• Title/Summary/Keyword: Seoul metro

Search Result 359, Processing Time 0.035 seconds

Exchanging of old electrical equipment and discussion of SCADA system's operation related with exchanging of old electrical equipment (노후전력설비 교체에 따른 SCADA시스템의 운용 고찰)

  • Kim, Youn-Sik;Park, Rai-Hyug;Lee, Gi-Seung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.417-422
    • /
    • 2008
  • The DC high speed circuit breaker used in Seoul Metro for line no.1.2 is Japan HITACHI and FUJI breaker, and for line no.3.4 is Whipp & Bourne MM74 breaker from UK. The years that each breakers made are 1973(line no.1), 1984(line no.3.4), So that equipments are superannuated. Nowday the for equipment exchanging is executing, equipment for exchanging were used the Secheron breaker from Swiss. but now the Intec breaker made in Korea is used. The RTU of supervisory control and data acquisition system have the capabilities that can observe, control and work the installation efficiently. In this paper, as summarizing the solving process of problem that happened the SCADA system when old-equipment exchange and concerned point for logical supervision and control of reservation factors and equipment, I'll provide the direction that can do receiving-process of control-equipment, progressed with the exchange of old-electronic equipment.

  • PDF

The Study of Establishment of the Architectural Guidelines of Subway Station (도시철도 정거장의 건축가이드라인 설정에 관한 연구 - 동선시뮬레이션 분석을 통한 배치 및 동선 계획을 중심으로 -)

  • Kim, A-Hyun;Kim, Young-Ook
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.14-23
    • /
    • 2008
  • Today the Seoul metro has become the most important public transportation since opening in 1974. However, planning and design of stations, transfer systems and facilities are discorded by different companies and subway lines. Therefore, there is lack of objective design guidelines to secure legibility and safety in subway space. In this context, we aim to investigate the objective design and planing guidelines in terms of people's cognition and space use pattern. Space syntax method which enables scientific analysis is utilized to examine spatial layout considering passenger's spatial behavior. The research resulted in providing objective design and planning standards.

  • PDF

A study on present status and improvement of protection relay system in subway station for stable power supply (지하철 역사의 안정적 전원공급을 위한 보호시스템 검토)

  • Na, Jong-Woo;Jo, Won-Kang;Park, Dong-Seon;Yoo, Yeon-Seong;Moon, Hwa-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.433-444
    • /
    • 2008
  • Nowadays, subway station has provided not only transportation but living spaces for everyday activities. Therefore, a variety of facilities have been installed for a safety of citizens such as fire-fighting equipment, platform screen doors and giving high level of benefits such as air-conditioning and heating equipment, escalators, lighting apparatus. In order to operate these facilities appropriately, it is needless to say that electric power supply must be reliable. Many protection relays have been installed to protect electric apparatus and power system, nevertheless it..s study has been insufficient in the concrete. From this paper, through analyzing of protection relay system of electric room operated in line 2 of Seoul metro, we can help to improve stable power supply system of subway station.

  • PDF

A study on the Safety of metro-railroad electric power feed system (도시철도 전력 급전시스템에 대한 안전성 연구)

  • Lee, Bong-Jae;Park, Weon-Chan;Kim, Woo-Seob;Jeong, Seong-Yeong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.390-398
    • /
    • 2008
  • While road traffic of sharp rise of an international oil price and capital Seoul reaches to critical point, and a use passenger drives recklessly on the subway which is a cradle of public transportation, the depths analyzes an electric power feed system regarding a ground wealth electric car line of the subway Line 2 East Section which is a long distance (Seongsu $\sim$ Gangbyeon), and future, electric power supply Feeder Distribution Center prepares to Operational Headway shortening along an ATO signal method change by feeder increase supplement, and ensure safety to an electric power supply system, and will solve inconvenience of safe operation and use passenger.

  • PDF

A Study on Minimization of Train Delays and Train Operation Interruptions by RF Transmission System. (RF 통신시스템을 이용한 열차 운행중단 및 열차 지연의 최소화에 관한 연구)

  • Lee, We-Jae;Kook, Kwaung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1466-1472
    • /
    • 2008
  • To minimize the train operation interruptions and train exchanges, the RF transmission system is proposed. The current control room of the Seoul Metro has information of the train movement through the Total Traffic Control System, but it does not have information of the train itself, rail status, and other facilities' status. When some trouble occurs during train operation, the train crews should report the control room about the trouble and fix it. If the control room has exact information of the trouble, the expert in the control room can help the crews to fix the trouble swiftly and exactly. Since the crews are busy taking care of the trouble, they often miss to report the control room on time. The proposed RF transmission system relays the information of the train to the control room automatically in real time, and makes it possible to provide the passengers good service by reducing the train operation interruptions and train exchanges.

  • PDF

A report on the preparation of signaling equipment procedures for the periodic inspection (신호설비 정기검사 절차서 작성에 대한 보고)

  • Ko, Yang-Ok;Seo, Moon-Seog
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.623-629
    • /
    • 2008
  • A periodic inspection for facilities in operation is an inspection that is carried out regularly, in which inspection cycles are drawn up, and it is a series of tests to determine if the condition of all the equipment is maintained, and to identify whether they are to be used or replaced. Reliability should be enhanced, without a breakdown, by preliminary inspection and regular checks for each equipment item installed for equipment maintenance. It was noticed that there was a slight difference for the same facility, and for each organization in terms of inspection cycles and methods while preparing procedures of periodic inspection checklist, inspection methods and cycles for a related organization. Therefore, this paper reviews the optimal methods of inspection procedures for Seoul Metro.

  • PDF

A Study for Development of Integrated DC Railway System Analysis Algorithm (도시철도 급완행 통합해석 알고리즘 개발에 관한 연구)

  • Jang, Dong Uk;Kim, Moo Sun;Hong, Jae Sung;Lee, Hansang
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.4
    • /
    • pp.646-652
    • /
    • 2015
  • Increasing needs for rapid driving vehicles during rush hour, there are various researches how to operate or allocate rapid driving vehicles with the existing normal driving vehicles. In the aspect of power system, it should be preceded by an analysis for power equipment capacity. Also, it should be studied whether the added rapid driving vehicles gives a bad effects for stable operation of railway systems or not. In order to derive the results for these analysis processes, this paper suggest a novel analysis algorithm which can implement integrated analysis including rapid and normal driving railway vehicles simultaneously. This algorithm has been verified using Seoul Metro 7 Line data.

Field Reliability Analysis of S-Bond of AF Track Circuit for Automatic Train Control System (자동열차제어장치 AF궤도회로 S-BOND의 사용신뢰도 분석)

  • Choi, Kyu-Hyoung;Rho, Young-Whan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.2
    • /
    • pp.308-313
    • /
    • 2009
  • This paper presents a reliability analysis of S-bonds for AF track circuits, which detect train movement and transmit a speed control signal to the train. Field survey shows that S-bonds are exposed to very large vibrations transferred from rail, and suffer from frequent failures when they were installed on ballasted track. We collected the time-to-failure data of S-bonds from the maintenance field of Seoul metro line 2, and made a parametric approach to estimate the statistical distribution that fits the time-to-failure data. The analysis shows that S-bonds have time-to-failure characteristics described by Weibull distribution. The estimated shape parameter of Weibull distribution is 1.1, which means the distribution has constant failure rate characteristics like exponential distribution. The reliability function, hazard function, percentiles and mean lifetime are derived for maintenance support.

A Study on the Parallel Control(Change) at the Total Traffic Control (종합열차운행제어의 병행 운전(교체) 방안에 관한 고찰)

  • Kim, Jung-Su;Lee, Jae-Nam;Lee, Gi-Seung;An, Hyun-Jun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.675-682
    • /
    • 2006
  • The command of Subway is intended to adjust and control the train operation, and to play a key role of the total passenger transport and all kinds of affairs related to the safe train operation. Also, this can be considered as affairs to be controlled and operated by Total Traffic Control. For the purpose of developing the ATO system in using the new control technology by substituting the conventional ATS equipment, this technical document includes the technical points resulted from doing the replacement construction in the entire section of Subway Line 2 by Seoul Metro. The replacement work with the new ATO System should neither stop nor affect the system under operation while operating the current ATS System. The different systems should not interfere with each other while performing their individual affairs, and be composed to share the important data for the parallel operation. This technology is needed to proceed in assurance of a high degree of reliability.

  • PDF

Fire simulation for the subway carriage to the replacement of interior materials (도시철도차량 화재 안전도 평가에 대한 연구(II) (화재시뮬레이션 평가 사례를 중심으로))

  • Lee, Duck-Hee;Kim, Jeong-Hun;Jung, Woo-Sung;Jung, Yong-Ju;Kim, Woon-Hyung;An, Chi-Hun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.207-212
    • /
    • 2006
  • In this study we conducted computer simulation with FDS V4.0.5 for the subway carriage of Seoul Metro to the replacement of interior materials. We tried to use the real data for the simulation by testing the interior materials in our Lab. From the result of the simulation we could confirm the fire resistance of the new interior replaced car to the chosen arson scenario case.

  • PDF