• Title/Summary/Keyword: Sediment Volume

Search Result 149, Processing Time 0.024 seconds

Study on the Bed-Materials movement and Sedimentation. (유사운동과 유사량에 관한 연구)

  • 홍승만
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.1
    • /
    • pp.4052-4063
    • /
    • 1976
  • The observation and Studies on the two stations in the Ansung river are included that were justified types of Bed-materials movement and were estimated loads volume of sediment applied by sediment rating curve and/or drivel formulars according to both stream conditions. The results of evaluation for above purpose are given as follows 1) Drived formulas for sediment computation in accordance with river situations are given as follows. -Suspended load Yu-chun Ts=135H4.55 Hye-hwa Ts=454H3.71 -Bed load Yu-chun Tb=75.4H191 Hye-hwa Tb=134.5H1.82 2) Annual volume of surface erosion in the catchment area were obtained at yu-chun of 0.236mm Hye-hwa of 0.200mm and mean depth of 0.22mm 3) The Bed-materials movement with water depth were represented that ripple is bellow than 0.067 meter at yu-chun and bellow than 0.096 meter at Hye-hwa stream, Dunes is 0.067-0.22 at yu-chun and 0.096-0.23 at Hye-hwa, Transition is 0.22-0.46 at yu-chun and 0.23-0.58 at Hye-hwa and Antidunes is higher than 0.46 at yu-chun and 0.58 of water depth at Hye-hwa stream

  • PDF

A Study on Estimate of Sediment Yield Using Tank Model in Oship River Mouth of East Coast (Tank 모형을 이용한 동해안 오십천 하구의 유사량 평가에 관한 연구)

  • Kang, Sank-Hyeok;Ok, Yong-Sik;Kim, Sang-Ryul;Ji, Jeong-Hwan
    • Korean Journal of Environmental Agriculture
    • /
    • v.30 no.3
    • /
    • pp.268-274
    • /
    • 2011
  • BACKGROUND: A large scale of sediment load delivered from watershed causes substantial waterway damages and water quality degradation. Controlling sediment loading requires the knowledge of the soil erosion and sedimentation. The various factors such as watershed size, slope, climate, land use may affect sediment delivery processes. Traditionally sediment delivery ratio prediction equations have been developed by relating watershed characteristics to measured sediment yield divided by predicted gross erosion. However, sediment prediction equations have been developed for only a few regions because of limited sediment data. Besides, little research has been done on the prediction of sediment delivery ratio for asia monsoon period in mountainous watershed. METHODS AND RESULTS: In this study Tank model was expanded and applied for estimating sediment yield to Oship River of east coast. The rainfall-runoff in 2006 was verified using the Tank model and we derived good result between observed and calculated discharge in 2009 at the same conditions. In relation to sediment yield, the sediment delivery rate of 2006 was very high than 2009 regardless of methods for estimating sediment load. It was thought to be affected by heavy rainfall due to the typhoon. CONCLUSION(s): For estimating sediment volume from watershed, long-term monitoring data on discharge and sediment is needed. This model will be able to apply to predict discharge and sediment yield simultaneously in ungauged area. This approach is more effective and less expensive method than the traditional method which needs a lot of data collection.

Solid-liquid Separation of Swine Wastewater using Bentonite (벤토나이트를 이용한 양돈 폐수의 고액분리)

  • Yim, Je-Hyun;Kang, Seon-Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.6
    • /
    • pp.742-747
    • /
    • 2004
  • Solid-liquid separation of swine wastewater was conducted using bentonite as coagulant. During the separation experiment, coagulation efficiency was also investigated. To determine optimal bentonite dose, 0.1, 0.2, 0.4, 0.8, and 1.6% (w/v basis) of bentonite was dosed. Suspended solid removal efficiency was 87-98% at whole bentonite dosage. But sediment volume was increased, and settling velocity was decreased at excessive bentonite dosage. Therefore optimal bentonite dosage was evaluated around 0.2-0.4%. In the test to determine optimal pH, coagulation using bentonite was performed at pH 3, 4, 5, 6, and 7. At lower pH suspended solid removal efficiency was increased. However, sediment volume was also increased and phosphorus release was observed. Thereby optimal pH for bentonite coagulation might be appeared in the range of 6-7.

Estimation of the thickness of floating silty clay sediment using dual frequency single beam echo sound system (이중 주파수 에코 사운드 시스템을 이용한 부니층 두께 조사)

  • Ha, Hee-Sang
    • Journal of the Korean Geophysical Society
    • /
    • v.5 no.3
    • /
    • pp.219-231
    • /
    • 2002
  • Single beam echo sounding was used to delineate bathymetry sea bottom in the area of hydrography and marine navigation. This research was aimed at measuring the thickness of floating silty clay sediment with dual frequencies echo sounding system. There occur discrepancies in penetrating depth through sea beds between high frequency(200 KHz) and low(33 KHz) frequency. RI density logging was employed to characterize the floating silty clay sediment of Guangyang bay, which was chosen to investigate the proposed site for reclamation field. The volume of floating silty clay sediment was used to design by estimating size of reclamation site. The estimation strategies developed in this study will be readily applicable to measure the Pattern of sedimentation via regular hydrographic survey in the future.

  • PDF

Calculation of Sediment Volume of the Agriculture Reservoir Using DGPS Echo-Sounder (DGPS 음향 측심기를 이용한 농업용 저수지의 퇴적량 산정)

  • Park Seung-Ki;Jeong Jae- Hoon
    • Spatial Information Research
    • /
    • v.13 no.3 s.34
    • /
    • pp.297-307
    • /
    • 2005
  • This study was performed to get the basic data for the dredging project and logical maintenance of the Yaedang reservoir. The survey of reservoir capacity for calculation of sediment volume carried out using DGPS Echo-Sounder during November $25\~30$ in 2004. The latitude and longitude signal from GPS satellite was received a second interval with the UTM coordinate system. Water depth was measured 0.2 second interval by Echo-sounder sensor in MIDAS Surveyor. The UTM coordinate datum were transformed into standard coordinate datum of Korean(TM coordinate datum) using Arc Info System. Mapping of contour was used Sufer, Arc View and Auto CAB Program Storage capacity of Yaedang reservoir was estimated by average contour area method. Result of this time investigation for useful storage determination of Yaedang reservoir was showed 4,601.585 ha-m and was differenced less 5.425ha-m the bygones useful storage.

  • PDF

Prediction MOdels for Channel Bed Evolution Due to Short Term Floods (단기간의 홍수에 의한 하상변동의 예측모형)

  • Pyo, Yeong-Pyeong;Sin, Cheol-Sik;Bae, Yeol-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.6
    • /
    • pp.597-610
    • /
    • 1997
  • One-dimensional numerical models using finite difference methods for unsteady sediment transport on alluvial river channel are developed. The Preissmann implicit scheme and the Lax-Wendroff two-step explicit scheme with the Method of Characteristics for water motion and a forward time centered space explicit scheme for sediment motion are developed to simulate the sediment transport rate and the variation of channel bed level. The program correctness of each model is successfully verified using volume conservation tests. The sensitivity studies show that higher peak stage level, steeper channel slope and longer flooding duration produce more channel bed erosion. and median grain size, $D_{50}=0.4mm$ give maximum volume loss in this study. Finally, the numerical models are found to produce reasonable results from the various sensitivity tests which reveal that the numerical models have properly responded to the changes of each model parameter.

  • PDF

Depth Averaged Numerical Model for Sediment Transport by Transcritical Flows (급변류에 의한 하상변동 예측을 위한 수심적분 수치모형)

  • Kim, Boram;Kim, Dae-Hong
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.11
    • /
    • pp.1061-1066
    • /
    • 2014
  • A stable second-order finite volume method was proposed to predict sediment transport under rapidly varied flow conditions such as transcritical flow. For the use under unsteady flow conditions, a sediment transport model was coupled with shallow water equations. HLLC approximate Riemann solver based on a monotone upstream-centered schemes for conservation laws (MUSCL) reconstruction was used for the computation of the flux terms. From the comparisons of dam break flow experiments on erodible beds in one- and two-dimensional channels, good agreements were obtained when proper parameters were provided. Lastly, dam surface erosion problem by overtopped water was simulated. Overall, the numerical solutions showed reasonable results, which demonstrated that the proposed numerical scheme could provide stable and physical results in the cases of subcritical and supercritical flow conditions.

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF

Surface Cover Application for Reduction of Runoff and Sediment Discharge from Sloping Fields (경사지 밭에서 발생하는 토양유실 저감을 위한 피복재 적용)

  • Shin, Min-Hwan;Won, Chul-Hee;Park, Woon-Ji;Choi, Young-Hun;Shin, Jae-Young;Lim, Kyoung-Jae;Choi, Joong-Dae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.6
    • /
    • pp.129-136
    • /
    • 2011
  • To measure effects of surface cover on runoff and sediment discharge reduction using rainfall simulator, four(5 m${\times}$30 m scale) plot experiments were conducted in this study. Surface covers made with straw mat, Polyacrylamide (PAM), chaff, and sawdust were simulated 4 times under 31.1~44.4 mm/hr rainfall intensities. Compared with results from control plot, the time of runoff generation is delayed and outflow volume decreased with surface cover. Effects on runoff reduction of straw mat, PAM, sawdust and chaff ranged 4.7~81.5 % and runoff rate reduced by 6.5~76.1 % respectively, when compared with those from control plot. The percentage of decrease in sediment discharge were 99.7~99.8 % from straw mat+sawdust+PAM plots, 85.9~95.6 % from straw mat+PAM plots, and 98.5~99.4 % from straw mat+chaff+PAM plots. The runoff, sediment discharge, and SS concentration reduction efficiencies of the cover materials were outstanding when compared to control plot. It was analyzed that reduction of runoff and sediment discharge were mainly contributed by decrease in rainfall energy impact and flow velocity and increase of infiltration due to the surface cover materials. The results could be used as a base for the development of best management practices (BMPs) to reduce runoff, sediment discharge from sloping field.

Construction and Monitoring of Test bed in Urban Sediment Disaster Prevention Technology (도심지 토사재해 방어기술 테스트베드 구축 및 모니터링 연구)

  • Lee, Jung-min;Kim, Hyo-Jin;Lee, Yoon-Sang;Jin, Kyu-Nam
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.161-169
    • /
    • 2017
  • In this study, sediment transfer and precipitation analysis of the test bed watershed was conducted through the model for the application and practical use of the urban sediment disaster prevention technology, and used this as an aid to design to secure reliability. In addition, conducted the test bed monitoring with the defense technology, analyzed the effect, and established the maintenance plan. Analyzed the change of soil deposition volume through arbitrary slope adjustment for the currently installed stormwater conduit of the test bed watershed. As a result, it is important to reduce the total sedimentation amount in the adjustment of the slope of the entire pipeline, but it is important that the sedimentation depth of each sediment does not rise to such a degree as to threaten the performance of the pipeline. Considering these matters, it is necessary to design the pipeline to prevent the clogging of the soil from the viewpoint of the reliability of the entire pipeline. The sediment disaster defense technology test bed is divided into a new city and an old city, and old city test bed is under construction. The result obtained through the monitoring of the test bed in the new city, sediment disasters such as debris can delay the time to reach the downtown area, and it is possible to secure the golden time, such as evacuation and rescue through the warning system. Also, the maintenance of the test bed application was suggested. Continuous and systematic monitoring is required for securing the reliability of element technology and successful commercialization.