficiency and develope of core technology of the start stop system, the technique and characteristics of tidal power, modeling, maximum generation calculation method, and optimal control of joint control system in Sihwa tidal power plant were studied.