• 제목/요약/키워드: Semi-Shield

검색결과 13건 처리시간 0.027초

SEMI-SHIELD 공법의 설계 및 시공상 문제점 (Design and Construction Problems of Semi-Shield Method)

  • 김종인;정성남;박영건
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.1275-1282
    • /
    • 2009
  • The tunnel excavations are used for construction of common utility tunnel, electric tunnel, communication line tunnel, water supply and public sewerage pile line in urban area. The trench cut methods were mainly used in the past, but now, tunneling method is more being used. The tunnel excavation method like as NATM, Messer-Shield, Semi-Shield Methods are being applied to small section tunnel in Korea. The actual construction results of seme-shield method are increasing due to simplified construction process and reduced noise and vibration. And also this method is being used frequently in waterway tunnel and construction of prevention flooding recently. The seme-shield method design guideline is absence except for electric line tunnel construction in Korea, because of the semi-shield method was developed in Europe and Japan. In the prescriptive design, engineer's subjects are tending to intervene, because of absence of standard and specification for details. Therefore, Design and Construction Problems of Semi-Shield Method were described and construction trouble was introduced for exam. These problem and construction troubles have to be examined thoroughly in advance.

  • PDF

A Study of the 3D Unmanned Remote Surveying for the Curved Semi-Shield Tunneling

  • Lee, Jin-Yi;Jun, Jong-Woo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1791-1796
    • /
    • 2005
  • Semi-shield tunneling is one of the propulsion construction methods used to lay pipes underground between two pits named 'entrance' and 'destination', respectively. Usually a simple composition, such as 'a fiducial target at the entrance+a total station (TS)+a target on the machine', is used to confirm the planned course. However, unavoidable curved sections are present in small-sized pipe lines, which are laid after implementation of a road system, for public works such as waterworks, sewer, electrical power, and gas and communication networks. Therefore, if the planned course has a curved section, it is difficult to survey the course with the abovementioned simple composition. This difficulty could be solved by using the multiple total stations (MTS), which attaches the cross type linear LED target to oneself. The MTS are disposed to where each TS can detect the LED target at the other TS or the base point or the machine. And the accurate relative positions between each MTS and target are calculated from measured data. This research proposes the relative and absolute coordinate calculation algorithm by using three MTS to measure a curved course with 20m curvature at 30m maximum distance, and verifies the algorithm experimentally.

  • PDF

RPS 공법의 적용성 연구 (A Study on the Application of Roof Panel Shield Method)

  • 김중희;정병철;신은철;김종인
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1585-1592
    • /
    • 2008
  • 산업사회의 발전에 따라 사회 기반시설분야도 복잡다양해지고 특히 도시기능이 활발해지면서 지금의 도심지에는 지하철, 상수도, 하수도, 전력구, 통신구, 지하보차도, 지하상가, 지하주차장 등 여러 가지 용도의 지하공간이 요구되고 있으며, 이러한 지하 구조물을 축조하는데 있어 도로상에 차량 증가로 인한 교통 혼잡이나, 지하매설물의 장애로 인하여 기존의 개착식 공법으로 시행하지 못하고 지하터널공사로 시행하는 경우가 빈번하다. 기존 국내 외 터널공법 관련문헌과 현재 사용되는 터널공법의 실제 시공에 관한 정보를 수집하여 장 단점, 시공시 주의사항, 적용조건등의 조사내용을 바탕으로 RPS 공법을 고안하였다. 소규모 지하구조물을 구축하기 위한 RPS 공법은 출발갱내에서 상부에 파이프 루프를 시공한 후 광폭 유압 패널이 장착된 철제 선도관을 추진시켜 선도관을 원압잭에 의하여 압입한 후 P.C. 콘크리트 구조물을 거치하고 원압으로 압입 추진토록 하였다. 또한, 대규모 지하구조물 축조시에는 구조물 예정상단부에 지반조건에 따라 파이프 루프공법 또는 소구경 Semi-Shield 공법을 이용하여 루프를 시공함으로써 상부의 침하를 방지하고, 측벽은 광폭유압 패널을 이용하여 여굴의 최소화 및 곡선부 시공을 용이하게 하였다.

  • PDF

철도 및 도로 횡단공법 시공 사례 (Cases of Excavation Methods for Crossing Railway and Road)

  • 김동준;박영호;이윤범;이은철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.429-435
    • /
    • 2003
  • This paper presents the case studies of Tubular Roof construction Method(T.R.c.M) and Semi Shield method, which were applied to the tunnel excavation under the pre-existing railways. It was proved that T.R.c.M was an effective and safe method for the tunnel excavated in soft soil, giving little damage to the railways located a few meters above. Semi Shield was also performed successfully to bore a tunnel in soft and hard rock, minimizing the ground settlement and tilting of vulnerable fuel tanks. Site and soil conditions are also discussed, which led these relatively new methods to success. Finally, comparison of the measurement results and the design values are made to verify and improve the current design practice.

  • PDF

연속굴착 쉴드 TBM 기술 관련 해외기술 및 개발사례 조사 (Investigation of Prior Technology and Development Case for Consecutive Excavation Technique of Shield TBM)

  • 김문규;조정우;차형석
    • 터널과지하공간
    • /
    • 제33권5호
    • /
    • pp.299-311
    • /
    • 2023
  • TBM의 실굴진율을 향상시키기 위한 연속굴착 기술들이 개발되고 있다. 연속굴착은 설치중인 세그먼트를 제외한 나머지 세그먼트에 추력을 가해, 굴진 정지 시간을 줄이는 기술이다. 본 기술보고는 연속굴착 세그먼트에 관한 선행기술을 조사하였다. 주요 선행기술을 헬리컬 세그먼트, 육각형 세그먼트, 기존 세그먼트 방법으로 분류했다. 헬리컬 세그먼트 방법은 아직 시공사례가 없으며, 육각형 세그먼트 방법은 상용화에 성공하지 못했다. 기존 세그먼트를 이용한 연속굴착 방법은 실증에 성공했다. 해당 기술에 대한 추진잭 추력, 운영방법을 분석했다. 국내에서도 TBM 연속굴착 연구개발이 진행 중이며, 성공사례 분석을 통해 독자적인 연속굴착 방법이 개발되어야 할 것으로 판단된다.

Study on the design and experimental verification of multilayer radiation shield against mixed neutrons and γ-rays

  • Hu, Guang;Hu, Huasi;Yang, Quanzhan;Yu, Bo;Sun, Weiqiang
    • Nuclear Engineering and Technology
    • /
    • 제52권1호
    • /
    • pp.178-184
    • /
    • 2020
  • The traditional methods for radiation shield design always only focus on either the structure or the components of the shields rather than both of them at the same time, which largely affects the shielding performance of the facilities, so in this paper, a novel method for designing the structure and components of shields simultaneously is put forward to enhance the shielding ability. The method is developed by using the genetic algorithm (GA) and the MCNP software. In the research, six types of shielding materials with different combinations of elements such as polyethylene (PE), lead (Pb) and Boron compounds are applied to the radiation shield design, and the performance of each material is analyzed and compared. Then two typical materials are selected based on the experiment result of the six samples, which are later verified by the Compact Accelerator Neutron Source (CANS) facility. By using this method, the optimal result can be reached rapidly, and since the design progress is semi-automatic for most procedures are completed by computer, the method saves time and improves accuracy.

점성토 지반에서의 실드 터널 시공에 따른 지표침하 예측 기법 (A Prediction Method for Ground Surface Settlement During Shield Tunneling in Cohesive Soils)

  • 유충식;이호
    • 한국지반공학회지:지반
    • /
    • 제13권6호
    • /
    • pp.107-122
    • /
    • 1997
  • 본 논문에서는 점성토 지반에서의 실드 터널 시공에 따른 지표 침하 예측 기법을 제시하였다. 예측 기법을 개발하기 위해 실드 터널의 시공과정을 모사할 수 있는 3차원 유한요소해석기법을 이용하여 매개변수 변환 연구를 수행하였으며, 해석 결과를 이용하여 지반 거동메카니즘을 고찰하고 지반 거동과 영향 요소와의 관계를 나타내는 데이터 베이스를 구축 하였다. 구축된 데이터 베이스에 대한 다중 회귀분석을 통해 막장 상부에서의 지표 침하비와 변곡점의 위치를 결정하는 반경험식을 개발하고 이를 기존의 정규확률분포함수와 접목시켜 횡단면 및 종단면 지표 침하 형상을 예측하는 기법을 제안하였다. 제안된 예측 기법은 유효요소 해석 결과 및 현장 계측 자료와의 비교를 통해 그 타당성이 입증되었으며, 따라서 제시된 예측 기법은 본 연구에서 고려한 경계조건과 유사한 조건에서 효율적으로 적용될 수 있을 것으로 판단된다.

  • PDF

A Feasibility Study of Guided Wave Technique for Rail Monitoring

  • Rose, J.L.;Lee, C.M.;Cho, Y.
    • 비파괴검사학회지
    • /
    • 제26권6호
    • /
    • pp.411-416
    • /
    • 2006
  • The critical subject of transverse crack detection in a rail head is treated in this paper. Conventional bulk wave ultrasonic techniques oftenfail because of shelling and other surface imperfections that shield the defects that lie below the shelling. A guided wave inspection technique is introduced here that can send ultrasonic energy along the rail under the shelling with a capability of finding the deleterious transverse crack defects. Dispersion curves are generated via a semi analytical finite element technique along with a hybrid guided wave finite element technique to explore the most suitable modes and frequencies for finding these defects. Sensor design and experimental feasibility experiments are also reported.

구조-음향 모드 비연성에 의한 차량의 부밍 소음 저감 (Booming Noise Reduction of Passenger Cars by Mode Decoupling of Structural-Acoustic Systems)

  • 고강호;이장무
    • 소음진동
    • /
    • 제9권4호
    • /
    • pp.822-827
    • /
    • 1999
  • The reduction of booming noise level and improvement of sound quality in the vehicle interior have been major fields of vehicle NVH for many years. In order to reduce the booming noise this paper proposed a system variable, which takes account of mode shapes and natural frequencies of the structural-acoustic system, measurement points and excitation frequency. By simplifying the system variable, the major contributors of panels inculding roof, roof lining, wind shield glasses, doors and floor to booming noise at a specific frequency was experimentally found. Also the relationships between structural modes of roof lining, one of the major contributors, and acoustic modes of compartment cavity were investigated from the viewpoint fo structure-borne noise. In addition, the roof lining was modified structurally by applying marble sponge to the gap between roof and roof lining. Asthe result of structural modification, the booming noise was reduce at target frequency.

  • PDF

고압전동기 모델 코일의 부분방전 분석 (Analysis of Partial Discharge in High Voltage Motor Model Coils)

  • 김희동;공태식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 C
    • /
    • pp.2091-2093
    • /
    • 2005
  • Five model coils of 6.6kV motor were manufactured with several defects. These stator coils have artificial defects such as void of groundwall insulation, removal of semi-conductive coating and damage of strand insulation. Epoxy-mica coupler(80 pF) was connected to five model coil terminals, respectively The voltage applied to the coils was 3.81kV, 4.76kV, 6.0kV and 6.6kV. Partial discharge(PD) tests performed in the laboratory and shield room. Digital PD detector (PDD) and turbine generator analyzer(TGA) were used to measure PD activity. TGA summarizes each plot with two quantities such as the normalized quantity number(NQN) and the peak PD magnitude(Qm). The PD levels in pC were measured with PDD. PD patterns of model coils were indicated the internal and slot discharges. PD patterns coincide with both PDD and TGA.

  • PDF