A frame slab method has been proved as a possible and profitable construction solution for the urban tunnels with very shallow overburden and the excavation from the surface Is strictly limited. Since this method allows only a small amount of construction activities in the ground surface, the disturbances to the public and the surface traffic can be drastically reduced compared with the ordinary cut-and-cover method. The construction sequences of the method and the some of critical cautions needed are described in detail. Also a comprehensive numerical analysis including 2-D and 3-D analysis have been performed to verify the stability of the ground during the construction. It is revealed from this study that the frame slab method can be a quite successful solution for the shallow overburden tunnelling in urban area.
본 연구는 도로하부를 통과하는 저토피 터널의 거동특성에 관한 논문이다. 저토피 터널 굴착중에 발생하는 지반변형 특성을 파악하기 위해 시공 중인 도로하부의 저토피 터널 통과구간에 수평 지중 침하계를 설치하였으며, 계측 및 분석을 실시하였다. 또한 현장 계측 값의 비교를 위해 MIDAS NX를 이용하여 지반 조건 및 시공단계가 적용된 3차원 수치해석을 실시하였다. 현장 계측 결과, 터널굴착 시점부에서 선행 침하가 발생되었으며, 지반조건이 불량한 저토피 굴착 시점부에서 큰 침하량이 발생되었다. 수치해석 결과, 지반조건이 불량한 저토피 시점부에서 가장 큰 선행 침하량이 발생 되었다. 수치해석결과 및 현장 계측 값 비교 결과 지반조건이 불량한 저토피 시점부에서 침하량이 크게 발생 되었다. 따라서, 지반조건이 불량하고 충분한 토피고가 확보되지 못하여 터널 주변지반의 아칭 효과를 기대할 수 없는 저토피 구간에서는 강성보강대책의 적용 및 지반이완이 최소화되도록 철저한 주의를 기울여야 한다.
Usually, Steel pipe grouting method or cut and cover method has been applied to tunnel with very shallow overburden or it is situated in valley. However, in case of lack of overburden height to reinforcement tunnel crown which is very difficult to construction. Also, application of cut and cover method that do not consider surrounding site condition causes popular enmity generation and environmental damage. It is the best alternative method that reduces the amount of excavated soil and excavate tunnel under ground to solve these problems. The tunneling method using cover structure which is to prevent a tunnel from collapse because this method can be reduce excavation area and construct tunnel under ground after set a cover structure and backfill ground. In this study, to know more effective structure type, comparative analysis was performed to behavior characters of slab and arch type construction that can be used to cover structure. Also a 2D and 3D numerical analysis have been performed to verify the stability of ground during excavation. As the result, the tunneling method using cover structure that it can be good alternative method for tunnel with shallow overburden and it through valley
우리나라는 국토 전체 면적 중 70% 이상 산악지형으로 철도공사 시 주행성능 확보를 위해 터널 공사가 매년 증가하고 있다. 터널공사가 증가함에 따라 터널굴착 방법 또한 다양해지고 있다. 굴착부의 지반이 풍화암으로 구성되어있으면 다양한 터널굴착 공법이 적용될 수 있지만 굴착부가 파쇄대를 지나거나 저토피의 계곡부를 지나는 경우 터널 굴착 시 붕괴의 위험성을 지니고 있다. 따라서 본 연구에서는 다양한 지반에서의 보강공법을 제시하고자 저토피 및 암질불량구간의 굴착 중인 대표터널을 선정하였다. 수치해석은 암질불량구간일 때 강관을 미적용한 경우와 적용한 경우, 저토피 구간일 때 터널 상부에 고화토를 성토한 경우 강관보강을 적용하여 수치해석을 통해 안정성 분석을 수행하였다.
본 연구에서는 수평 불연속면 하부에 굴착한 얄은 섬도의 2-Arch 터널의 거동을 실험적으로 규명하고자 하였다. 이를 위하여 토피고와 불연속면의 위치를 변화시켜가며 모형실험을 수행하였다. 모형실험은 실제 2-Arch 터널의 Pilot 터널굴착에서 본선터널불착에 이르는 시공단계가 반영된 실험순서에 따라 진행되었다. 연구결과로 부터 토피고에 따른 2-Arch 터널 주변지반의 하중전이 메커니즘의 변화와 불연속면 위치에 따른 이완영역의 분포 및 범위의 변화를 확인하였다. 또한 시공단계에 따른 중앙필러의 역학적 거동을 규명하였으며 불연속면 위치가 터널에 근접할수록 중앙필러 작용하중이 증가하는 것을 확인하였다.
도심지 개착구간의 교통 및 환경적인 영향을 최소화하기 위하여 단면적 $200\;m^2$ 이상의 정거장터널이 퇴적암반 중에 계획되었으나 토피고가 13 m 이하인 설계조건에 직면하게 되었다. 본 연구에서는 패턴설계가 아닌 시공사례와 아칭효과 발현을 기초로 세 가지 요소 - 단면형상의 영향, 작용하중의 적용방법, 지보방안과 터널안정성분석 - 를 중심으로 설계방향이 논의되었다. 단면형상의 역학적인 영향에 기초하여 기본설계안과 연구단면안이 유도되었고, 지보방안은 터널천반부의 침하방지 및 역학적인 평형상태를 유지하기위한 파이프루프 보조공법과 NATM의 지보원리를 활용하였다. 두 설계안의 비교분석으로부터, 터널라이닝을 개착구조물의 연장선상에서 제약한 설계조건과 터널안정성 및 철근배근의 시공성에 대해 기본설계안이 적합한 방안임을 확인할 수 있었다. 그리고 동일한 건축한계로 아치부의 응력집중이 발생되지 않는 안정적인 응력분포를 나타내는 연구단면안의 분석결과에서 보듯이 향후 대단면터널 설계기술의 향상을 위해 단면형상의 영향과 이완하중의 적용방안이 심도 있게 검토되어야 함을 알 수 있다.
Currently an increasing number of urban tunnels with small overburden are excavated according to the principle of the New Austrian Tunneling Method (NATM). Therefore, a possibility of a tunnel collapse during excavation is getting higher in a proportionate manner. This paper will analyze causes the failure mechanism of a shallow NATM tunnel for different geological conditions, ground-water and invert solutions by investigation typical collapse site during tunnel construction. In this paper, this analysis performed two phase, firstly, the field investigation considering displacement measurement, ground-water level, geological characteristic, secondly, the numerical simulation considering the exist of invert construction and the effect of ground-water. It has been found that environmental factors such as state of underground water or construction sequences could influence failure mechanism of a shallow tunnel.
Many of the recent investigations in the field of geotechnical engineering focused on the bearing capacity theories of multilayered soil. A number of factors affect the bearing capacity of the soil, such as soil properties, applied overburden stress, soil layer thickness beneath the footing, and type of design analysis. An extensive number of finite element model (FEM) simulation was performed on a prototype slope with various abovementioned terms. Furthermore, several non-linear artificial intelligence (AI) models are developed, and the best possible neural network system is presented. The data set is from 3443 measured full-scale finite element modeling (FEM) results of a circular shallow footing analysis placed on layered cohesionless soil. The result is used for both training (75% selected randomly) and testing (25% selected randomly) the models. The results from the predicted models are evaluated and compared using different statistical indices (R2 and RMSE) and the most accurate model BBO (R2=0.9481, RMSE=4.71878 for training and R2=0.94355, RMSE=5.1338 for testing) and TLBO (R2=0.948, RMSE=4.70822 for training and R2=0.94341, RMSE=5.13991 for testing) are presented as a simple, applicable formula.
터널 시공 중 천단침하와 내공변위를 측정하는 것이 일반화되어 있다. 터널 시공 중 계측기를 설치한 후 첫 번째로 측정한 천단침하와 내공변위의 1일간 변위량을 각각 초기천단침하속도와 초기내공변위속도로 또 마지막으로 계측한 천단침하와 내공변위를 각각 최종천단침하와 최종내공변위로 정의하고 계측한 최종변위와 초기변위속도의 관계를 분석하였다. 이를 위한 분석용 자료는 서울지하철 906공구에서 터널 시공 중 계측한 것이다. 이 터널의 폭과 높이는 각각 약 11.5 m, 10 m이며 지표에서 터널천단까지의 깊이는 약 10-20 m의 저심도 터널이다. 또 터널이 시공된 지층은 풍화토 또는 풍화암으로 연약한 지반이다. 터널은 상하반으로 나누어 시공되었고 길이는 1,820 m이다. 이번 분석에 이용한 계측치는 터널 상하반 시공 중에 얻은 것으로 천단침하계측 결과가 184개, 내공변위계측 결과는 258개이다. 분석결과 풍화토의 터널에서 초기변위속도와 최종변위가 상대적으로 큰 경향이 있었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.