The Determination of settlement boundary for the rock filled embankment using seismic geotomography (탄성파 토모그래피 기법을 이용한 제방의 사석침하 평가)

  • Won, Kyoung-Sik;Park, Chung-Hwa;Jeong, Baek;Park, Sang-Uk
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.89-93
    • /
    • 2002
  • Seismic geotomography method was performed to verify rock-filled settlement and its stability in No.38+0 profile and No.40+0 profile. The velocity distributions of geotomography method expressed the quantitative value of the ground conditions. The rock-filled layer and in-situ sediments layer are clearly divided on the basis of seismic velocity 2100 m/sec which is derived from the results of seismic geotomography and boring. Current rock-filled settlement conditions are somewhat different from designed settlement estimation line. Seismic geotomography represents current settlement conditions as a quantitative analysis.

A Study on the Safety Prediction of Embankment Using Simple Parameter Estimation Method (물성치 추정을 통한 성토안정성 예측)

  • Park, Jong-Sung;Hong, Chang-Soo;Hwang, Dae-Jin;Seok, Jeong-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.888-895
    • /
    • 2009
  • Compaction is a process of increasing soil density using physical energy. It is intended to improve the strength and stiffness of soil. In embankment, degree of compaction affects the construction time, money, also method of soil improvement. In large scale embankment project, difficulties of embankment should change due to uncertainty of settlement. So it is very important to predict the final settlement and factor of safety induced by embankment. In many construction site, there are primarily design of high embankment using in-situ soil. Therefore numerical analyses are necessary for valid evaluation of the settlement prediction. But due to the construction cost and schedule, there were lacking in properties of soil and also limited number of in-situ test were performed. So we proposed the method that can easily estimate the proper soil parameters and suggest the proper method of numerical analysis. From this, two-dimensional finite-difference numerical analysis was conducted to investigate the settlement and factor of safety induced by embankment with various case of compaction rate and embankment height.

  • PDF

The Study of Improvement Effect of Ground Settlements and Bearing Capacity by Stone Columns (스톤컬럼 공법의 지내력 증진 효과에 대한 연구)

  • Park, Sang-Kook;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.4
    • /
    • pp.123-132
    • /
    • 2008
  • Aseries of in-situ tests and ground water level measurements with stone and slug materials had been conducted to find out effect of ground settlement reduction and bearing capacity improvement by the Stone Column method. As the result of the tests, it was proved that the Stone Column method is effective for reduction of ground settlement and improvement of bearing capacity. In addition the ground water level went down without overburden load. These results show that the Stone Column method is effective for an increase in density and resistance to liquefaction. The results of estimation of ground settlement and bearing capacity by general theoretical equation, it show that the Stone Column method increases bearing capacity by 2.7~5.7 times and decreases ground settlement by 2~3.5 times.

Full-Scale Model Test of Vertical Drain Materials using Recycled Aggregates and Crushed Stone (순환골재와 쇄석을 이용한 연직배수재의 실내모형실험)

  • Lee, Dal-Won;Lee, Jeong-Jun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.5
    • /
    • pp.103-111
    • /
    • 2012
  • In this study, the full-scale laboratory model test on utilization of recycled aggregates and crushed stone as vertical drains to use an alternative material of sand in soft ground is performed. The settlement and pore water pressure were measured to evaluate the discharge capacity and filed application, and the results were compared and analyzed through the finite element method. The measured and estimated settlement in all vertical drain materials decreases gradually with the load increase. The measured settlement 6.55~8.63 mm, and the estimated by the Hyperbolic model was 7.45~7.92 mm. So the model used for the analysis can be applied to the settlement estimation of the actual field. The variations of pore water pressure with time showed constantly regardless of the load in all vertical drainage materials. The pore water pressure was similarity to that of sand after rapid drawdown. Therefore, it was applicable to the field because discharge capacity was enough to be an alternative material to the sand which had been being used as the vertical drains.

A Study on Surface Settlement Prediction Method of Trenchless Technology Pipe Jacking Method (비개착 강관압입공법의 지표침하 예측방법 연구)

  • Chung, Jeeseung;Lee, Gyuyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.11
    • /
    • pp.29-37
    • /
    • 2015
  • Non-excavation method is needed to secure the stability of existing structures during construction. Therefore, prediction of ground settlement is essential. Causes of settlement when using steel pipe indentation method are leading pipe-steel pipe gap, excessive excavation and soil-steel pipe friction etc. Also they are similar to the causes of settlement when using Shield TBM during construction. In this study, ground settlement during steel pipe indentation is predicted by the Gap Parameter Method and Volume Loss Method which are kinds of Shield TBM prediction Method. and compared with those of prediction methods by conducting field test. As a result, Volume Loss Prediction Method is the most similar to the field tests. However, It is needed to additional studies, such as decision of the factors and adaptability for total settlement predictions of non-excavation method.

Analysis of ground settlement due to circular shaft excavation (원형 수직구 굴착에 따른 발생 지반침하 분석)

  • Moorak Son;Kangryel Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.87-99
    • /
    • 2023
  • Ground excavation inevitably causes ground displacement of adjacent ground, and structures and facilities exposed to ground displacement may suffer various damages. Therefore, in order to minimize the damage and damage to adjacent structures and facilities caused by excavation, ground displacement (settlement and horizontal displacement) in the adjacent ground caused by excavation must first be predicted. There is many ground displacement information induced by general braced cut excavation, but the information is not enough for circular shaft excavation. This study aims to provide information on the estimation of ground settlement caused by circular shaft excavation through the case analysis of circular shafts and comparison with braced cut excavation. From this study, it was found that the use of the settlement criterion of braced cut excavation as the settlement management criterion for circular shaft excavation is a conservative approach in terms of safety. But when considering the economic aspect, it may result in overdesign of the wall and therefore, a more reasonable settlement criterion can be needed for circular shaft excavation.

The Immediate Settlement Estimation of the Improved Soft Ground Using Bamboo Mats (대나무매트로 보강된 연약지반의 즉시침하량 추정에 관한 고찰)

  • Kim, Woo-Jin;Kim, Yoon-Ha;Kang, Jin-Tae;Choi, Yong-Hwan;Kim, Jong-Ryeol
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.5
    • /
    • pp.55-64
    • /
    • 2008
  • When the structure is constructed on the soft ground, the embankment is settleed into the soft ground. At this time, the settlement of the structure is needed to predict. We are using bamboo mats construction only as a way of test construction. Under this circumstance, using the equation of Janbu and Perloff, we calculated the settlement, and analyzed the problem, suggesting proper theoretical equations showing the settlement of soft ground using bamboo mat. Using this equations the settlement was calculated and compared with the result of FEM. The result of the application was very close to the numerical value and the trend of theoretical equations. Using the existing equations, the settlement in Janbu's and Perloff's methods were calculated to be 40% of the actual settlement.

A Trend of Back Ground Surface Settlement of Braced Wall Depending on the Joint Dips in Rocks under the Soil Strata (복합지반 굴착 시 암반층 절리경사 각도별 흙막이 벽체 배후 지표침하의 경향)

  • Bae, Sang-Su;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.83-96
    • /
    • 2016
  • The surface settlement of the back ground of a braced wall due to the ground excavation has the great influence on the safety of the surrounding area. But it is not easy to predict the settlement of the surrounding area due to proud excavation. Estimation of the settlement of the surface ground induced by the deformation of the braced wall is performed by FEM and empirical method (Peck, Clough etc). In this research, surface settlement of the back ground braced wall depending on the joint dips in rocks during excavating the composit ground was measured at the large scale model test (standard: $0.3m{\times}0.3m{\times}0.5m$). The scale of model test was 1/14.5 and the ground was excavated in ten steps. Earth pressure on the braced wall and ground surface settlement on the back ground of a braced wall were investigated. The surface settlement during the excavation depended on the joint dips in rocks on of the ratio of rock layer. Maximum earth pressure and maximum surface settlement were masured at the same excavation step. In accordance with the increase of the rock layer dips and rock layer ratio, the ground surface settlement increased. The maximum ground surface settlement was 17 times larger at 60 degree joint dips in rocks than that of the horizontal ground conditions. And the position of the maximum surface settlement by empirical method was calculated at the point, which was 17%~33% of excavation depth. In accordance with the increase of the rock layer dips and rock layer ratio, the ground maximum surface settlement increased. The ground surface settlement of composite ground is smaller than that of the empirical.

Foundation Analysis and Design Using CPT Results : Settlement Estimation of Shallow Foundation (CPT 결과를 이용한 기초해석 및 설계 : 얕은 기초의 침하량 산정)

  • 이준환;박동규
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.8
    • /
    • pp.5-14
    • /
    • 2004
  • The settlement of foundations under working load conditions is an important design consideration. Well-designed foundations induce stress-strain states in the soil that are neither in the linear elastic range nor in the range usually associated with perfect plasticity. Thus, in order to accurately predict working settlements, analyses that are more realistic than simple elastic analyses are required. The settlements of footings in sand are often estimated based on the results of in-situ tests, particularly the standard penetration test (SPT) and the cone penetration test (CPT). In this paper, we analyze the load-settlement response of vertically loaded footings placed in sands using both the finite element method with a non-linear stress-strain model and the conventional elastic approach. Based on these analyses, we propose a procedure for the estimation of footing settlement in sands based on CPT results.

A Study on the Modified N-value by the Comparison Plate Load Test with Calculated Settlement (평판재하시험과 이론적 침하량 예측식의 비교를 통한 N치 보정방법 검토)

  • Ahn, Chang-Yoon;Kim, Won-Cheul;Hwang, Young-Cheol;Nam, Hyun-Woo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.6 no.3
    • /
    • pp.25-34
    • /
    • 2005
  • The governing design point of shallow foundation is not its bearing capacity but its settlemen and N-value by the SPT is one of the key parameters for settlement estimation. However, if the N-value is more than 50/30, such as 50/10 or 50/20, the N-vlaues are not blow count of 30cm depth penetration. In these cases, the estimated settlements have big difference with the measured values because the applied maximum N value for the settlement estimation is 50. Therefore, in this study, the modified method for N-value estimation is suggested. The settlements by four methods, which are based on Elastic Theory with application of modified N-value, are compared with the Origina Plate Load Test data. The same comparision was carried out with another seven Empirical Methods. The result of this study showed that the error range of settlement is decreased from 260.4~2136.5% to 20.3~272.7%. Among four methods which are based on Elastic Theory, the original method by Elastic Theory is the most accurate with the application of modified N-value. Among Empirical Methods, Terzaghi-Peck's(1948, 1967) modified method 1 is the most accurate with the application of modified N-value. The differences between the original method by Elastic Theory and Terzaghi-Peck's(1948, 1967) modified method 1 are neglectable.