Ground settlements and pore pressure changes were monitored around a shallow tunnel constructed in clay till during the excavation and primary lining installation. The settlements above the tunnel continued to develop for up to 100 days after the primary lining installation. Triaxial compression tests were carried out to estimate the short-term and long-term deformation characteristics of the till. Numerical simulation was conducted to history match the field measurements, and thus, to quantify the settlements induced by ground stress relief, consolidation and creep. It was found that the surface settlements due to ground stress relief, consolidation and creep are 17, 12 and 71% of total settlement (about 44 mm), respectively. In addition, early installation of rigid concrete lining could be an effective means to reduce the settlement due to creep.
There are several types of foundations for light-weight structures, such as low story buildings, on soft clay deposits. Those foundations, such as piled raft, compensated foundation, mat foundation, floating foundation are commonly used rather then end-bearing piles to get more benefits on the construction and cost savings. In this study, settlement behaviors are computed and compared for several types of foundations on soft clay deposits. Also, theoretical expressions of parameters for piled raft system were provided with co-relations for design purposes. The predictions of settlements of piled rafts foundation are proposed based on the pile dimensions and design loads. From this study, the piled raft foundations is more benefits for reducing the settlement of clay deposits, and it is found that the piled raft system is applicable and effective on thick clay deposits, and that differential settlements of the foundation should be managed by designing the configuration of pile lengths.
Applicability of constructing piled raft foundations on soft clay has been given attention in recent years. Lack of sufficient stiffness for soil and thus excessive settlements to allow higher contribution of piles is the major concern in this regard. This paper presents a numerical investigation of performance of piled-raft foundations on soft clay with focusing on a case study. A 3D FEM numerical model is developed using ABAQUS. The model was calibrated by comparing physical and numerical modeling results of other researchers. Then the possibility of using piled-raft system in construction of foundation for a water storage tank in Sarbandar, Iran is assessed. Soil strength parameters in the numerical model were calibrated using the instrumentation data of a heavily instrumented preloading project at the construction site. The results indicate that choosing the proper combination of length and spacing for piles can lead to acceptable differential and total settlements while a high percentage of total bearing capacity of piles can be mobilized, which is an efficient solution for the project. Overall, the construction of piled-rafts on soft clays is promising as long as the total settlement of the structure is not imposing restrictions such as the common 25 mm allowable settlement. But instead, if higher allowable settlements are adopted, for example in the case of rigid steel tanks, the method shall be applicable with considerable cost savings.
본 연구에서는 점성토지반의 침하량 평가에 보다 적합한 새로운 응력경로시험을 소개하였다. 새로운 시험기법에서는 배압평형과정을 채택함으로써 특정 응력경로상의 모든 점에 대응하는 변형특성을 하나의 시험을 통해 파악할 수 있다. 따라서, 제안된 시험기법을 적용하는 경우, 응력경로법의 실용적인 적용을 위해 필요한 지반의 전반적인 변형거동을 몇 개의 시험만으로 예측할 수 있으며 나아가 기존의 시험기법으로는 수행이 불가능했던 이방적 압밀응력 경로에 대한 변형거동의 평가 역시 실험적으로 가능해진다. 이와 함께 본 연구에서는 성형 카올리나이트 시료에 대해 다양한 응력경로시험을 수행하여 제안된 시험기법의 실험적 적용성을 확인하였으며, 그 결과를 활용하여 전반적인 변형거동과 침하량을 평가하는 실제 과정을 제시하였다.
Consolidation settlements on soft clay are often large and potentially damaging to structures. Currently, large-scale projects are in progress in Korea. These structures will be constructed on both thick and soft clay layers, and so the accurate evaluation of magnitude of settlement is required at every step in design and construction. Especially, secondary compression play an important role in consolidation settlements on soft clay. Generally, the magnitudes of secondary compression are evaluated by laboratory and in-situ consolidation tests or by empirical $C_{a/}$$C_{c}$ relationships. The empirical $C_{a/}$$C_{c}$ may not be only economical, but a fast and powerful tool in estimating secondary consolidation settlement. However, databases of the $C_{a/}$$C_{c}$ relationship for sites in Korea are currently insufficient. The purpose of this study is to investigate the relationship of $C_{a/}$$C_{c}$, on marine clay near the southern sea in Korea. In this study a series of incremental loading consolidation tests (measuring base pore water pressure) are performed. It was found that the $C_{a/}$$C_{c}$ on undisturbed marine clay equaled 0.0397. This value is similar to the value proposed by Mesri and Castro(1987) for inorganic clay and silt. and silt. and silt.
This paper presents case history of railway embankment excess settlement on soft clay during service in southern region of Korea. A lot of field observations show that the measured settlements are a lot larger than settlements actually calculated in this area. Back analysis is carried out to verify the soil parameters which are intended to investigate in the subsurface exploration phase and later in a laboratory test program. Recommendations and causes for the engineering practice are suggested to review the determination of excess settlements and, consequently, to improve the settlement prediction. This enormous discrepancy is due to the passing over secondary consolidation, and the design filling did not meet to real construction filling. Immediate settlement could be subsidiary factor of excess settlement.
Myungji Housing Complex is located in the Nakdong River plain in which the Busan soft clays are developed. It has thick soft soil laver of about GL(-)50m including loose sandy layers, upper and lower clayey layers. The clayey layers have been being consolidated since the land reclamation was completed to build the place for Housing Complex(Apartment) in 1997. Therefore, as one of a series of advance preparations of this project, study was carried on the geotechnical characteristics under the foundation The first part of this paper represents a brief geological history. Then, geotechnical characteristics of clay was analyzed in the classical developments in soft clay. They were based on the geotechnical data obtained by site investigations performed from 1992 to 2005. Finally, we evaluated the average degree of consolidation at this point in time and the residual settlements of upper clayey layer using dissipation and oedometer tests for this project
한계상태설계법상에서 말뚝기초는 상부구조물의 안정성과 공용성에 근거하여 지지력과 침하 량을 만족하도록 설계되어야한다. 본 논문에서는 공용성을 검토하기위해 과압밀된 점토지반에 위치한 9본의 군말뚝과 2본의 단말뚝에 대하여 실무에서 많이 이용되고 있는 예측식과 현장에서 수행한 피조콘 자료를 이용하여 침하량을 산정했다. 지반에 따라 공간적으로 변화하는 탄성계수가 침하예측에 미치는 영향을 간략히 조사했다. 예측방법으로는 단순탄성론적 예측식 인 베직법 (Vesic's method)과 풀러스법 (Poulos'B method)을 이용했으며 산정된 침하량을 실지 말뚝재하실험을 통해서 계측한 것과 비교한 결과 대부분 과다하게 예측했고 지반의 탄성계수를 직선적으로 가정한 같파는 침하계산에 큰 영향은 미치지 않는 것으로 판단되었다.
An attempt has been made to summarize some of the unique geotechnical problems encountered during construction of a few large man-made islands recently completed off the coast of Osaka Bay, Japan. Large settlements appear to be the most serious problem both during and after construction. Settlements due to consolidation of a thick layer of soft alluvial clay that constitutes seabed seem to virtually cease within a relatively short period of time when vertical drains are installed adequately prior to fill placement. Settlements due to compression of underlying thick diluvial deposits consisting of layers of stiff clays interbedded with coarse-grained soils, however, continue over a prolonged period of time and call for special provisions for structures built on the artificial islands to cope with relatively large future settlements. Although accurate settlement prediction is not possible, it is both technically and economically feasible, nevertheless, to construct large-scale islands. Partjcularly attractive and promising is creation of sizable new areas for various purposes, immediately adjacent to highly-developed, densely-populated cities situated along the coast such as those around Osaka Bay.
낙동강은 그 하구 근처에서 김해평야하고 부르는 델타지역을 형성하였다. 김해평야에 퇴적된 점성토는 다른 나라의 점토층에 비해 유달리 두껍다 (최대 60m). 이 지역의 일부는 새로운 공업단지의 개발을 위해 연직 배수재를 설치한 후 평균 5-7m의 높이로 매립하였다. 연약 지반 위에 매립작업을 수행하면서 침하량을 측정하였는데, 실측침하량은 이론적으로 예측한 침하량보다 현저히 크다는 것을 알게 되었다. 이 논문은 김해점토의 퇴적환경의 관점에서 과다침하가 발생되는 이유를 기술하고 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.