DOI QR코드

DOI QR Code

A Study on the Safety Inspection of Erosion Control Facilities (I): In Case of Check Dams Located in the Gangwon Region

사방시설의 안전점검에 관한 연구(I) - 강원지역의 사방댐 점검결과를 중심으로 -

  • Lee, Jin-Ho (Gangwon Branch of Korean Association of Soil and Water Conservation) ;
  • Chun, Kun-Woo (Department of Forest Resources, College of Forest and Environmental Sciences, Kangwon National University) ;
  • Lee, Sang-Myung (Gangwon Branch of Korean Association of Soil and Water Conservation) ;
  • Park, Ju-Hwan (Gangwon Branch of Korean Association of Soil and Water Conservation) ;
  • Kim, Bong-Ki (Gangwon Branch of Korean Association of Soil and Water Conservation) ;
  • Kim, Suk-Woo (Department of Forest Resources, College of Forest and Environmental Sciences, Kangwon National University) ;
  • Seo, Jung Il (Department of Forest Resources, College of Forest and Environmental Sciences, Kangwon National University)
  • 이진호 ((특)사방협회 강원지부) ;
  • 전근우 (강원대학교 산림환경과학대학 산림자원학과) ;
  • 이상명 ((특)사방협회 강원지부) ;
  • 박주환 ((특)사방협회 강원지부) ;
  • 김봉기 ((특)사방협회 강원지부) ;
  • 김석우 (강원대학교 산림환경과학대학 산림자원학과) ;
  • 서정일 (강원대학교 산림환경과학대학 산림자원학과)
  • Received : 2013.07.04
  • Accepted : 2013.08.06
  • Published : 2013.08.31

Abstract

Recently check dam construction number have been increased by becoming known that effectiveness in the control of the landslide and debris flow. However, check dam management standards are not setting yet. Therefore, this study was carried by provide a basic data for the check dam management and inspection in the Gangwondo. The followings are the results of safety inspection on the 274 check dams, which are located in mountain streams, Gangwondo, Republic of Korea. 1. It was determined that, of 274 check dams inspected, 267 check dams (97.4%) generally had a safe condition but 7 check dams (2.6%) had a bad condition that repair and/or complementary measures are required. 2. The check dams with a bad condition had the ages greater than approximately 20 years. This result should be reflected to future stream management strategy including a timing of the specific inspection for durability of check dams. 3. Our finding suggests that the safety inspection of check dams is able to provide basic information required to maintain their own functions, and thus it should be widely applied to stream management strategy against to sediment-related disasters in the future.

Keywords

References

  1. Korea Forest Service. 2008. Commissioning Process Guidelines of Erosion Control Facilities Inspection and Feasibility Assessment of Erosion Control Works. pp 25.
  2. Korea Forest Service. 2012a. 2012-2017 Master Plan of Erosion Control Works. pp 44.
  3. Korea Forest Service. 2012b. 2012 Comprehensive Plan for Prevention of Landslides. pp 44.
  4. Korea Forest Service. 2013. National Landslide Prevention Measures by Year. pp 37.
  5. Kim MS, Chun KW, Jang SK, Kim YS, Ryu YH. 2008. The example of erosion control dam construction for control of woody debris and debris flow in Kangwon Prefecture. Proceedings of the 2008 Summer Meeting of the Korean Forest Society: 337-338. (in Korean)
  6. Kim MS, Lee SH. 2010. domestic trend of erosion control measure techniques: in case of torrent erosion control structures. Journal of Mine Reclamation Technology 4: 107-120. (in Korean)
  7. Kim MS, Lee SH. 2011. A study on the characteristics of the landslide in urban forests. Journal of Korea Society of Forest Engineering and Technology 9: 174-183. (in Korean)