• 제목/요약/키워드: Shut-down

검색결과 278건 처리시간 0.026초

LPATS에 의한 7년간의 한반도 뇌격특성분석 (Analysis of the lightning characteristics by LPATS Data during 7 year)

  • 우정욱;심응보;곽주식;권동진;문재덕;한상옥
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.509-511
    • /
    • 2003
  • Because the overhead transmission lines are exposed to the outdoor weather, the faults of the transmission lines are due to natural conditions, and among these faults, the outage rate by lightning is about 50%. The lightning causes the damage of power system equipments, the shut down of electricity and the electro-magnetic interference. Therefore, the pertinent insulation design is important, not only to decrease the damage of the facility itself but also to increase the reliability of electric power system. For these reasons, we have to obtain and accumulate the lightning current parameters for the basic lightning research. This paper describes the statistical distribution of lightning current parameters and the IKL map.

  • PDF

차세대원전 안전등급모선의 전원공급 다중성 연구 (Study on the Diversity of Power supply to Safety related Bus in Korean Next Gener)

  • 윤정현;지문구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1170-1172
    • /
    • 1998
  • The electrical power of nuclear power plant consists of Safety related power systems and Non-Safety related power systems. The safety related power systems are designed to have sufficient capacity to safely shut down the unit and to mitigate the effects of an accident assuming loss of off-site power. This paper presents the operation scheme of the safety related power system for several plant conditions in Korean Next Generation Reactor and reviews the diversity of power supply to the safety related bus.

  • PDF

볼밸브를 사용한 송수펌프장에서의 수격현상 (Waterhammer in Transmission Pumping Station with Ball Valve)

  • 김경엽;김점배
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 춘계학술대회
    • /
    • pp.1697-1702
    • /
    • 2004
  • The waterhammer has recently become more important because the pumping stations were big and the systems conveying the fluid through the large and long transmission pipelines were complex. When the pumps are started or stopped for the operation or tripped due to the power failure. the hydraulic transients occur as a result of the sudden change in velocity. In this paper, the field tests on the waterhammer by the startup, stoppage, and power failure of a centrifugal pump were carried out for Yongma transmission pumping station in Seoul. The experimental results were compared with that of the numerical calculations. in which results the procedure of controlled pump normal shut-down and the two-step closing mode of controlling the ball valve for pump emergency stop are proposed to reduce the pressure surge.

  • PDF

가스터빈 내부 냉각계통 발화에 의한 고온부품 손상의 현상학적 고찰 (A Phenomenological Review on the Damage of Hot Gas Parts caused by Explosion of Gas Turbine Cooling System)

  • 유원주;이승현
    • 대한안전경영과학회지
    • /
    • 제12권2호
    • /
    • pp.75-82
    • /
    • 2010
  • Gas turbines for power generating operate in a very high temperature condition and use natural gas for fuel. For this reason, many cases of damage happen at hot gas parts which are severely affected by high temperature gas and many cases of explosion occur by fuel gas. So a lot of efforts should be made to prevent hot gas parts damage and gas explosion accidents. Though there are many damage cases and explosion accidents, it is very difficult to find out the root causes of hot gas parts damage caused by gas explosion due to gas leakage in the heat exchanger for air cooling and gas heating. To prevent gas turbine from damage caused by gas explosion, removal of leakage gas from gas turbine is inevitably required before firing the gas turbine and installing alarm systems is also required for detecting gas leakage at stop valve to turbine while shut down.

액체로켓엔진 시스템 Lay-out 설계 개념 연구 (Study of Lay-out Design Concept for Liquid Rocket Engine System)

  • 정용현;이은석
    • 항공우주시스템공학회지
    • /
    • 제1권4호
    • /
    • pp.42-45
    • /
    • 2007
  • The process of Lay-out design and assembly for liquid rocket engine was presented and the Lay-out design for main components of liquid Rocket engine system was studied. Vertical direction is recommended in the case of turbopump's arrangement. If the length of pipe between gas-generator with turbopump's turbine is shorter, gas-generator is stable. The arrangements of main valves are recommended as near disposition to combustion chamber, because shut-down process time is shorter. Interference with launch vehicle and structural strength considering gimbal actuator's force and control performance is considered in the case of gimbal actuator's supporter design.

  • PDF

전자기력에 의해 유도된 변압기의 진동 해석을 위한 자왜 현상 모델링 (Magnetostriction Modeling for the Analysis of Electromagnetically Induced Vibration of Transformers)

  • 유승열;이준신;이욱륜;노명규
    • 한국정밀공학회지
    • /
    • 제25권1호
    • /
    • pp.108-114
    • /
    • 2008
  • Recently, there have been several instances that the nuclear power plants were shut down due to the mechanical faults in the main transformer of the plants. These mechanical faults are primarily originated from the electromagnetically induced mechanical vibrations. Magnetostriction is identified to be the main cause of the mechanical vibration after analyzing the vibration data of the main transformers in nuclear power plants. In this study, we derived a mathematical model of the magnetostriction based on the Jiles-Atherton hysteresis model. The validity of the model is checked by matching the simulations with the experimental observations. The magnetostriction model used in this study will be the first step toward developing a design tool far the transformers that have minimal mechanical vibrations and are robust to mechanical faults.

최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구 (A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권4호
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구 (A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권5호
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF

FDM을 이용한 층유유동장내에서 오염물질확산에 관한 연구 (Numerical Prediction of Contaminant Dispersion within the Laminar Flow Field using FDM)

  • 김양술
    • 한국안전학회지
    • /
    • 제10권2호
    • /
    • pp.56-63
    • /
    • 1995
  • A simulation of contaminant dispersion in a water reservoir has been done using 2-D finite difference method(FDM). The steady state velocity field of the reservoir was computed using stream function-vorticity formulation of Wavier-Stokes equation and continuity equation. Based on the computed steady state velocity field, the transient convective diffusion equation of the contaminant dispersion was computed. For the 1m$\times$1m reservoir model with inlet and outlet attached, it was shown that the center of circulation located toward right. For the numerical values of v =0.01($\textrm{cm}^2$/s) and D=0.6($\textrm{cm}^2$/s) and the flow of 50($\textrm{cm}^3$/s ), it was determined that the outflow had to be shut down in 18 seconds to prevent from severe pollution. Also the required time was computed to be 6 seconds for the inflow of 100 ($\textrm{cm}^3$/s). The result of this study is considered, hopefully, to be useful for the design of the water reservoir systems that are the subjects to various contamination.

  • PDF

수력발전기 고정자 권선에서 부분방전 특성 (Partial Discharge Property of Hydrogenerator Stator Windings)

  • 김희동
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2000년도 춘계학술대회 논문집 유기절연재료 방전 플라즈마
    • /
    • pp.86-90
    • /
    • 2000
  • Partial discharge(PD) tests were performed when the hydrogenerator(rated 11kV and 25MVA) was shut down(off-line). Six cable couplers were installed in the ring bus as well as within hydrogenerator terminal box. PD tests were conducted using partial discharge analyzer(PDA) and digital partial discharge detector(PDD). PDA showed that the normalized quantity number(NQN) and the partial discharge magnitude increased with increase of ac voltage. Slot discharges were discovered in three phases(A, B and C) at the rated voltage. PDA and PDD test results are in accordance with the pattern and magnitude of partial discharge. This hydrogenerator stator windings were in good condition.

  • PDF