• Title/Summary/Keyword: Series Operation

Search Result 1,264, Processing Time 0.028 seconds

A Fast Time Domain Digital Simulation for the Series Resonant Converter (직렬 공진형 변환기에 관한 시간 영역 디지틀 시뮬레이션)

  • Kim, Marn-Go;Han, Jae-Won;Youn, Myung-Joong
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.534-538
    • /
    • 1987
  • State-space techniques are employed to derive an equivalent nonlinear recurrent time-domain model that describes the series resonant converter behavior exactly. This model is employed effectively to analyze large signal behavior by propagating the recurrent equation and matching boundary conditions through digital computation. The model is verified with a laboratory converter for a steady-state operation.

  • PDF

Operation of StarDB web services and its Virtual Observatory supports

  • Shin, Min-Su;Yi, Hahn
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.40 no.2
    • /
    • pp.60.1-60.1
    • /
    • 2015
  • We present the current operation status of StarDB web services by showing its user access statistics. The StarDB web services started its operation in late November, allowing world-wide users to access results of new variability analysis for Northern Sky Variability Survey light curves. New analysis results of various time-series data have been added to the StarDB services. Importantly, our services have supported a simple cone search, which is an internationally well-defined catalog search interface in the international Virtual Observatory systems. We have collected user access statistics such as how users find our analysis data since its operation in later November. We expect our analysis of the StarDB operation to help Korean community members who plan and operate their own web services preparing for a future era of big survey data.

  • PDF

A Process Planning System for Machining of Dies for Auto-Body Production-Operation Planning and NC Code Post-Processing

  • Dongmok Sheen;Lee, Chang-Ho;Noh, Sang-Do;Lee, Kiwoo
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.2 no.3
    • /
    • pp.69-78
    • /
    • 2001
  • This paper presents a process and operation planning system and an NC code post-processor for effective machining of press dies for production of cars. Based on the machining feature, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor adjusts feedrates along the tool path to reduce machining time while maintaining the quality. The adjustment rule is selected based on the machining load estimated by virtual machining.

  • PDF

A five-axis CAM system for free-surface grinding (금형연마작업을 위한 5축 CAM 시스템)

  • 서석환;이민석;김두형
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.1024-1030
    • /
    • 1993
  • In manufacturing press die with free surface, grinding operation is an important post process for surface finish and dimensional accuracy. With the advancement of NC technology. surface grinding operation is increasingly replaced by the gantry type manipulator. As the mechanics for grinding operation is different from machining operation, conventional CAM system for machining operation is hard to apply. In this. paper, we develop a five-axis CAM system by which an efficient gantry trajectory can be planned and verified. The developed system consists of four conceptual modules; namely CAD, PROCESS. CAM, and ANALYSIS. In the CAD module, the machined surface is represented by CL-data or surface modeler, and process parameters are specified by the PROCESS module. Then, the CAM module generates a series of grinding paths based on the grinding mechanics together with process databases for tool spaces and grinding conditions. The generated paths are verified via ANALYSIS module. Validation via real experiments is left for further study.

  • PDF

Launch Site Activities for the Launch of an Earth Observation Satellite

  • Im, Jeong-Heum
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.195.1-195.1
    • /
    • 2012
  • Korea Aerospace Research Institute has developed an earth observation satellite whose primary mission objective is to provide high resolution electro optical earth images for Geographical Information Systems (GIS) establishment and the applications for environmental, agriculture and ocean monitoring. It was successfully launched into its mission orbit by using a commercial launch vehicle on 18th of May, 2012. This paper describes a series of launch activity at the launch site including its transportation to the launch site. Before conducting the launch site operation, satellite operation plane was prepared. Combining the satellite operation plan and launch vehicle activities, an integrated launch site operation plan and schedule have been drawn up. After arrival of the spacecraft at the launch site, post-ship check out has been conducted. And then it was fuel loaded and integrated with launch vehicle hardware. After completion of final electrical check out, count down procedure was executed. on 18th of May, it was launched into the space and was separated from the launch vehicle as planned. About 3 months of early operation and calibration/validation, now the satellite is conducting its normal mission.

  • PDF

CLINICAL EXPERIENCES OF VASOVASOSTOMIES (정관(精管) 정관(精管) 문합술(吻合術)의 경험(經驗))

  • Lee, Hee-Yong
    • Clinical and Experimental Reproductive Medicine
    • /
    • v.2 no.1
    • /
    • pp.19-38
    • /
    • 1975
  • A total of 185 vasovasostomies were carried out for 11 years. Various factors which are of importance in fluencing the successful vasovasostomies are analysed and presented as follows: In recent years, demand of reanastomosis of the vas deferens increased considerably. An average age of the subjects is 39, and that of their wives, 33 in this series. An average interval between vasectomy and vasovasostomy is 4 years. An average number of living chidren is 2.6 at the time of vasectomy. and 2.1 at the time of time of vasovasostomy. Merchant and public official are the most commonly encounterd occupation in the present series. Coital frequencies are 2.2/week after vasovasostomy. The most common reasons for requesting the vasovasostomy are remarriage and deaths of children, especially son. Success rate is considerably higher among younger group than that of the older. Success rate is somewhat higher among groups of shorter interval between the operations (vasectomy and vasovasostomy) than that of longer interval group. Success rate is higher among bilateral vasovasostomy group than that of any others. Success rate is higher in solid splint group and no splint group than hollow splint group. The closed dressing technique of the end of splint on the scrotum is found to be reasonably effective in preventing infection. Ordinary end-to-end anastomosis and folded side-to-side anastomosis techniques are proved to be the most ideal form of modified operation for the successful vasovasostomies. The most common causes of failure are infection, injuries of blood supply, avascular necrosis due to extensive mobilization, inadequate approximation of both vasal end, hematoma, changes of epididymal environment, and early ambulation in this series. Overall success rate of the author's series is found the 81 per cent, and impregnation rate is 35 per cent. Overall results reported by other workers are that success rate regarding appearance of sperm in the semen after operation is 64 per cent, and that of impregnation after vasovasostomy is 33 per cent. The results of semen assessment performed on same cases prior to vasectomy and following vasovasostomy showed that post-vasovasostomy sperm count scarcely reached three-quaters of pre-vasectomy count.

  • PDF

A New Pulse Frequency Modulation(PFM) Series Boost Capacitor(SBC) Full Bridge DC/DC Converter (새로운 주파수 가변형(PFM) 직렬 부스트 캐패시터(SBC) 풀 브리지 DC/DC 컨버터)

  • Shin, Yong-Saeng;Jang, Young-Su;Roh, Chung-Wook;Hong, Sung-Soo;Lee, Hyo-Bum;Han, Sang-Kyoo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.14 no.2
    • /
    • pp.120-127
    • /
    • 2009
  • This paper proposes a new Pulse Frequency Modulation(PFM)-Series Boost Capacitor(SBC) full bridge DC/DC Converter which features a high efficiency and high power density. The proposed converter controls the output voltage by varying the voltage across the series boost capacitor according to switching frequency and has no freewheeling period due to 50% fixed duty operation. As a result, its conduction loss is lower than that of the conventional phase shift full bridge converter. Moreover, ZVS of all power switches can be ensured along wide load ranges and output current ripple is very small. Therefore, it has very desirable merits such as a small output inductor, high efficiency, and improved heat generation. This paper performs a rationale and PSIM simulation of the proposed converter. Finally, experimental results from a 1.2kW(12V, 100A) prototype are presented to confirm the operation, validity and features of the proposed converter.

Regulated Peak Power Tracking (RPPT) System Using Parallel Converter Topologies

  • Ali, Muhammad Saqib;Bae, Hyun-Su;Lee, Seong-Jun;Cho, Bo-Hyung
    • Journal of Power Electronics
    • /
    • v.11 no.6
    • /
    • pp.870-879
    • /
    • 2011
  • Regulated peak power tracking (RPPT) systems such as the series structure and the series-parallel structures are commonly used in satellite space power systems. However, these structures process the solar array power or the battery power to the load through two cascaded regulators during one orbit cycle, which reduces the energy transfer efficiency. Also the battery charging time is increased due to placement of converter between the battery and the solar array. In this paper a parallel structure has been proposed which can improve the energy transfer efficiency and the battery charging time for satellite space power RPPT systems. An analogue controller is used to control all of the required functions, such as load voltage regulation and solar array stabilization with maximum power point tracking (MPPT). In order to compare the system efficiency and the battery charging efficiency of the proposed structure with those of a series (conventional) structure and a simplified series-parallel structure, simulations are performed and the results are analyzed using a loss analysis model. The proposed structure charges the battery more quickly when compared to the other two structures. Also the efficiency of the proposed structure has been improved under different modes of solar array operation when compared with the other two structures. To verify the system, experiments are carried out under different modes of solar array operation, including PPT charge, battery discharge, and eclipse and trickle charge.

A Study on the monitoring of tool wear in face milling operation (밀링공구의 마모 감시에 관한 연구)

    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.7 no.1
    • /
    • pp.69-74
    • /
    • 1998
  • In order to monitor the tool wear in milling operation, cutting force is measured as the tool wear increased. The digital signal processing methods are used to detect the tool wear . As AR parameter extract the feature of tool wear , it can be used as input parameter of pattern classifier. The FFT monitor the tool wear exactly , but it can not do real time signal processing. The band energy method can be used to real time monitoring of tool wear ,but int can degrade the exact monitoring.

  • PDF

The Comparison of PWM Converter's Topology in Electric Train (철도차량용 PWM 컨버터방식 비교)

  • 이현원;김남해
    • Proceedings of the KIPE Conference
    • /
    • 1999.07a
    • /
    • pp.97-100
    • /
    • 1999
  • AC to DC single phase PWM converter for traction application requires rated high power and voltage. Therefor, series or parallel operation converters are necessary with considering the limitation of the power device specification. This paper compares the characteristic between two parallel operation of conventional PWM converter and Single phase three level converter about comparison of power circuit, cooling system control method and harmonic current by computer simulation.

  • PDF