• Title/Summary/Keyword: Shortening of the Construction Time

Search Result 106, Processing Time 0.024 seconds

A Study on Early-strength Development of Concrete Using Accelerating AE Water Reducing Agents for the Estimation of Optimum Duration (촉진형 AE감수제를 사용한 콘크리트의 최적공기산정을 위한 조기강도 발현 특성 연구)

  • Lee, Joo-Hun;Sa, Soon-Heon;Ji, Suk-Won;Jeon, Hyun-Gyu;Seo, Chee-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.91-94
    • /
    • 2006
  • The way to shorten a construction period is considered to an very important technology development element as reducing the formwork removal periods with promoting strength revelation own concrete. This study executed experiment to review usability of early strength revelation chemical admixture which is judged in ways effective with premature removal of form about concrete. Use of early strength revelation AE water reducin admixture is apperaing so that strength revelation by early hydration promotions is excellent. The results of being applied proposed work process are that compressive strength are appeared more than 5MPa within 16 hours so that removal of vertical form was possible. the concrete compressive strength satisfied with a more than 2/3 of specified concrete strength for removal of horizontal form are appeared in 42 hours of 27 MPa proportioning strength, in 36 hours of 30, 35 MPa proportioning strength so that the 6 days cycle time of concrete structural frame work is cut by 2 days as shortening delayed period in works of removing slab forms. So construction cost reductions and a construction period shortening are judged so that it is possible.

  • PDF

Analysis for Column Shortening of RC Frame Structures Considering the Construction Sequences (시공단계를 고려한 RC 프레임의 기둥축소 해석)

  • 곽효경;서영재
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.210-217
    • /
    • 1999
  • This paper deals with the analysis for column shortening of RC frame structure considering the construction sequences. The time-dependent effects of concrete are taken into consideration in this study to simulate the actual structural behavior. The stiffness matrix of a beam element is derived on the bases of the layer approach, dividing a section with imaginary layers. Creep and shrinkage strains at each layer are calculated by using the first-order algorithm based on the expansion of creep compliance. Finally, the correlation studies with the purpose of analyzing the time-dependent behavior of building structure are conducted using the analytical model proposed in this study.

  • PDF

Measured and Predicted Column Shortening of a Tall Reinforced Concrete Building (고층 콘크리트 건물의 기둥축소량 계측연구)

  • 김원상;조한욱;오정근;염경수
    • Journal of the Korea Concrete Institute
    • /
    • v.11 no.3
    • /
    • pp.161-170
    • /
    • 1999
  • The KLCC Petronas Tower 2, one of the world tallest twin reinforced concrete towers constructed in Kuala Lumpur, Malysia, was instrumented during construction for the measurement of vertical time-dependent deformation of columns and corewall. Field measurements were made by means of vibrating wire strain gauges at the corewall, tower and bustle perimeter columns at selected floor levels of the building. Parallel to this observation, laboratory tests were performed on concrete cylinders made in the field in order to obtain the variations of concrete compressive strengths, elastic moduli, strains of creep and shrinkage with time. Monitored vertical deformations are in a good agreement with the prediction based on actual construction sequence and concrete properties from laboratory tests, as well as the analytical results reflected in actual column compensation of the building.

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

Minimization of differential column shortening and sequential analysis of RC 3D-frames using ANN

  • Njomo, Wilfried W.;Ozay, Giray
    • Structural Engineering and Mechanics
    • /
    • v.51 no.6
    • /
    • pp.989-1003
    • /
    • 2014
  • In the preliminary design stage of an RC 3D-frame, repeated sequential analyses to determine optimal members' sizes and the investigation of the parameters required to minimize the differential column shortening are computational effort consuming, especially when considering various types of loads such as dead load, temperature action, time dependent effects, construction and live loads. Because the desired accuracy at this stage does not justify such luxury, two backpropagation feedforward artificial neural networks have been proposed in order to approximate this information. Instead of using a commercial software package, many references providing advanced principles have been considered to code a program and generate these neural networks. The first one predicts the typical amount of time between two phases, needed to achieve the minimum maximorum differential column shortening. The other network aims to prognosticate sequential analysis results from those of the simultaneous analysis. After the training stages, testing procedures have been carried out in order to ensure the generalization ability of these respective systems. Numerical cases are studied in order to find out how good these ANN match with the sequential finite element analysis. Comparison reveals an acceptable fit, enabling these systems to be safely used in the preliminary design stage.

An Experimental Study on Strength Properties of Early Strength Concrete for Reduction of Working Period in Apartment (공동주택 공기단축을 위해 개발된 조강 콘크리트의 강도 발현 특성에 관한 연구)

  • Jung, Yang-Hee;Lee, Jae-Hyun;Keum, Kyoung-Hun;Lee, Won-AM;Kim, Sun-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.157-160
    • /
    • 2009
  • The decision of the Form removal time which leads the early assuring strength of the concrete from Apartment construction is the fact which is important from Reducing the period of works and the economical efficiency side. Especially, with Complex building of recent times the same Tall building and Multiple Apartment Site which only follows in upgrade of interior construction of apartment site and shortening the frame construction period becomes very, importantly is the actual condition where the effort which is various for this is attempted. But is caused by with limit and economical efficiency problem of case concrete early strength revelation of most and is not put to practical use is the actual condition. Develops concrete mixture which is a utility from the research which sees hereupon and the effect which is economic leads construction duration shortening under maximizing boil.

  • PDF

Vertical Shortening Considerations in the 1 km Tall Jeddah Tower

  • Peronto, John;Sinn, Robert;Huizinga, Matthew
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.1
    • /
    • pp.21-31
    • /
    • 2017
  • Jeddah Tower will be the first man-made structure to reach a kilometer in height upon its completion in 2019. From conception, it was clear that an all-concrete superstructure would present many advantages for a building of such unprecedented height and slenderness. An all-concrete structure, however, did present many challenges that needed to be addressed in the system arrangement and through comprehensive analysis and design, among them vertical shortening effects due to the time-dependent creep and shrinkage of concrete. This paper outlines and presents the engineering solutions developed by the authors regarding this complex concrete material phenomenon, while addressing the construction and regional challenges associated with realizing a concrete tower of this unprecedented scale.

Opened Slab Based on Top-Down Method (개방형 슬래브를 이용한 지하 역타공법)

  • Jeon, Keum-Seok;Goh, Soo-Jin;Yom, Kyong-Soo;Rhim, Hong-Chul;Choi, Lin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.9-12
    • /
    • 2006
  • In recent years, construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. In the case of underground construction, especially, there are many restrictions and difficulties. Shortening of the construction time in construction of underground, we use top-down method in undergroud wall. A open slab has been designed for the purpose of overcoming a weak point of former top-down method. This study based on open slab on the under ground top-down method, to more improve constructability, to introduce the effect and the performance of top-down method.

  • PDF

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers (저층·고층 아파트가 혼합배치된 단지에서 공기단축이 건설사업비에 미치는 영향 분석)

  • Bang, Jong-Dae;Chun, Young-Soo;Jun, Myoung-Hoon;Kim, Sa-Rang;Lee, Do-Heun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.415-421
    • /
    • 2012
  • In case of Korean housing complex, there became more mixed arrangement of buildings with different number of layers for a variety of urban skyline, recently. For example, around 33% of the construction sites of 'A' public corporation have gaps of more than 4 layers between high-rise buildings and low-rise ones in the same site, according to the survey. Generally, construction duration of the housing complex is estimated based on the layers of the highest building. Due to this baseline, whole construction duration could be extended so that the project cost could be increased. Therefore, framework duration of higher-rise buildings should be reduced to secure the feasibility of the project. On the other hands, these shortenings could adversely harm the feasibility in some cases because there are a wide range of combinations of the buildings with different number of layers in designing housing complex. Therefore, this study shows the results of analysis on effects of framework time shortening on the cost in housing complex project. Moreover, this could set the baseline of checking possibilities in condensing the construction duration of projects with buildings of different layers by supplying comprehensive database.