Browse > Article
http://dx.doi.org/10.5370/KIEE.2012.61.6.791

A Study on Power System Characteristics and Economic Benefit by Operating the New SIHWA Tidal Power Plant  

Kim, Kyu-Ho (한경대 전기공학과, IT융합연구소)
Song, Kyung-Bin (숭실대 전기공학부)
Kim, Sang-Min (전력거래소)
Lee, Mu-Sung (전력거래소)
Choi, Hong-Seok (전력거래소)
Publication Information
The Transactions of The Korean Institute of Electrical Engineers / v.61, no.6, 2012 , pp. 791-796 More about this Journal
Abstract
This paper presents the various analysis of the power system for operating the new SIHWA tidal power plant. In the analysis of the power system, summer load condition of 2011 is used. Especially, power flow, fault current, voltage and contingency of SIHWA tidal power plant area are analyzed by using PSS/E and there is no problem for the dynamic stability simulation. The new SIHWA tidal power plant is located in near metropolitan area where about 43% amount of the system load is consumed. Therefore, transmission losses are reduced. In addition, system marginal price can be lowered by generating the new SIHWA tidal power plant. The generation pattern of the SIHWA tidal plant is analyzed and the changes of generation are presented for various water levels by control of the rotor angle alpha and beta in water wheel generator.
Keywords
Power system analysis; Tidal power plant; Transient stability; Economic benefit;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 산업자원부, "제2차 신․재생에너지 기술개발 및 이용․보급 기본계획(2003-2012)", 2003년 12월
2 수자원공사, 2002, "시화호 조력발전 건설사업 타당성조사 및 기본계획 보고서"
3 한국전력거래소, "신재생에너지 전원 접속에 따른 계통 영향 분석 및 운영방안 연구", 최종보고서, 2006년 10월
4 한국해양연구원, "조력발전 기술 현황 분석", 1993
5 한국전기연구원, "분산형 전원을 고려한 중장기 전력수급계획 수립방안 연구", 2005년 8월
6 김규호, 송경빈, "시화조력발전 연계에 의한 남시화 계통의 최적 운영 방안", 조명전기설비학회 논문지, 제23권 5호, pp.120-126, 2009년 5월   과학기술학회마을   DOI   ScienceOn
7 김규호, 송경빈, 김상민, 최홍석, "시화호 조력발전소 운전에 따른 전력계통 특성 분석에 관한 연구", 대한전기 학회 하계학술대회 논문집, 2011년   과학기술학회마을
8 한국전력거래소, "전력시장운영규칙", 2011년 12월