This paper presents a register scheduling and allocation algorithm for high level synthesis. The proposed algorithm executes the low power scheduling to reduce the switching activity using shut down technique which was not unnecessary the calculation through the extraction DFG from VHDL description. Also, the register allocation algorithm determines the minimum register after the life time analysis of all variable. It is minimum the switching activity using graph coloring technique for low power consumption. The proposed algorithm proves the effect through various filter benchmark to adopt a new scheduling and allocation algorithm considering the low power.
Proceedings of the Korea Institute of Fire Science and Engineering Conference
/
한국화재소방학회 2003년도 춘계학술논문발표회논문집
/
pp.259-264
/
2003
The fire protection system of Nuclear Power Plants(NPPs) is an integrated system that is applied multi-field technology. So, it needs synthetic design and analysis, that is, the plan of fire protection, fire compartment, fire detection, fire suppression, and success of safety shut down, etc. In case of a fire in NPPs, secure the safety of reactor and minimize the radioactivity contamination. For this purpose, perform the fire risk analysis and make up the deducted problem through the improvement of design or the change of operation process.
The purpose of this study is to propose an effective operating method of a power generator used by the Emergency Power System in case of a simultaneous fire and of the limitations of the interlock system the power supply from the emergency power generator. On the Emergency Power System with Reserved Fire-fighting Power (RFP), in case of an overload, the collective control Emergency Power System signals the main circuit breaker to shut off the supply to the emergency load, leaving the supply to the firefighting load uninterrupted to the end. The sequential control Emergency Power System signals the firefighting power supply to shut off the fire stage of the emergency load and continues to monitor the power supply. If an overload happens again from increased firefighting load, the sequential control Emergency Power System sends a secondary signal to shut down the second stage of the emergency load.
Journal of the Korean Society for Precision Engineering
/
제15권9호
/
pp.25-32
/
1998
The forced cooling system is designed to shorten the overhaul time of steam turbine, which is important in view of economic concern of utility companies, Forced cooling of the hot turbine is achieved by suction of air flow into the turbine after the turbine shuts down. The heat transfer process by suction of air flow can cause thermal stress due to the thermal gradients. In this paper, the analysis of heat transfer is performed to calculate the air flow rate. Based on the prediction of cyclic fatigue damage and the experience, the cooling equipment is designed for shortening the cooling time of steam turbine.
The Journal of Korean Institute of Communications and Information Sciences
/
제39C권10호
/
pp.930-936
/
2014
Smart Multiple-Tap to be introduced in this paper, is an electronic device that controls the Multibple-Tap through the Smartphone. It runs on network and has an inbuilt Zigbee communication module. Thus, users can control home devices from remote through home server. Mentioned home server is operated as a gateway and is connected with smart devices on the Internet. To sum up, Users using this Smart Multiple-Tap can check the state information of the multi-tap ON/OFF and can control immediately by smartphone. also, Smart Multiple-Tap perfectly shut down the standby power. when users turn off each of the Smart Multiple-Tap's circle, It drives automatically lowest electricity-consuming mode and shut down the standby power by its own built-in SSR module. therefore, it will bring the energy saving effect on environment using Smart Multiple-Tap.
Journal of the Korean Society of Propulsion Engineers
/
제14권6호
/
pp.38-44
/
2010
The shock wave and boundary layer interaction patterns in an over-expanded rocket nozzle are associated with the production of undesirable side-forces during the start-up and shut-down processes of the engine. In the present work, a computational study is carried out to investigate the effect of the transient nozzle pressure ratio (NPR) on the flow fields inside the nozzle. The unsteady, compressible, axisymmetric, Navier-Stocks equations with SST k-${\omega}$ turbulence model are solved using a fully implicit finite volume scheme. NPR is varied from 2.0 to 10.0, in order to simulate the start-up and shut-down processes of the rocket engine. It is observed that the interaction patterns and the hysteresis phenomenon strongly depend on the time variation of NPR, leading to significantly different characteristics in the lateral forces.
Probability of technology risk is expected to increase as the post catch-up innovation, characterized by high uncertainty and high risk, would dominate in the coming era of post catchup. Social controversy on online game as a post catch-up innovation is still ongoing, though the shutdown law was enacted by the government. Socio-technical vulnerability causing technology risk paradoxically arose from the world top-level ICT infrastructures and has been reinforced by developmentalism. While both the pros and cons of the regulation fail to recognize dilemma objectively, social cost is brought about and accumulated. With recognizing dilemma between technology innovation and risks, we can tackle technology risks and ensure responsible innovation in post catch-up era.
Journal of the Korean Institute of Telematics and Electronics
/
제10권4호
/
pp.60-73
/
1973
The reactor noise analysis was performed by the cross correlation method using two detectors to determine the dynamic stability and the system parameter of TRIGA Mark-II reactor under critical and subcritical conditions. The a values turned out to be 46.67 and 70.04 respectively at zero power and full power under critical condition, while 79.47 and 97.59 respectively at the safety rod dropping and the regulating rod dropping under subcritical condition. Prompt neutron life time of TRIGA Mark-II reactor measured 107 and 160 $\mu$sec, and shut down margin was -10.03$\times$10-4 at the safety rod dropping and -29-43$\times$10-4 at the regulating rod dropping CDC 3100/MSOS digital computer, HITACHI 505 Analog computer, and preamplifier, bandpass filter, FM modulator or demodulator designed for this specific purpose, were employed for the present investigation.
Most of Korean feed mill has a pregrind system which was suitable for the processing of less number of ingredients and finished products, and good for the mash type feed product. But industries has been changed in production volume and cost, and also from mash to further processed products such as pelleted and extruded. Therefore, Korea feed industries now should change the process, especially the grinding system from the current pregrind to other grind system, but this change will cost a lot of investment and also loosing current grinding system, and should have production shut down during the construction period. To solve these problems, combined grinding system based on a new model mill has been developed. The combined grind system is combination of pregrind and postgrind system, which has the advantages of those two grind systems, and also which can allow to utilize existing pregrind system continuously without any production interruption due to new postgrind system construction. This newly developed model has been applied to the feed mill expansion project of `B`feed company in 1994, and it was very successful application and showed excellent results as we intended. The new model mill, combined grind system applied can save fixed asset investment because old pregrind system can be used as is, and also can reduce production cost and improve product quality. And the possibility of critical production shut down can be much lowered. Within this new grinding model development, multi-screen combination system has been developed for the better grinding texture quality and safer operation. This new model mill with combined grind system will be applied by most feed manufacturing plant and may enhance their production competitiveness, and the further study and development should be continued.
The separator made from the blends of high density polyethylene (HDPE) and ultrahigh molecular weight polyethylene (UHMWPE) was prepared by wet processing to use as Li-ion secondary battery. We investigated effects of the blending of the polymers and the film extension on the mechanical properties of the separator. The mechanical strength of separator increased with increasing molecular weights and contents of UHMWPE, for instance about $1000 kg/\textrm{cm}^2$ with the five times extended film of 6 wt% UHMWPE. The pores of the separator were very uniform with the size of 0.1~$0.12\mu\textrm{m}$. The shut-down characteristic quickly increased at around $130^{\circ}C$ and the fusion temperature was $160^{\circ}C$, so it could be applied to the lithium ion secondary battery.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.