• Title/Summary/Keyword: Sediment discharge

Search Result 315, Processing Time 0.034 seconds

Sediment Estimation of Large Reservoir Using Daily Flowrate Analysis (일유량 분석을 이용한 대규모 저수지의 퇴사량 추정)

  • 정재성
    • Journal of Environmental Science International
    • /
    • v.6 no.5
    • /
    • pp.417-423
    • /
    • 1997
  • The objective of this study Is to supply basic data for large reservoir sedimentation research In future and make suggestions to maintain and opera능 the reservoir more of efficiently. At first, previous studios about the estimation of sediment yield rate were reviewed in Korea. And the discharge rating curves of upstream stage gauging stations and the correlation between dam Inflow and stage discharge were analyzed. With the analysis results, the spec유c sediment rate of Soyanggang dam was estimated as 608 m3/km2/yr. It was similar to that of Soyanggang dam feasibility study and 1994's field surveys of the reservoir than that of 1983's field surveys. Because the sediment rating curves were derived under the low discharge conditions, It needs to be checked under the flood conditions. However, the suggested methods such as flowrate analysis and sediment estimation will be useful to the sediment studios In future. Key words . reservoir sediment, sediment yield rate, rating curve, flowrate analysis.

  • PDF

Response of estuary flow and sediment transport according to different estuarine dam locations and freshwater discharge intervals

  • Steven Figueroa;Minwoo Son
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.519-519
    • /
    • 2023
  • Estuarine dams are a recent and global phenomenon. While estuarine dams can provide the benefit of improved freshwater resources, they can also alter estuarine processes. Due to the wide range of estuarine types and estuarine dam configurations, the effect of estuarine dams on estuaries is not well understood in general. To develop a systematic understanding of the effect of estuarine dam location and freshwater discharge interval on a range of estuarine types (strongly stratified, partially mixed, periodically stratified, and well-mixed), this study used a coupled hydrodynamic-sediment dynamic numerical model (COAWST) and compared flow, sediment transport, and morphological conditions in the pre- and post-dam estuaries. For each estuarine type, scenarios with dam locations at 20, 55 and 90 km from the mouth and discharge intervals of a discharge every 0.5, 3, and 7 days were investigated. The results were analyzed in terms of change in tide, river discharge, estuarine classification, and sediment flux mechanism. The estuarine dam location primarily affected the tide-dominated estuaries, and the resonance length was an important length scale affecting the tidal currents and Stokes return flow. When the location was less than the resonance length, the tidal currents and Stokes return flow were most reduced due to the loss of tidal prism, the dead-end channel, and the shift from mixed to standing tides. The discharge interval primarily affected the river-dominated estuaries, and the tidal cycle period was an important time scale. When the interval was greater than the tidal cycle period, notable seaward discharge pulses and freshwater fronts occurred. Dams located near the mouth with large discharge interval differed the most from their pre-dam condition based on the estuarine classification. Greater discharge intervals, associated with large discharge magnitudes, resulted in scour and seaward sediment flux in the river-dominated estuaries, and the dam located near the resonance length resulted in the greatest landward tidal pumping sediment flux and deposition in the tide-dominated estuaries.

  • PDF

Assessment of Relationship between Sediment-Discharge Based on Rainfall Characteristic using SWAT Model (SWAT 모델을 이용한 강우특성 변화에 의한 퇴적물-유출량 간의 관계 평가)

  • Kim, Jisu;Kim, Minseok;Cho, Youngchan
    • Journal of Soil and Groundwater Environment
    • /
    • v.26 no.6
    • /
    • pp.118-129
    • /
    • 2021
  • The sediment transportation caused by soil erosion due to rainfall-discharge in the large watershed scale plays critical role in human society. The relationship between rainfall-discharge-sediment transportation is depending on the start time of rainfall and end of rainfall but, the studies related with rainfall characteristics are insufficient. In this study, The Soil and Water Assession Tool (SWAT) model was used to study the relationship between rainfall-discharge-sediment transportation at the Sook river watershed which is monitored by the Ministry of Environment. To do this, first of all, the sensitivity analysis about model attributes was performed using monitored data. The accuracy analysis of SWAT model was conducted using the model's efficiency index (Nash and Sutcliffe model efficiency; NSE) and the coefficient of determination (R2). After that, it was studied what results could be obtained according to changes in rainfall timing and end points. In the result of discharge simulation, the modified rainfall values (sum of total rainfall starting time and end time) showed more high accuracy values (R2:0.90, NSE: 0.8) than original rainfall values (R2:0.76, NSE: 0.72). In the result of sediment transportation simulation, during calibration had more resonable results(R2:0.87, NSE: 0.86) than compared with original rainfall values (R2:0.44, NSE: 0.41). However, validation results of sediment transportation simulation showed low accuracy values compared with calibration results. This results maybe cause monitoring periods of sediment flow compared with discharge monitoring periods. Nevertheless, since rainfall characteristic plays critical rule in model results, continuous research on rainfall characteristic is needed.

Surface Cover Application for Reduction of Runoff and Sediment Discharge from Sloping Fields (경사지 밭에서 발생하는 토양유실 저감을 위한 피복재 적용)

  • Shin, Min-Hwan;Won, Chul-Hee;Park, Woon-Ji;Choi, Young-Hun;Shin, Jae-Young;Lim, Kyoung-Jae;Choi, Joong-Dae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.6
    • /
    • pp.129-136
    • /
    • 2011
  • To measure effects of surface cover on runoff and sediment discharge reduction using rainfall simulator, four(5 m${\times}$30 m scale) plot experiments were conducted in this study. Surface covers made with straw mat, Polyacrylamide (PAM), chaff, and sawdust were simulated 4 times under 31.1~44.4 mm/hr rainfall intensities. Compared with results from control plot, the time of runoff generation is delayed and outflow volume decreased with surface cover. Effects on runoff reduction of straw mat, PAM, sawdust and chaff ranged 4.7~81.5 % and runoff rate reduced by 6.5~76.1 % respectively, when compared with those from control plot. The percentage of decrease in sediment discharge were 99.7~99.8 % from straw mat+sawdust+PAM plots, 85.9~95.6 % from straw mat+PAM plots, and 98.5~99.4 % from straw mat+chaff+PAM plots. The runoff, sediment discharge, and SS concentration reduction efficiencies of the cover materials were outstanding when compared to control plot. It was analyzed that reduction of runoff and sediment discharge were mainly contributed by decrease in rainfall energy impact and flow velocity and increase of infiltration due to the surface cover materials. The results could be used as a base for the development of best management practices (BMPs) to reduce runoff, sediment discharge from sloping field.

Sediment Properties and Long-term Bed Change of Munsancheon (문산천의 유사특성 및 장기하상변동 예측)

  • Lee, Jae-Geun;Ahn, Jae-Hyun
    • Journal of Wetlands Research
    • /
    • v.13 no.2
    • /
    • pp.329-341
    • /
    • 2011
  • This study was conducted with the national river, Munsancheon, which is located in Paju-si, Gyeonggi-do. The sediment discharge of Munsancheon was directly measured to analyze the sediment characteristics, and the results were used in the numerical model to predict the long-term river bed variation. The flow-total sediment discharge relation was derived using the measured total sediment discharge, and the results were compared with the total sediment discharge that was calculated using the existing prediction formula to derive a proper sediment discharge prediction method. In the actual measurements, the total annual sediment discharge was 5,478 ton/year, and the specific sediment discharge was 29.23 ton/$km^2$/year. The Ackers & White formula resulted in the values very close to the actual measurements. With the actual sediment discharge, geographical and hydrologic data as the input variables, HEC-6 and GSTARS models were comparatively analyzed. The test results showed that the HEC-6 model is suitable for the reliable prediction of the long-term river bed variation. Accordingly, the model was used for the long-term river bed variation prediction in this study. In the case of Munsancheon, deposition was continued in the downstream area and erosion occurred in the upstream area on the whole. It was expected that the stream would be stabilized in the river bed condition of 20 years later. The river bed variation was within 1 m, which was at the significance level. In the downstream area that is influenced by tide, however, the accumulation was continuously increasing within the section 2,000-7,000 m from the outlet. It seems that this should be considered in establishing the river management plans.

Sediment discharge assessment and stable channel analysis using Model Tree of data mining for Naesung Stream (데이터 마이닝의 Model Tree를 활용한 내성천의 유사량 산정 및 안정하도 평가)

  • Jang, Eun-Kyung;Ji, Un;Ahn, Myeonghui
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.11
    • /
    • pp.999-1009
    • /
    • 2018
  • A Model Tree technique of data mining was applied to derive optimal equations for sediment discharge assessment based on the measured sediment data and then to evaluate stable channel design for Naesung Stream. The sediment discharge formula as a function of channel width, velocity, depth, slope and median grain diameter which was developed by a Model Tree technique with sediment discharge data measured in Korean River had a high goodness-of-fit between measured and calculated results. In case of the sediment discharge formula as a function of channel width, velocity, depth and median grain diameter which was developed by a Model Tree technique with sediment discharge data only measured in Naesung Stream represented the highest goodness-of-fit. Two types of sediment discharge formulas were applied to evaluate stable channel analysis for Yonghyeol Station of Naesung Stream. As a result, bed erosion was expected in the study section compared to the current section. It was also presented that the be slope might be changed to be a milder slope than the current slope to reach equilibrium condition in the long term.

Numerical analysis on erosion process of replenished sediment on rock bed

  • Takebayashi, Hiroshi;Yoshiiku, Musashi;Shiuchi, Makoto;Yamashita, Masahiro;Nakata, Yasusuke
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.17-17
    • /
    • 2011
  • As a method of countermeasure to bed degradation and armoring phenomena of bed material in the downstream area of dam reservoirs, sediment augmentation (replenished sediment) has been carried out in many Japanese rivers. In general, bed of the replenished sediment site is composed of rocks, because the site is located in the downstream area of the dams and sediment supply is very small. Bed deformation process has been researched by many researchers. As a method of countermeasure to bed degradation and armoring phenomena of bed material in the downstream area of dam reservoirs, sediment augmentation (replenished sediment) has been carried out in many Japanese rivers. In general, bed of the replenished sediment site is composed of rocks, because the site is located in the downstream area of the dams and sediment supply is very small. Bed deformation process has been researched by many researchers. However, most of them can treat movable bed only and cannot be applied to the bed deformation process of sediment on rocks. If the friction angle between the sediment and the bed surface is assumed to be the same as the friction angle between the sediment and the sediment, sediment transport rate must be smaller without sediment deposition layer on the rocks. As a result, the reproduced bed geometry is affected very well. In this study, non-equilibrium transport process of non-cohesive sediment on rigid bed is introduced into the horizontal two dimensional bed deformation model and the model is applied to the erosion process of replenished sediment on rock in the Nakagawa, Japan. Here, the Japanese largest scale sediment augmentation has been performed in the Nakagawa. The results show that the amounts of the eroded sediment and the remained sediment reproduced by the developed numerical model are $56300m^3$ and $26800m^3$, respectively. On the other hand, the amounts of the eroded sediment and the remained sediment measured in the field after the floods are $56600m^3$ and $26500m^3$, respectively. The difference between the model and field data is very small. Furthermore, the bed geometry of the replenished sediment after the floods reproduced by the developed model has a good agreement with the measured bed geometry after the floods. These results indicate that the developed model is able to simulate the erosion process of replenished sediment on rocks very well. Furthermore, the erosion speed of the replenished sediment during the decreasing process of the water discharge is faster than that during the increasing process of the water discharge. The replenished sediment is eroded well, when the top of the replenished sediment is covered by the water. In general, water surface level is kept to be high during the decreasing process of the discharge during floods, because water surface level at the downstream end is high. Hence, it is considered that the high water surface level during the decreasing process of the water discharge affects on the fast erosion of the replenished sediment.

  • PDF

Comparative Evaluation of Some Selected Sediment Transport Formulas (하천 유사량 공식들의 비교평가)

  • Yu, Kwone Kyu;Woo, Hyo Seop
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.10 no.4
    • /
    • pp.67-75
    • /
    • 1990
  • Performances of a total of 6 selected sediment transport formulas including Engelund & Hansen(EH)'s, Ackers & White(AW)'s, Yang(YN)'s, Brownlie(BR)'s, Karim & Kennedy (KK)'s, and Rijn(RJ)'s ones, which have been known to be relatively reliable, were tested using the 1,399 measured sediment discharge data points of the 20 rivers selected from Brownlie's compendium of sediment discharge. The calculated results were plotted with the input parameters such as the unit discharge, mean velocity, flow depth, energy slope, and median diameter respectively, and trend of each formula's performance was analyzed. These analyses revealed that, in general, EH's and RJ's formulas are more reliable, BR's, AW's, and KK's ones are moderately reliable, and YN's one is less reliable. AW's formula drastically overestimates sediment discharge for fine sediment(D<0.15mm), and YN's one under-estimates sediment discharge for streams with large water discharge(q>5 cms/m).

  • PDF

Soil Erosion Modeling in the 3S Basin of the Mekong River Basin

  • Thuy, Hoang Thu;Lee, Giha;Yu, Wansik;Shin, Yongchul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.7
    • /
    • pp.21-35
    • /
    • 2017
  • The 3S Basin is described as an important contributor in terms of many aspects in the Mekong River Basin in Southeast Asia. However, the 3S Basin has been suffering adverse consequences of changing discharge and sediment, which are derived from farming, deforestation, hydropower dam construction, climate change, and soil erosion. Consequently, a large population and ecology system that live along the 3S Basin are seriously affected. Accordingly, the calculating and simulating discharge and sediment become ever more urgent. There are many methods to simulate discharge and sediment. However, most of them are designed only during a single rainfall event and they require many kinds of data. Therefore, this study applied a Catchment-scale Soil Erosion model (C-SEM) to simulate discharge and sediment in the 3S Basin. The simulated results were judged with others references's data and the observed discharge of Strung Treng station, which is located in the mainstream and near the outlet of the 3S Basin. The results revealed that the 3S Basin distributes 31% of the Mekong River Basin's total discharge. In addition, the simulated sediment results at the 3S Basin's outlet also substantiated the importance of the 3S Basin to the Mekong River Basin. Furthermore, the results are also useful for the sustainable management practices in the 3S Basin, where the sediment data is unavailable.

Prediction of total sediment load: A case study of Wadi Arbaat in eastern Sudan

  • Aldrees, Ali;Bakheit, Abubakr Taha;Assilzadeh, Hamid
    • Smart Structures and Systems
    • /
    • v.26 no.6
    • /
    • pp.781-796
    • /
    • 2020
  • Prediction of total sediment load is essential in an extensive range of problems such as the design of the dead volume of dams, design of stable channels, sediment transport in the rivers, calculation of bridge piers degradation, prediction of sand and gravel mining effects on river-bed equilibrium, determination of the environmental impacts and dredging necessities. This paper is aimed to investigate and predict the total sediment load of the Wadi Arbaat in Eastern Sudan. The study was estimated the sediment load by separate total sediment load into bedload and Suspended Load (SL), independently. Although the sediment records are not sufficient to construct the discharge-sediment yield relationship and Sediment Rating Curve (SRC), the total sediment loads were predicted based on the discharge and Suspended Sediment Concentration (SSC). The turbidity data NTU in water quality has been used for prediction of the SSC in the estimation of suspended Sediment Yield (SY) transport of Wadi Arbaat. The sediment curves can be used for the estimation of the suspended SYs from the watershed area. The amount of information available for Khor Arbaat case study on sediment is poor data. However, the total sediment load is essential for the optimal control of the sediment transport on Khor Arbaat sediment and the protection of the dams on the upper gate area. The results show that the proposed model is found to be considered adequate to predict the total sediment load.