• Title/Summary/Keyword: Shotcrete

Search Result 401, Processing Time 0.027 seconds

Long-term strength of shotcrete with improved C12A7 based mineral accelerator (개량형 C12A7계 광물계 급결제를 사용한 숏크리트의 장기강도 평가)

  • Won, Jong-Pil;Hwang, Un-Jong;Lee, Su-Jin;Lee, Jae-Ho;Jang, Seok-Bu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.135-148
    • /
    • 2014
  • This study was performed to evaluate the performance about Improved C12A7 based mineral accelerator (ICM) increased in initial and long-term strength. ICM was developed to overcome the long-term strength decrease in existing accelerator. To evaluate the performance of ICM according to addition rate, setting time, compressive strength, and flexural strength tests were conducted in laboratory. In results, initial setting time was slower, final setting time was faster than existing $C_{12}A_7$ based mineral accelerator (CM) when usage of ICM 6%. In compressive and flexural strength, existing CM was higher than ICM at 3hours and 1day. After 7days, strength of shotcrete using ICM was increased. Rebound test, compressive strength and flexural strength test with optimum addition rate through the laboratory test were conducted in field. Field experiment results were the same as laboratory test. Long-term strength performance of ICM was superior to existing accelerator.

A Study on Properties of High Blaine Cement for Shotcrete (숏크리트용 고분말도 시멘트의 특성)

  • Kim, Jae-Young;Kim, Teuk-Jun;Lee, Min-Suk;Ryoo, Dong-Woo
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.5
    • /
    • pp.633-640
    • /
    • 2010
  • This study was performed to get basic information about properties of high blaine cement for shotcrete use. Particle size distribution, setting time and compressive strength test, analysis like as SEM, DSC thermal analysis, XRD was carried out to investigate principle properties of high blaine cement. Setting time of high blaine cement was shorter and compressive strength was higher than those of ordinary portland cement (OPC). Results of analysis showed early hydration products of high blaine cement is smaller and spread widely due to increased specific surface. From the SEM observation and analysis of DSC and XRD results, it was seen that the aluminates accelerators promoted calcium aluminium hydrates while the alkali free accelerators increased ettringite and monosulfates formation. Strength and setting time measurement of cement paste with aluminate accelerator is more effective than the alkali free accelerator in reducing the setting time and increasing early strength while alkali free accelerator is more effective in increasing the strength after 7 days.

Stability Analysis and Reliability Evaluation of the Pretensioned Soil Nailing System (프리텐션 쏘일네일링 시스템의 안정해석 및 신뢰도 분석)

  • 김홍택;강인규;박사원;고용일;권영호
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.2
    • /
    • pp.105-127
    • /
    • 1999
  • Application of the soil nailing method is continuously extended in maintaining stable excavations and slopes. Occasionally, however, ground anchor support system may not be used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then, could play important roles in reducing deformations mainly in an upper part of the nailed-soil excavation system as well as improving local stability. In the present study, the analytical procedure and design technique are proposed to evaluate maximum pretension force and stability of the pretensioned soil nailing system. Also proposed are techniques to determine the required thickness of a shotcrete facing and to estimate probability of a failure against the punching shear. The predicted results are compared with the limited measurements obtained from the excavation site constructed by using the pretensioned soil nails. Based on the proposed procedure and technique, effects of the radius of a influence circle and dilatancy angle on the thickness of a shotcrete facing, bonded length and safety factors are analyzed. In addition, effects of the reduction of deformations expected by pretensioning of the soil nails are examined in detail throughout an illustrative example and FLAC$^{2D}$ program analysis.s.

  • PDF

Modeling the Effect of Water, Excavation Sequence and Reinforcement on the Response of Tunnels

  • Kim, Yong-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.3
    • /
    • pp.161-176
    • /
    • 1999
  • A powerful numerical method that can be used for modeling rock-structure interaction is the Discontinuous Deformation Analysis (D D A) method developed by Shi in 1988. In this method, rock masses are treated as systems of finite and deformable blocks. Large rock mass deformations and block movements are allowed. Although various extensions of the D D A method have been proposed in the literature, the method is not capable of modeling water-block interaction, sequential loading or unloading and rock reinforcement; three features that are needed when modeling surface or underground excavation in fractured rock. This paper presents three new extensions to the D D A method. The extensions consist of hydro-mechanical coupling between rock blocks and steady water flow in fractures, sequential loading or unloading, and rock reinforcement by rockbolts, shotcrete or concrete lining. Examples of application of the D D A method with the new extensions are presented. Simulations of the underground excavation of the \ulcornerUnju Tunnel\ulcorner in Korea were carried out to evaluate the influence of fracture flow, excavation sequence and reinforcement on the tunnel stability. The results of the present study indicate that fracture flow and improper selection of excavation sequence could have a destabilizing effect on the tunnel stability. On the other hand, reinforcement by rockbolts and shotcrete can stabilize the tunnel. It is found that, in general, the D D A program with the three new extensions can now be used as a practical tool in the design of underground structures. In particular, phases of construction (excavation, reinforcement) can now be simulated more realistically.

  • PDF

A study on the structural behaviour of shotcrete and concrete lining by experimental and numerical analyses (숏크리트 및 콘크리트 라이닝의 역학적 거동에 관한 실험 및 수치해석적 연구)

  • 김재순;김영근
    • Tunnel and Underground Space
    • /
    • v.8 no.4
    • /
    • pp.307-320
    • /
    • 1998
  • Tunnel lining is the final support of a tunnel and reflects the results of the interaction between ground and support system. Recently it is very difficult to support and manage the tunnel because the cracks on tunnel lining cause many problems in supporting and managing tunnels. Therefore the analysis of the cracks is quite strongly required. In this study, mechanical behaviour of a tunnel lining was examined by model tests and by numerical analyses. Especially the model test was examined for double linings including shotcrete and concrete lining. The model tests were carried out under various conditions taking different loading shapes, horizontal stresses, thicknesses of linings and double lining, vault opening behind the concrete lining and rock-like medium surrounding the lining. Due to horizontal stress, compressive stress prevailed on the lining. Thus the bearing capacity of the lining increased. The existence of a vault opening behind the concrete lining reduced the bearing capacity by the similar amount of reduction of concrete lining thickness. Rock-like medium cast around the side wall of the lining restrained the deflection of the lining, and the bearing capacity for cracking and failure increased vary much. In numerical analyses a algorithm which can analysis the double lining by introduction of interface element was developed. And the results of the numerical analyses were compared with the results of the model tests.

  • PDF

Study on Structural Stability Analysis of Excavation Stage Considering Excavation Process and Supporting Materials in Room-and-Pillar Underground Space (격자형 지하공간에서 굴착 공정과 지보재를 고려한 굴착 단계별 구조 안정성 해석 연구)

  • Soon-Wook, Choi;Soo-Ho, Chang;Tae-Ho, Kang;Chulho, Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2022
  • The room-and-pillar method or grid-type underground space is a method of forming a space by excavating the excavation part at regular intervals so that it is orthogonal and using natural rock mass as a structure. Such excavation may appear different in size from the excavation stage where the maximum displacement occurs depending on the excavation direction and sequence. In this study, considering the installation of support materials such as shotcrete and rock bolts for the optimal design of the excavation process, the safety and constructability of the design and construction of the grid-type underground space under specific ground conditions were analytically reviewed. The ground conditions were set using an numerical method, and the stress at pillar and displacement at center of room were considered for each excavation stage and construction type under a constant surcharge. The height of the space was 8m, which was set higher than the size of a general office, and was reviewed in consideration of equipment and plant facilities. In addition, the degree of displacement control according to the installation of support materials was reviewed in consideration of shotcrete and rock bolts.

A Study on the Stability of Underground Structure considering the Orientation and the Stiffness of Discontinuity (불연속면의 경사와 강성을 고려한 지하구조물 안정성에 관한 연구)

  • Lee, Seung-Ho
    • Tunnel and Underground Space
    • /
    • v.7 no.1
    • /
    • pp.65-74
    • /
    • 1997
  • Underground structures show different behaviors depending upon the space and the mechanical characteristics of discontinuities, such as joints, beddings, faults and shear zone. Desingning the rock structeres without considering the significance of these discontinuities can lead to false conclusions. This paper includes study on the following topics; the numerical analysis of continuous rock and discontinuous rock around a tunnel, the influences on shotcrete moment and rock-bolt axial force of tunnel due to different joint orientation and stiffness.

  • PDF

Quality, Setting and Hardening Properties of Rapid Set Accelerators (숏크리트용 급결제의 품질, 응결 및 경화특성)

  • 김진철;류종현;안태송
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.323-328
    • /
    • 2002
  • Rapid set accelerators are widely used in tunnel construction, however quality criteria of and dosage are not well established. The density and solid content of admixtures, setting time and compressive strength of paste and mortar with admixtures were investigated to establish the quality criteria. While the early strength of mortar with sodium-silicate, sodium-aluminate and calcium aluminate type admixtures that have high alkali content are very high, but long-term strength are low. Aggregates of shotcrete has to be carefully selected. Sodium-silicate type admixture need longer setting time than the others.

  • PDF

Properties of the SHOT Remitar a Wet System for Small Bore Tunnels (소구경 터널에 사용되는 SHOT PATCH용 레미탈의 특성)

  • 정민철;전용희;정종익;박길수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.871-876
    • /
    • 1998
  • The SHOT PATCH System Remitar is a mortar shotcreting system which used fairly small machine and equipment, and is applied for shortcrete tunnel linings, in particular for small bore tunnels of aqueducts by the TBM(Tunnel Boring Machine) method, and for repairing tunnels suffering from spring water and deterioration. This study shows the characteristics of the new mortar shotcreting system, the SHOT PATCH System Remitar, which exhibits excellent shotcrete performance.

  • PDF

FEM Analysis on the PD-3 Tunnel Section (유한 요소법에 의한 터널해석(사례문제 2))

  • Kim, Gyo-Won;Eom, Gi-Yeong;Lee, Jae-Seong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.108-122
    • /
    • 1991
  • For the tunnel pattern of PD-3, a numerical analysis using the FEM program, MrSoil, was conducted with given geotechnical properties of surrounding rockmasses to verify the analysis results by comparing with other programs. The analyzed domain was extended to the far enough distance from the excavation surface to avoid the restrained effect by the boundary condition, and the construction sequence was employed in the analysis as calculation steps to simulate the time dependent 3 dimentional behavior of surrounding ground due to tunneling. Maximum 35 mm of the tunnel crown settlement and about 13 mm of the surface settlement were computed and the amount of settlement may not give any structural damage on the concrete structures on the ground surface. The shotcrete stress of 84 kg/cm2 and the rockbolt axial force of 9 ton as a maximum are within the allowable limit. The plastic zone was restricted near the excavation surface, but forepoling around the crown may be required to prevent rock falling. It is believed that the tunnel is designed reasonablely from the economical and safety points of view.

  • PDF