• 제목/요약/키워드: Short-Circuit current Calculation

검색결과 36건 처리시간 0.029초

3상계통에서 단상변압기에 대한 단락전류계산 기법 (A Technique for a Short-Circuit Current Calculation to The Single-Phase Transformer in the Three-Phase Systems)

  • 박재훼;진태석
    • 전기학회논문지P
    • /
    • 제57권2호
    • /
    • pp.170-175
    • /
    • 2008
  • This paper describes the exact short-circuit current calculation technique for the single-phase transformer which is installed in the three-phase systems and shorted in the secondary side. Not only the results for a short-circuit current calculation in the existing literatures are wrong, but also little literature deals with the short-circuit current for a single-phase transformer. So, this paper presents a theoretical study and calculation method for a single-phase short current. The validity of the presented method is investigated through Simulation using "Power Tools" and "PSim" program.

IEC 60909에 의한 삼상 고장계산 (Three-phase Fault Calculation by IEC 60909)

  • 손석금
    • 전기학회논문지P
    • /
    • 제63권1호
    • /
    • pp.12-18
    • /
    • 2014
  • This paper analyzes how to calculate the three phase short circuit current calculation procedures used in the IEC 60909 short circuit. It presented the new procedure of the fault current for the interrupting capacity of the circuit breaker. This procedure is applied to the future power system and calculates the fault current. Power demands are increased because of the growth of the economy for this reason, the fault current of the power system is largely increased and the fault current procedure for the proper interrupting capacity calculation of the existing or the new circuit breaker is essential. How to calculate the three phase short circuit current for ac electrical system and select the high voltage and low voltage circuit breaker based on IEC 60909 standards.

3상 90 MVA 단시간전류시험 설비 구축 (The construction of 3-phase 90 MVA short-time withstand current testing facilities)

  • 서윤택;김용식;윤학동;김맹현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.700-702
    • /
    • 2005
  • The most electrical apparatus should be able to withstand short-time current and peak current during a specified short time until circuit breakers have interrupted fault current. It defines the short-time withstand ability of electric a apparatus to be remain for a time interval under high fault current conditions. It is specified by both dynamic ability and thermal capability. KERI(Korea Electrotechlology Research Institute) recently constructed the new short-time current and low voltage short circuit testing facilities. This paper shows short- circuit calculation of transformer and describes high current measuring system, and evaluate the result of short-time withstand test used in $3{\phi}$ 90MVA short-time current testing facilities.

  • PDF

IEC 표준에 의한 고장전류 계산과 보호협조 (Fault Current Calculation and Coordination by IEC Standards)

  • 손석금
    • 조명전기설비학회논문지
    • /
    • 제28권12호
    • /
    • pp.6-12
    • /
    • 2014
  • The safety and reliability of the power system short-circuit current, the short-circuit current depends on the failure to obtain the objective is to quickly eliminate the breaking capacity of the circuit-breaker selection of the cable, the insulation of electrical equipment and protective relay an important factor in determining the level correction and protective relay selection scheme to be meaningful. Standards used in the domestic circuit breaker is applied to the production of IEC standard, but the American National Standards (ANSI / IEEE) by NEMA specification of the fault current calculations and the application of the asymmetric coefficient Korea. Therefore, in this paper, the IEC 60909 standard IEC breaker fault current calculation method and the method for selection of system configurations reviewed and protection system for reviewing the configuration of various protective relays appropriate correction and the correction value is main protection, back-up protection the equipment so that the period of protection relay coordination to minimize accidents and accident protection to minimize interruptions proposed for cooperation.

±750[V] 직류배전망의 고장전류 산정에 관한 연구 (A Study on Fault Current Calculation of ±750[V] DC Distribution Grid)

  • 이경민;박철원
    • 전기학회논문지
    • /
    • 제67권10호
    • /
    • pp.1286-1291
    • /
    • 2018
  • In recent years, the proliferation of DER (distributed energy resources) is progressing rapidly. In particular, research on LVDC distribution grid with various advantages has begun. In order to commercialize this LVDC grid, direct current protection method should be established by analysis of DC faults. Recently, the development of HSCB (high-speed circuit breaker) for new ${\pm}750[V]$ LVDC grid has been researched. This paper deals with the calculation of the maximum short-circuit fault current of the HSCB as a part of the development of HSCB for the LVDC distribution grid. First, modeling using PSCAD was carried out for PV array with BESS on the Gochang Power Test Center system. Next, to calculate the rated capacity of HSCB, fault currents were calculated and the characteristics were analyzed through fault simulations. Thus, this study results can help to establish short-circuit capacity calculation of HSCB and protection plan for DC protection relay system.

고장계산 및 보호협조 판정 소프트웨어 개발 (A Development of Software about Short-circuit Calculation and Protective-coordination)

  • 박성찬;최장흠;서정민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.159-162
    • /
    • 2002
  • A software, called touch-one, is developed about the determination of short-circuit values and protective co-ordination in power system. The used solution algorithm reviewed intensively, and the protective co-ordination determination technique presented by using the circuit-breaker's current-limitation characteristic. The protective coordination concerns the behaviour of two devices placed in series in an electrical network, with a short-circuit downstream circuit-breaker. It has two basic principles: First, discrimination which is an increasing requirement of low voltage electrical distribution systems. Second, which is less well known: cascading, which consists of installing a device, whose breaking capacity is less than the three-phase short-circuit current at its terminals and helped by main circuit-breaker. With this software, we can construct a electric-power system which is reliable and economic according to user's purpose.

  • PDF

Study of Short-Circuit Currents Around Dĕtmarovice Power Station

  • Ali, Shehab Abdulwadood
    • Transactions on Electrical and Electronic Materials
    • /
    • 제15권3호
    • /
    • pp.117-124
    • /
    • 2014
  • The calculation of short-circuit currents is important for power systems operation and restoration, and for determining the means to protect human lives and properties. In this paper, a part of a power system network, around the D$\breve{e}$tmarovice power station in Czech Republic, was simulated by the well known program EMTP-ATPDraw (Electromagnetic Transients Program-Alternative Transient Program), and short-circuit currents and voltages were calculated at different points in the electric network and presented as a time function by the PlotXY program. Calculations were done just for phase-to-ground, and for the three-phase short-circuit at the Kun$\check{c}$ice substation. The results were important for determining the characteristics of the equipment required to withstand or break the short-circuit current; for this reason, the calculations were repeated using earth-fault resistances only for the case of busbar KUN shown in Figs. 5 and 6.

GMAW 공정에서 아크 안정성의 실시간 측정 (Real-time estimation of arc stability in GMAW process)

  • 원윤재;부광석;조형석
    • Journal of Welding and Joining
    • /
    • 제8권1호
    • /
    • pp.31-42
    • /
    • 1990
  • Arc must be stable during welding first of all other factors for obtaining sound weldment, especially in the automation of welding process. Arc stability is somewhat sophisticated phenomenon which is not clearly defined yet. In consumable electrode welding, the voltage and current variation due to metal transfer enables to assess arc stability. Recently, statistical analyses of the voltage and current waveform factors are performed to assess the degress of arc stability which is assessed and controlled by operator's own experience by now. But, considering the increasing need and the trend of automation of welding process, it is necessary to monitor arc stability in real-time. In this sutdy, the modified stability index composed of two voltage and current wvaeform factors (arc time and short circuit time) reduced from four factors (arc time, short circuit time, average arc current and average short circuit current) in Mita's index by the welding electrical circuit modeling is proposed and verified by experiments to be well estimating arc stability in the static sense. Also, the recursive calculation form estimating present arc stability in the dynamic sense is developed for real-time estimation. The results of applying the recursive index during welding show good estimation of arc stability in real-time. Therefore, the results of this study offers the mean for real-time control arc stability.

  • PDF

PU법에 의한 DC 회로계산 및 실계통 데이터를 이용한 전압강하/고장계산 방법 (A Lecture Note on PU Method thru Calculation of a Simple DC Circuit and Voltage/Fault Analysis of Industrial Power Systems using Actual Data)

  • 이상중
    • 조명전기설비학회논문지
    • /
    • 제28권12호
    • /
    • pp.45-54
    • /
    • 2014
  • This paper presents a lecture note of pu method for power system analysis. The author tries to help students in class better understand the fundamental of pu calculation using a very simple DC circuit. And a voltage drop calculation by pu method for a distribution system is given to help understand the importance of the vector reference in AC circuit analysis. A short current calculation by pu method for a power system with a generator, transformer and transmission line is also presented to show how pu calculation can be applied to real power systems, in which all the data are the ones currently being used by KEPCO and other industrial sites.

Weil-Dobke 합성단락시험로의 최적화 연구 (A Study on Optimization of the Weil-Dobkes Synthetic Short-Circuit Tests)

  • 김맹현;고희석
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권6호
    • /
    • pp.287-292
    • /
    • 2001
  • This paper deals with the configuration, operating principles, systematic calculation method of parameter and optimization method of test circuit for parallel current injection method, series voltage injection method and hybrid synthetic test method as the method for performance test of circuit breaker with extra high interrupting capacity. The test method depicted above is applied to short-circuit making and breaking test (operating sequence :Os CdOs, Od-CdOs) and out-of-phase tests(operating sequence :Os, CdOs) for performance test of the newly-developed 420kV, 50kA and 800kV 50kV puffer-type gas circuit-breaker according to IEC 60056 and IEC 60427. The testing results, evaluation of equivalence for test and analyzed results are also presented in this paper.

  • PDF