• Title/Summary/Keyword: Short project period

Search Result 131, Processing Time 0.027 seconds

An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering (시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리)

  • Hong, Dae Geun;Byun, Hee Chul;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

Analysis of Correlation Between Defective Number of Sewer Pipes and I/I(Infiltration/Inflow) Volume (하수관거내 불량개소수와 I/I발생량간의 상관성분석)

  • Chang, Daehwan;Han, Ihnsup;Woo, Byungha;Hong, Seongjin
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.3
    • /
    • pp.321-329
    • /
    • 2009
  • I/I(Infiltration/Inflow) characteristics should be studied to achieve I/I reduction which is a main object of sewer rehabilitation. However, The scientific and practical studies which are based on actual survey within the country are not thorough going enough. The earlier studies were limited because of a short research period and specific region. Thus, In this study, a formula is deduced by intensive correlation analysis between defective number and I/I volume in sewer pipe. It can be used as preliminary data when the project established for cost-effective pipe rehabilitation. The study shows that the researched region have a faulty point at every 9.3m on average and prove correlation between defective number and I/I volume in sewer pipes. Thus, this study can improve the investigation system and estimate the volume of the pipe rehabilitation, when site investigations for rehabilitation have been conducted.

A study on the architectural design for Community welfare facilities through human knowledge/geographical place - Proposal design for Dochon welfare community center - (인문.지리적 장소성 반영을 통한 지역사회복지시설 설계연구 - 도촌종합사회복지관 현상설계 -)

  • Jeong, Hyeock-Jin;Oh, Sae-Won
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.37-45
    • /
    • 2009
  • New city development policy caused many effects such as destruction of nature and area native culture extinction through fast development within short period. The architectural context is remains by post-modern most difficult problem had left to architects. We need to find the design method that communicate and contacts character of place, cultural context through the actual project. In this study, we propose the method of aspect of compose space and design elements to succeed the cultural place and context, desirable development through the design proposal for Dochon welfare center. In Dochon area, there is no original character of the place because of indiscreet development. Dochon synthesis society welfare facilities is openable to people by space that nature and human contacts and accomplishes relation, Made efforts to do so that can do part that causes human's ripple effect of contact with human and accomplishes traffic and recovers identity of Dochon area at the same time recovery of community consciousness.

  • PDF

Embryo transfer in Korean Native Black Goat;Embryo recovery and transfer for the production of transgenic goat (한국재래흑염소 수정란의 이식;형질전환 흑염소 생산을 위한 수정란의 채취와 이식)

  • Shin, Sang-Tae
    • Proceedings of the Korean Society of Embryo Transfer Conference
    • /
    • 2000.05a
    • /
    • pp.64-75
    • /
    • 2000
  • During the last three decades considerable advances has been made in goat embryo production and transfer technology. The Korean native black goat is the most useful domestic ruminant in this country for biological investigation and application because it has a lot of merits such as relatively short generation period (1 vs 2 year for a cow), easy of handling, well adaptation, high fertility, convenient and inexpensive. This article covers the methods of superovulation, estrus synchronization, embryo collection and transfer techniques, pregnancy diagnosis and subsequent pregnancy and kidding rates for the production of transgenic Korean native black goats. More than one hundred goat kids have been produced as a result of our transgenic goat project via microinjection of foreign gene into pronuclei, in vitro culture, transfer of various stages of fresh and frozen-thawed microinjected embryos into oviducts or uteri of recipient does. We have got two transgenic goats carrying a transgene targeting the expression of recombinant human granulocyte colony stimulating factor (hG-CSF) to the mammary gland so far. Since collection and transfer of embryos in this species is usually accomplished by laparotomy, exteriorization of the reproductive tract for surgical embryo collection leads to the formation of post-operative adhesions. Nonsurgical or laparoscopic technique to reduce adhesions from repeated surgeries has great advantages in improving embryo production and transfer especially from valuable donors. We will discuss this later.

  • PDF

Embryo transfer in Korean Native Black Goat: Embryo recovery and transfer for the production of transgenic goat (한국재래흑염소 수정란의 이식: 형질전환 흑염소 생산을 위한 수정란의 채취와 이식)

  • 신상태
    • Proceedings of the Korean Society of Embryo Transfer Conference
    • /
    • 2000.06a
    • /
    • pp.64-75
    • /
    • 2000
  • During the last three decades considerable advances has been made in goat embryo production and transfer technology. The Korean native black goat is the most useful domestic ruminant in this country for biological investigation and application because it has a lot of merits such as relatively short generation period(1 vs 2 year for a cow), easy of handling, well adaptation, high fertility, convenient and inexpensive. This article covers the methods of superovulation, estrus synchronization, embryo collection and transfer techniques, pregnancy diagnosis and subsequent pregnancy and kidding rates for the production of transgenic Korean native black goats. More than one hundred goat kids have been produced as a result of our transgenic goat project via microinjection of foreign gene into pronuclei, in vitro culture, transfer of various stages of fresh and frozen-thawed microinjected embryos into oviducts or uteri of recipient does. We have got two transgenic goats carrying a transgene targeting the expression of recombinant human granulocyte colony stimulating factor(hG-CSF) to the mammary gland so far. Since collection and transfer of embryos in this species is usually accomplished by laparotomy, exteriorization of the reproductive tract for surgical embryo collection leads to the formation of post-operative adhesions. Nonsurgical or laparoscopic technique to reduce adhesions from repeated surgeries has great advantages in improving embryo production and transfer especially from valuable donors. We will discuss this later.

  • PDF

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF

Fatigue Analysis to Determine the Repair Limit for the Damaged Fastener Hole of Aging Aircraft(P-3CK) (노후항공기(P-3CK) 패스너 홀 손상 수리 한계 설정을 위한 피로해석)

  • Kim, Young-Jin;Kim, Hyeung-Geun;Kim, Chang-Young;Chang, Joong-Jin;Lee, Mal-Young
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.12
    • /
    • pp.959-966
    • /
    • 2013
  • In this study, based on P-3CK project using aging aircraft without any design information, the structural assessments of fastener holes to repair the short edge distance defects are investigated. For this purpose, the nacelle longeron which has many defects is selected and then conservative stress is calculated by performing the static analysis of 1.5ED, 1.8ED, 2.0ED defects of longeron fastener holes. This result applies to TWIST standard load spectrum to generate flight load spectrum. Then the crack growth analysis is performed by using flight load spectrum. Through this, the validity of a repaired fastener hole is evaluated. Finally, the standard of repair and the period of maintenance for a defected fastener hole are established.

Changes in Water Quality, Flora and Vegetation of Cheonggye Stream Before, During and After its Restoration (청계천 복원공사 전.중.후의 수질과 식물 및 식생의 변화)

  • Kim Hyea-Ju;Kim Sung-Hwan;Kim Song-Yee
    • Korean Journal of Environment and Ecology
    • /
    • v.20 no.2
    • /
    • pp.235-258
    • /
    • 2006
  • The monitoring of vegetation and water quality before(2003), during(2004) and after(2005) the restoration work of Cheonggye Stream indicated that $BOD_5$ concentration before the project averaged 51.1mg/L and that both the inflow of water from Hang River and the funnel of subway station water into the stream lowered the $BOD_5$ to 3.3mg/L, improving its water quality to the third grade. Species of plants slightly increased from 121 to 132 after the restoration. Specifically, perennial plant comprised 35.6%, an increase from 24.8% recorded before the restoration. Phragmites communis and Zoysia japonica communities were observed as the introduction vegetation. However, Humulus japonicus and Erigeron canadensis communities, which were classified into the first grade according to the vegetation conservation classification, were found to be still prevailing though they were dominant community before the restoration, meaning that the ecological condition of plants had not changed very significantly. An the other hand the water quality of the reference reach was classified into the first grade based on $BOD_5$, which implies the water quality of the section was better than the project reaches. Besides the section had more diverse plant species which numbered 154, and furthermore, the rate of immigrated plants comprised 13% which was lower than 28.8% recorded by the project sections. The project reaches are considered to be inferior to the reference section in terms of ecological condition. The effectiveness of the stream restoration cannot be determined only by such short-term investigation as was conducted in this study, and it is considered that the effectiveness of the restoration of Cheonggye Stream can be determined only if investigations in other major factors are conducted over the long-term period.

A Unification of the Probable Rainfall Intensity Formula at Seoul (서울지방의 통합형 확률강우강도식)

  • Lee, Won Hwan;Park, Sang Deog
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.4
    • /
    • pp.135-143
    • /
    • 1992
  • The probable rainfall depth is an important hydrologic design data in establishing the hydraulic engineering project at urban watershed. This study is to unificate the probable rainfall intensity formula at Seoul. The probable rainfall intensity formula at Seoul is basically formed by the types of Talbot, Sherman and Japanese. But these formulae may be unified to uniform type. The unified probable rainfall intensity formula is more applicable than that of the existing types at Seoul. Especially on the probable rainfall depth of total duration the application of unified formula general type is better than existing types. In this formula, values of n are decreasing with return period and increasing with rainfall duration, and values of coefficient, b, are decreasing with the increase of return period. The range of n varies from 0.55 to 0.60 for short duration, from 0.60 to 0.82 for long duration, and from 0.60 to 0.66 for total duration of probable rainfall depth.

  • PDF

Characteristics of thunderstorms relevant to the wind loading of structures

  • Solari, Giovanni;Burlando, Massimiliano;De Gaetano, Patrizia;Repetto, Maria Pia
    • Wind and Structures
    • /
    • v.20 no.6
    • /
    • pp.763-791
    • /
    • 2015
  • "Wind and Ports" is a European project that has been carried out since 2009 to handle wind forecast in port areas through an integrated system made up of an extensive in-situ wind monitoring network, the numerical simulation of wind fields, the statistical analysis of wind climate, and algorithms for medium-term (1-3 days) and short term (0.5-2 hours) wind forecasting. The in-situ wind monitoring network, currently made up of 22 ultrasonic anemometers, provides a unique opportunity for detecting high resolution thunderstorm records and studying their dominant characteristics relevant to wind engineering with special concern for wind actions on structures. In such a framework, the wind velocity of thunderstorms is firstly decomposed into the sum of a slowly-varying mean part plus a residual fluctuation dealt with as a non-stationary random process. The fluctuation, in turn, is expressed as the product of its slowly-varying standard deviation by a reduced turbulence component dealt with as a rapidly-varying stationary Gaussian random process with zero mean and unit standard deviation. The extraction of the mean part of the wind velocity is carried out through a moving average filter, and the effect of the moving average period on the statistical properties of the decomposed signals is evaluated. Among other aspects, special attention is given to the thunderstorm duration, the turbulence intensity, the power spectral density and the integral length scale. Some noteworthy wind velocity ratios that play a crucial role in the thunderstorm loading and response of structures are also analyzed.