• Title/Summary/Keyword: Sediment control dam

Search Result 55, Processing Time 0.03 seconds

Effects of Control of Dam Sedimentation by a Hydraulic Structure in a Reservoir (저수지내 수리구조물에 의한 퇴사량 제어 효과)

  • Cho, Hong Je;Kang, Ho Seon
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.12
    • /
    • pp.1157-1167
    • /
    • 2013
  • Sayeon dam is the one that is structured in 1965 and supplying residential water in Ulsan. The hill located within the reservoir near the entrance of the dam spillway plays a role as a natural Dike. According to the recent surveys on change of sediment and effective volume of water kept in store, the latter that decreased 2.92% from twenty million tons and the former increased just 1.65 m. In this survey we examined the application of SED-2D model using measured data of Sayeon dam sediment. In addition we surveyed the inflow control and the water depth to be kept when installing small hydraulic structure similar to Dike around the dam reservoir entrance. To do this, we simulated the hydraulic effects and sediment on the conditions eliminating the hill or installing the structure higher than it. The controlling effects of present hill or adding small hydraulic structure on it was found, though the changes of the measure was not large.

Analysis of Soil Erosion and Sediment Yields at the Doam-dam Watershed considering Soil Properties from the Soil Reconditioned Agricultural Fields using SATEEC System (SATEEC 시스템을 이용한 객토 토양의 토성고려에 따른 도암댐 유역의 토양유실 및 유사량 분석)

  • Yoo, Dongsun;Ahn, Jaehun;Yoon, Jongsuk;Heo, Sunggu;Park, Younshik;Kim, Jonggun;Lim, Kyoung Jae;Kim, Ki-sung
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.4
    • /
    • pp.518-526
    • /
    • 2007
  • There have been serious soil erosion and water pollution problems caused by highland agriculture practices at Doam-dam watershed. Especially agricultural activities, chemical and organic fertilizer and pesticide applications, soil reconditioning to maintain soil fertility are known as primary causes of soil erosion and water qaulity degradation in the receiving water bodies. Among these, soil reconditioning can accelerate soil erosion rates. To develop soil erosion prevention practices, it is necessary to estimate the soil erosion from the watershed. Thus, the Universal Soil Loss Equation (USLE) model has been developed and utilized to assess soil erosion. However, the USLE model cannot be used at watershed scale because it does not consider sediment delivery ratio (SDR) for watershed application. For this reason, the Sediment Assessment Tool for Effective Erosion Control (SA TEEC) was developed to assess the sediment yield at any point in the watershed. The USLE-based SA TEEC system can estimate the SDR using area-based SDR and slope-based SDR module. In this study, the SATEEC system was used to estimate soil erosion and sediment yield at the Doam-dam watershed using the soil properties from reconditioned agricultural fields. Based on the soil sampling and analysis, the US LE K factor was calculated and used in the SA TEEC system to analyze the possible errors of previous USLE application studies using soil properties from the digital soil map, and compared with that using soil properties obtained in this study. The estimated soil erosion at the Doam-dam watershed without using soil properties obtained in the soil sampling and analysis is 1,791,400 ton/year (123 ton/ha/year), while the soil erosion amount is 2,429,900 ton/year (166.8 ton/ha/year) with the use of soil properties from the soil sampling and analysis. There is 35 % increase in estimated soil erosion and sediment yield with the use of soil properties from soil reconditioned agricultural fields. Since significant amount of soil erosion are known to be occurring from the agricultural fields, the soil erosion and sediment yield from only agricultural fields was assessed. The soil erosion rate is 45.9 ton/ha/year without considering soil properties from soil reconditioned agricultural fields, while 105.3 ton/ha/year after considering soil properties obtained in this study, increased in 129%. This study shows that it is very important to use correct soil properties to assess soil erosion and sediment yield simulation. It is recommended that further studies are needed to develop environment friendly soil reconditioning method should be developed and implemented to decrease the speed of soil erosion rates and water quality degradation.

Potential of River Bottom and Bank Erosion for River Restoration after Dam Slit in the Mountain Stream

  • Kang, Ji-Hyun;So, Kazama
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.46-46
    • /
    • 2011
  • Severe sediment erosion during floods occur disaster and economic losses, but general sediment erosion is basic mechanism to move sediment from upstream to downstream river. In addition, it is important process to change river form. Check dam, which is constructed in mountain stream, play a vital role such as control of sudden debris flow, but it has negative aspects to river ecosystem. Now a day, check dam of open type is an alternative plan to recover river biological diversity and ecosystem through sediment transport while maintaining the function of disaster control. The purpose of this paper is to verify sediment erosion progress of river bottom and bank as first step for river restoration after dam slit by cross-sectional shear stress and critical shear stress. Study area is upstream reach of slit check dam in mountain stream, named Wasada, in Japan. The check dam was slit with two passages in August, 2010. The transects were surveyed for four upstream cross-sections, 7.4 m, 34 m, 86 m, and 150 m distance from dam in October 2010. Sediment size was surveyed at river bottom and bank. Sediment of cobble size was found at the wetted bottom, and small size particles of sand to medium gravel composed river bank. Discharge was $2.5\;m^3/s$ and bottom slope was 0.027 m/m. Excess shear stress (${\tau}_{ex}$) was calculated for hydraulic erosion by subtracting the values of critical shear stress (${\tau}_{c}$) from the value of shear stress (${\tau}$) at river bottom and bank (${\tau}_{ex}=\tau-{\tau}_c$). Shear stress of river bottom (${\tau}_{bottom}$) was calculated using the cross-sectional shear stress, and bank shear stress (${\tau}_{bank}$) was calculated from the method of Flintham and Carling (1988). $${\tau}_{bank}={\tau}^*SF_{bank}((B+P_{bed})/(2^*P_{bank}))$$ where $SF_{bank}=1.77(P_{bed}/p_{bank}+1.5)^{-1.4}$, B is the water surface width, $P_{bed}$ and $P_{bank}$ are wetted parameter of the bed and bank. Estimated values for ${\tau}_{bottom}$ for a flow of $2.5\;m^3/s$ were lower as 25.0 (7.5 m cross-section), 25.7 (34 m), 21.3 (86 m) and 19.8 (150 m), in N/$m^2$, than critical shear stress (${\tau}_c=62.1\;N/m^2$) with cobble of 64 mm. The values were insufficient to erode cobble sediment. In contrast, even if the values of ${\tau}_{bank}$ were lower than the values for ${\tau}_{bottom}$ as 18.7 (7.5 m), 19.3 (34 m), 16.1 (86 m) and 14.7 (150 m), in N/$m^2$, excess shear stresses were calculated at the three cross-sections of 7.5 m, 34 m, and 86 m distances compare with ${\tau}_c$ is 15.5 N/$m^2$ of 16mm gravel. Bank shear stresses were sufficient for erosion of the medium gravel to sand. Therefore there is potential to erode lateral bank than downward erosion in a flow of $2.5\;m^3/s$. Undercutting of the wetted bank can causes bank scour or collapse, therefore this channel has potential to become wider at the same time. This research is about a potential of sediment erosion, and the result could not verify with real data. Therefore it need next step for verification. In addition an erosion mechanism for river restoration is not simple because discharge distribution is variable by snow-melting or rainy season, and a function for disaster control will recover by big precipitation event. Therefore it needs to consider the relationship between continuous discharge change and sediment erosion.

  • PDF

Evaluating Stability and Functionality of Hybrid Erosion Control Dam for Reducing Debris Flow Damage in Forested Catchment Nearby Urban Area (도시생활권의 토석류 피해 저감을 위한 복합형 사방댐의 안정성 및 기능성 평가)

  • Kim, Kidae;Kim, Dongyeob;Seo, Junpyo;Lee, Changwoo;Woo, Choongshik;Kang, Minjeng;Jeong, Sangseom;Lee, Dongkyun
    • Journal of Korean Society of Forest Science
    • /
    • v.107 no.1
    • /
    • pp.59-70
    • /
    • 2018
  • The objective of this study was to develop erosion control dam for preventing disaster in consideration of characteristics of forested catchment near urban area, and to assess its stability and functionality to see its practicability in the field. Two types of hybrid erosion control dams were developed including debris flow prevention dam by using pillar and float board screen type and debris flow control dam by using groyne. Also, review about their static (sliding, overturning, bearing capacity) and dynamic (member force) stability was carried out. According to the result, most of the assessed items met standard safety level although there were some cases where assessed items were short of stability criteria against impact. Also, after miniature flume experiments based on the developed erosion control dam to prove structure function (material catch, deposit), it turned out the dam decreased flow sediment amount and velocity while increasing sediment-capturing capacity by 3.5 times on average compared to the one controlled without erosion control dam. When function of erosion control dam for forested catchment near urban area is quantified based on future flume experiments in a variety of conditions, the dams can be practically used in the urban area, contribution to effectively reducing debris flow damage.

Change of Flood Characteristics in the Down Stream of Keum River after the Ken River Estuary Dam Construction (금강하구언 건설후 금강하류의 홍수흐름특성변화)

  • 박승기;문종필;민진우;김태철;안병기
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.41-46
    • /
    • 1998
  • The purpose of the study was changed of Flood Characteristics in Down stream of Keum River by the Keum River Estuary Dam Construction. The water surface slope of Kuem river after the Keum River Estuary Dam construction was steeper then before. The flood control capacity increase after construction. But, Increasing sediment in Kuem river will be decreased flesh reservoir volume for yield irrigation.

  • PDF

Development on Prediction Algorithm of Sediment Discharge by Debris Flow for Decision of Location and Scale of the Check Dam (사방댐 위치 및 규모 결정을 위한 토석류 토사유출량 예측 알고리즘 개발)

  • Kim, Kidae;Woo, Choongshik;Lee, Changwoo;Seo, Junpyo;Kang, Minjeng
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.586-593
    • /
    • 2020
  • Purpose: This study aims to develop an algorithm for predicting sediment discharge by debris flow, and develop GIS-based decision support system for optimal arrangement of check dam. Method: The average stream width and flow length were used to predict the cumulative sediment discharge by debris flow. At this time, the amount of slope failure on source area and average flow length were utilized as input factors. Result: The predicted sediment discharge calculated through the algorithm was 1.1 times different on average compared to the actual sediment discharge by debris flow. In addition, the program is an objective indicator that selects the location and size of the check dam, and it can help practitioners make rational decisions. Conclusion: The soil erosion control works are being implemented every year. Therefore, it is expected that the GIS-based decision support system for location and size of the check dam will contribute to the prevention of sediment-related disasters.

The Influence of Sediment Control Dam Dredging on Benthic Macroinvertebrate Communities of Mountain Stream (사방댐 준설이 저서성 대형무척추동물 군집에 미치는 영향)

  • Kim, Bong Sung;Lee, Chang Woo;Seo, Eul Won;Lee, Jong Eun
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.3
    • /
    • pp.454-460
    • /
    • 2012
  • This study was conducted for determining the influence of Sediment Control Dam dredging on benthic macroinvertebrate communities in mountain stream of Gyeongsangbuk-do. The sediment control dams were surveyed before and after dredging from mountain streams of Yecheon, Yeongju and Bonghwa in Northern part of Gyeongsangbuk-do. Sampling was taken at upper and down from 3 experimental sites and 2 control sites during May to August 2011. The identified species before dredging were 56 belonged to 31 families, 11 orders, 6 classes and 4 phyla, but after dredging it has decreased to 51 species belonged to 27 families, 10 orders, 5 classes and 4 phyla. The microhabitat damage of benthic macroinvertebrates occurred at experimental sites after dredging of sediment control dams led to reduction of the number of species and individuals. Especially, upper stream of experimental sites showed the reduction of an average of 38% species. In general, species diversity indices and species richness indices decreased after dredging; however, dominance indices increased at experimental sites. In the upper stream of experimental sites, the microhabitat damaged and became pool due to dredging. Also, velocity of flow decreased and the river bed became simply due to the sedimentary matter being finer than sand and silt. As a result, composition of functional feeding groups and functional feeding groups were relatively simpler at upper stream and the degree of community differences was greater between upper and down stream. Also, Chironomidae spp., Ephemeridae spp., and Gomphidae spp. to prefer where slow velocity of flow and lentic increased in a greater rate, and the EPT/C index to indicate the balance of the community decreased.

Suitable Site Prediction of Erosion Control Dam by Sediment (산지사면에 있어서 퇴사량에 의한 사방댐의 시공적지 예측)

  • Ma, Ho-Seop;Jeong, Won-Ok
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.3
    • /
    • pp.300-306
    • /
    • 2007
  • This study was carried out to analyze the characteristics of forest environmental and stream morphological factors by using the quantification theory (I) for prediction of the suitable dam site. The results obtained from this study were summarized as follows; The selection of suitable site for erosion control dam was estimated by normalized score of each category. And the prediction method of suitable site for erosion control dam divided into class I (Very suitable site), II (Suitable site), and III (Poor suitable site) for the convenience of use. In conclusion, if we select the suitable site for construction of erosion control dam for disaster prevention, we could save the loss of tremendous budget, avoid the poor suitable site due to subjective judgment, and it would promote the functions of erosion control dam.

A Study on the Safety Inspection of Erosion Control Facilities (I): In Case of Check Dams Located in the Gangwon Region (사방시설의 안전점검에 관한 연구(I) - 강원지역의 사방댐 점검결과를 중심으로 -)

  • Lee, Jin-Ho;Chun, Kun-Woo;Lee, Sang-Myung;Park, Ju-Hwan;Kim, Bong-Ki;Kim, Suk-Woo;Seo, Jung Il
    • Journal of Forest and Environmental Science
    • /
    • v.29 no.3
    • /
    • pp.226-236
    • /
    • 2013
  • Recently check dam construction number have been increased by becoming known that effectiveness in the control of the landslide and debris flow. However, check dam management standards are not setting yet. Therefore, this study was carried by provide a basic data for the check dam management and inspection in the Gangwondo. The followings are the results of safety inspection on the 274 check dams, which are located in mountain streams, Gangwondo, Republic of Korea. 1. It was determined that, of 274 check dams inspected, 267 check dams (97.4%) generally had a safe condition but 7 check dams (2.6%) had a bad condition that repair and/or complementary measures are required. 2. The check dams with a bad condition had the ages greater than approximately 20 years. This result should be reflected to future stream management strategy including a timing of the specific inspection for durability of check dams. 3. Our finding suggests that the safety inspection of check dams is able to provide basic information required to maintain their own functions, and thus it should be widely applied to stream management strategy against to sediment-related disasters in the future.