• Title/Summary/Keyword: Settlement observation

Search Result 44, Processing Time 0.029 seconds

Consideration of Failure Type on the Ground Excavation (지하굴착에 따른 붕괴유형에 대한 고찰)

  • Lee, Jung-Jae;Jung, Kyung-Sik;Lee, Chang-No
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.660-670
    • /
    • 2009
  • Neighboring construction becomes mainstream of Ground excavation in downtown area. This causes the displacement, deformation, stress condition, etc of the ground surroundings. Therefore Neighboring construction have an effect on Neighboring structure. All these years a lot of Neighboring construction carried out, and the accumulation of technology also get accomplished. But earth retaining structure collapse happens yet. Types of earth retaining structure collapse are 12. 1. Failure of anchor or strut system, 2. Insufficiency of penetration, 3. H-pile Failure on excessive bending moment, 4. Slope sliding failure, 5. Excessive settlement of the back, 6. Deflection of H-pile, 7. Joint failure of coupled H-pile, 8. Rock failure when H-pile penetration is rock mass, 9. Plane arrangement of support systems are mechanically weak, 10. Boiling, 11. Heaving, 12. Over excavation. But field collapses are difficult for classification according to the type, because collapse process are complex with various types. When we consider the 12 collapse field, insufficient recognition of ground condition is 4 case. Thorough construction management prevents from fault construction. For limitations of soil survey, It is difficult to estimate ground condition exactly. Therefore, it should estimate the safety of earth retaining system, plan for necessary reinforcement, according to measurement and observation continuously.

  • PDF

Instrumentations for the Behaviour Observation of the Geotextile on Marine Clayey Grounds (해성점토지반에 설치된 지오텍스타일의 거동 관측을 위한 계측)

  • 조성민;장용채
    • Journal of Korean Port Research
    • /
    • v.14 no.4
    • /
    • pp.463-473
    • /
    • 2000
  • Reinforcement with geotextiles have been used in the foundation soil to enhance the resistance of embankments to avoid failure through excessive deformation or shear in the foundation. It is improtant to know the amount of the strain and the displacement of buried geotextiles for the verification of the reinforcement behaviour. Full scale trial constructions were performed to check the deformational characteristics of the polyester(PET) mat which was used for the embankment reinforcement. Many instrumentation equipments including surface settlement plates, profile gauges and inclinometer casings were installed to observe the behaviour of the soft ground due to the soil embankment. 60 electrical resistance strain gauges and 9 vibrating wire LVDTs were installed 세 measure the deformation of the polyester mat. Results of various tests and geotextile, waterproofing and protection from the hazard environments were introduced. The proposed instrumentation method was effective for the monitoring or the geotextile behaviour. The direct attachment of electrical resistance strain gauges on the gertextile mat was able to measure small changes of the strain of geotextiles. At the end of the 5 month monitoring, 54 of 60 (93%) strain gauges and 7 of 9 (78%) displacement transducers survived all perils of the compaction impacts and the humidity. And the tensile strain of grotextiles increased as the ground displacement became larger. Though the observed strain of mats under the 3m high embankment load was less than 1%, the magnitudes of the strain according to the mat spreading method were different from each other.

  • PDF

Roles of the Community Facilities for Foreigners as a Platform for Urban Globalization - Focused on the Seoul Global Centers - (도시 국제화를 위한 플랫폼으로서 외국인 커뮤니티 시설의 역할에 관한 연구 - 서울시 글로벌센터를 중심으로 -)

  • Choi, Sung-Jin;Han, Sun-Sheng
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.6
    • /
    • pp.81-92
    • /
    • 2019
  • Globalization has diversified ethnic composition thus increased the risk of conflicts and socio-political instability in global cities. However, still the status of community facility in a global city is unclear despite its critical role to build sustainable community in global era. In Seoul, as a reaction of globalization, 19 community facilities known as the 'Seoul Global Center' have been established since 2007 by Seoul Metropolitan Government. These facilities have started to provide basic foreigner services but been transformed to foreigner service hub with multiple functions in terms of a living, a business, a labour, etc. This study explores the role of the community facility for foreigners by using the Seoul Global Center as a case study, conducting a site observation, an interview(13 staff) and a questionnaire(148 visitors). The findings are the community facility functions as a 'global platform' in forms of a policy tool for implementing the urban globalization strategy, a mediator connecting foreign migrants with local communities, an applicant for successful settlement of foreign residents, an incubator that grows human and social capital, and a base for collecting and aggregating information on foreign migrants and forming new local identities.

Brief Observation on Arbitration Agreement and Arbitral Award - Focusing on Construction Disputes - (중재합의와 중재판정에 관한 소고 -건설분쟁을 중심으로-)

  • Cho Dae-Yun
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.273-314
    • /
    • 2004
  • There is a belief in the construction industry that the traditional court system may not be an ideal forum to effectively and efficiently resolve construction disputes due to the protracted proceedings and the three tier appeal system resulting in a long delay in the final and conclusive settlement of the dispute, relatively high costs involved, the lack of requisite knowledge and experience in the relevant industry, etc. Hence, they assert that certain alternative dispute resolution ('ADR') methods, such as mediation, conciliation, arbitration or a new system for dispute settlement in the form of any combination thereof should be developed and employed for construction disputes so as to resolve them more promptly and efficiently to the satisfaction of all the disputants concerned. This paper discusses certain merits of such assertions and the need for additional considerations for effective resolution of the construction disputes in light of the complexity of the case, importance of expert witnesses, parties' relationship and non-level playing field of the construction industry and so on. At the same time, however, given the inherent nature of disputes rendering the parties involved in an adversarial position, it would rather be difficult, if not practically impossible, to satisfy all the parties concerned in the dispute. Accordingly, in this study, it is also purported to address the demerits of such assertions by studying the situation from a more balanced perspective, in particular, in relation to the operation of such ADRs. In fact, most of such ADRs as stipulated by special acts, such as the Construction Industry Basic Act of Korea, in the form of mediation or conciliation, have failed to get support from the industry, and as a result, such ADRs are seldom used in practice. Tn contrast, the court system has been greatly improved by implementing a new concentrated review system and establishing several tribunals designed to specialize in the review and resolution of specific types of disputes, including the construction disputes. These improvements of the court system have been warmly received by the industry. Arbitration is another forum for settlement of construction disputes, which has grown and is expected to grow as the most effective ADR with the support from the construction industry. In this regard, the Korean Commercial Arbitration Board ('KCAB') has established a set of internal rules end procedures in operation to efficiently handle construction disputes. Considering the foregoing, this paper addresses the most important elements of the arbitration, i.e., arbitration agreement and arbitral award, primarily focusing on the domestic arbitrations before the KCAB. However, since this parer is prepared for presentation at the construction disputes seminar for the public audience, it is not intended for academic purposes, nor does it delve into any specific acadcmic issues. Likewise, although this paper addresses certain controversial issues by way of introduction, it mainly purports to facilitate the understanding of the general public, including the prospective arbitrators on the KCAB roster without the relevant legal education and background, concerning the importance of the integrity of the arbitration agreement and the arbitral award. In sum, what is purported in this study is simply to note that there are still many outstanding issues with mediation, conciliation and arbitration, as a matter of system, institutional operation or otherwise, for further study and consideration so as to enhance them as effective means for settlement of construction disputes, in replacement of or in conjunction with the court proceeding. For this purpose, it is essential for all the relevant parties, including lawyers, engineers, owners, contractors and social activists aiming to protect consumers' and subcontractors' interests, to conduct joint efforts to study the complicated nature of construction works and to develop effective means for examination and handling of the disputes of a technical nature, including the accumulation of the relevant industrial data. Based on the foregoing, the parties may be in a better position to select the appropriate dispute resolution mechanism, a court proceeding or in its stead, an effective ADR, considering the relevant factors of the subject construction works or the contract structure, such as the bargaining position of the parties, their financial status, confidentiality requirements, technical or commercial complexity of the case at hand, urgency for settlements, etc.

  • PDF

Numerical Analysis of Multi-dimensional Consolidation Based on Non-Linear Model (비선형 모델에 의한 다차원 압밀의 수치해석)

  • Jeong, Jin-Seop;Gang, Byeong-Seon;Nam, Gung-Mun
    • Geotechnical Engineering
    • /
    • v.1 no.1
    • /
    • pp.59-72
    • /
    • 1985
  • This paper deals with the numerical analysis by the (mite element method introducing Biot's theory of consolidation and the modified Cambridge model proposed by Roscoe school of Cambridge University as constitutive equation and using Christian-Boehner's technique. Especially, time interval and division of elements are investigated in vies of stability and economics. In order to check the validity of author's program, the program was tested with one-dimensional consolidation case followed by Terzaghi's exact solution and with the results of the Magnan's analysis for existing banking carried out for study at Cubzac-les-ports in France. The main conclusions obtained are summarized as follows: 1. In the case of one-dimensional consolidation, the more divided the elements are near the surface of the foundation, the higher the accuracy of the numerical analysis is. 2. For the time interval, it is stable to divide 20 times per 1-lg cycle. 3. At the element which has long drain distance, the Mandel-fryer effect appears due to time lag. 4. Lateral displacement at an initial loading stage predicted by author's program, in which the load was assumed as not concentrative. but rather in grid form, is well consistent with the value of observation. 5. The pore water pressure predicted by author's program has a better accordance with the value of observation compared with Magnan's results. 6. Optimum construction control by Matsuo-Kawamura's method is possible with the predicted lateral displacement and settlement by the program.

  • PDF

Relationship between the Behavior Pattern of Wintering Cygnus and Distribution of Nelumbo nucifera (연꽃(Nelumbo nucifera) 확산과 고니류(Cygnus) 월동의 관계 연구)

  • Hong, Suk-Hwan;An, Mi-Yeon
    • Korean Journal of Environment and Ecology
    • /
    • v.30 no.5
    • /
    • pp.848-856
    • /
    • 2016
  • The purpose of this study is to determine the impact on settlement pattern of wintering swans by distribution of rapidly spreading lotus in Junam reservoir. When we investigated the relationship between the spreading lotus and population variation of the wintering swans in all around Nakdong-river estuary, the spreading lotus did not affect the number of swans in Junam reservoir. The occupation ratio of lotus distribution continuously increased from 13.2%(2013) to 19.0%(2014). Before we begin with the investigation, we compared two particular groups: inside of lotus community and far (>100 m) water area from the border of lotus community. At the first survey(2013.12.17), we observed 3.1 times more swan population in the inside, comparing with far water area. The third(2014.01.29.) and fourth(2014.12.03) inquiries also showed respectively 5.5 and 7.5 times higher swan population in the inside and near water area. The second observation was conducted during visitors were increased so these phenomenon was not observed. This result might be explained as the similar environmental condition of habitate for swan and lotus such as less than 1 m water depth. However, we considered that lotus and swan were not relation of conflict due to increasing both lotus community and swan population at the same time. According to the observation that inhabitation density of wintering swans is significantly high in near lotus communities area, at least spread of lotus did not negatively affect the wintering swans.

Growth observation and orthodontic treatment of a hemifacial microsomia patient treated with distraction osteogenesis

  • Chung, Nam Hyung;Yang, So Jin;Kang, Jae Yoen;Jeon, Young-Mi;Kim, Jong Ghee
    • The korean journal of orthodontics
    • /
    • v.50 no.2
    • /
    • pp.136-144
    • /
    • 2020
  • Hemifacial microsomia (HFM) patients may experience emotional withdrawal during their growth period due to their abnormal facial appearance. Distraction osteogenesis at an early age to improve their appearance can encourage these patients. Some abnormalities of the affected side can be overcome by distraction osteogenesis at an early age. However, differences in the growth rate between the affected and unaffected sides during the rest of the growth period are inevitable due to the characteristics of HFM. Therefore, re-evaluation should be performed after completion of growth in order to achieve stable occlusion through either orthognathic surgery or camouflage orthodontic treatment. An eight-year-old patient visited the clinic exhibiting features of HFM with slight mandibular involvement. He received phase I treatment with distraction osteogenesis and a functional appliance. Distraction osteogenesis was performed at the right ramus, which resulted in an open bite at the right posterior dentition. After distraction osteogenesis, a functional appliance and partial fixed appliance were used to achieve extrusion of the affected posterior dentition and settlement of the occlusion adjustment on the unaffected posterior dentition. The patient visited the clinic regularly for follow-up assessments, and at the age of 20 years, he showed facial asymmetry of the mandible, which had deviated to the right side. He received orthodontic treatment to improve the occlusion of his posterior dentition after the growth period. Without orthognathic surgery, stable occlusion and a satisfactory facial appearance were obtained through camouflage orthodontic treatment.

An Experimental Study on Optimum Slanting Angle in Reticulated Root Piles Installation (그물식 뿌리말뚝의 최적 타설경사각에 관한 실험 연구)

  • 이승현;김병일
    • Geotechnical Engineering
    • /
    • v.11 no.2
    • /
    • pp.29-36
    • /
    • 1995
  • Load testis are executed on model reticulated root piles (RRP) to figure out the optimum slanting angle in the piles installation. One set of model RRP consists of 8 slanting piles which are installed in circular patterns forming two concentric circles, each of which is made by 4 piles. Each pile which is a steel bar of 5m in diameter and 300mm in length is coated to become a pile of 6.5mm in diameter. The slanting angle of the model RRP varies from 0$^{\circ}$ to 20$^{\circ}$ Comparing ultimate bearing capacities of the model RRP of different installation angles, it is observed that the ultimate capacities of the RRP increase as the installation angle increases until 15$^{\circ}$, and the optimum slanting angle of the RRP is around 15$^{\circ}$ The ultimate bearing capacity of the 15$^{\circ}$-RRP is found to be 22% bigger than that of the vertical RRP and 120% bigger than that of the circular surface footing whose diameter is same with the circle formed by outer root piles'heads. However, it is noticed that when the slanting angle of the RRP is increased over 15$^{\circ}$, the ultimate capacity starts to be reduced. The ultimate capacity of 20$^{\circ}$-RRP is even smaller than that of the vertical RRP by as much as 5%. From the observation of the load settlement curve obtained during the RRP load tests, it is known that as the slanting angle gets bigger the load -settlement behavior becomes more ductile.

  • PDF

A Study on the Operational Status of Locally Oriented Family Nurturing Support Projects: with a Focus on the Operational Cases of the Child Care Support Center of Jinju City (지역중심 가정양육지원사업의 운영 실태에 대한 연구: 진주시 육아종합지원센터 운영사례를 중심으로)

  • Kim, Eun Ju;Yeon, Hee Jong;Lee, Young Kyoung
    • Korean Journal of Childcare and Education
    • /
    • v.11 no.1
    • /
    • pp.209-230
    • /
    • 2015
  • The purpose of this study is to find out the operational status of regionally focused home rearing support projects. The existing rearing support policies on the government level are assessed as not capable of reflecting various requirements of each family and not practically supportive. Therefore, to overcome these limitations, this study focused on the operation case of Jinju City's child rearing comprehensive support center, which is operating various rearing support projects on the regional community level. To find out the operation status of regionally focused home rearing, this study performed literature collection related to home rearing support projects in JinjuCity, interviewed the persons in charge as well as participants, and observation by actual participation. The results show the characteristics of realization of publicity in child rearing focused on municipalities, operation of projects with consistent directionality, and creation of networks reflecting various characteristics and requirements of the community, through the operation status of regionally focused home rearing. This study will be a useful reference for the settlement and operation of the child rearing comprehensive support center, which is entering into a new transition period, and is meaningful as this study provides the basic material for the desirable direction to be pursued by the regionally focused home rearing support projects.

Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal (터널 입구부 대절토 사면 안정성 사례 연구)

  • Park, Dong Soon;Bae, Jong-Soem
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.115-129
    • /
    • 2015
  • The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.