Hybrid rotor position estimation methods that integrate a fundamental model and high frequency (HF) signal injection are widely used for the wide speed-range sensorless control of interior permanent-magnet synchronous machines (IPMSMs). However, the direct transition of two different schemes may lead to system fluctuations or system instability since two estimated rotor positions based on two different schemes are always unequal due to the effects of parameter variations, system delays and inverter nonlinearities. In order to avoid these problems, a seamless transition strategy to define and construct a virtual q-axis inductance is proposed in this paper. With the proposed seamless transition strategy, an estimated rotor position based on a fundamental model is forced to track that based on HF signal injection before the transition by adjusting the constructed virtual q-axis inductance. Meanwhile, considering that the virtual q-axis inductance changes with rotor position estimation errors, a new observer with a two-phase phase-locked loop (TP-PLL) is developed to accurately obtain the virtual q-axis inductance online. Furthermore, IPMSM sensorless control with maximum torque per ampere (MTPA) operations can be tracked automatically by selecting the proper virtual q-axis inductance. Finally, experimental results obtained from an IPMSM demonstrate the feasibility of the proposed seamless transition strategy.
The Transactions of the Korean Institute of Power Electronics
/
v.21
no.4
/
pp.364-372
/
2016
In this paper, a voltage controller for the seamless transition of a grid-connected inverter for ESS is proposed. The single-phase inverter is operated as a current controller when the grid is connected and as a voltage controller in the stand-alone mode when the grid is disconnected. Generally, in the case of grid recovery, the overcurrent may flow into the system because of the mismatch phase between the inverter output and grid voltages. The proposed controller resolves the overcurrent problem through phase delay problems with initial value feed-forward control of the integrator when the grid voltage is restored. The effects of the control method are simulated through PSIM, and the usefulness of the control method is verified through experiments.
The Transactions of the Korean Institute of Power Electronics
/
v.25
no.5
/
pp.333-342
/
2020
Power exchanges between the grid and the battery through a bidirectional DC-DC converter are essential for DC microgrid systems. In general, the battery is charged when the grid is connected, and the system is powered by the battery when the grid is disconnected. In this mode transition, the saturation of the voltage controller slows down output response and produces large transient errors in DC link voltage. To solve this problem, a novel anti-windup design is proposed to improve anti-windup performance further. The proposed method stabilizes DC bus voltage through a wider range of battery voltage with faster transition compared with that of conventional methods. The proposed method is verified through an experimental setup composed of a 125 W laboratory-scale DC microgrid system.
In 3GPP2 standard, MIP is used and a PDSN performs the function of FA to support macro mobility. When a MS is roaming from a PDSN area to another, the mobility supported is called macro mobility, while it is called micro mobility when a MS is roaming from a RN area to another in a PDSN area. Since a PDSN performs the function of FA in 3GPP2 standard, it is possible to support mobility but its mechanism is actually for supporting macro mobility, not for micro mobility, thus it is weak in processing fast and seamless handoff to support micro mobility. In this paper, we suggest the seamless handoff algorithm barred on multicast group mechanism to support micro mobility. Depending on the moving direction and velocity of a MS, the suggested algorithm constructs a multicast group of RNs on the forecasted MS's moving path, and maximally delays RNs'joining to a multicast group to increase the network efficiency. Moreover, to resolve the buffer overhead problem of the existent multicast scheme, the algorithm suggests that each RN buffers data only after the forecasted handoff time. To prove deadlock freeness and liveness of the algorithm. we use state transition diagrams, a Petri-net modeling and its reachability tree. Then, we evaluate the performance by simulation.
Line-interactive uninterruptible power supply (UPS) systems are good candidates for providing energy storage within a microgrid. In this paper, a control scheme for a line-interactive UPS system applied in a low-voltage microgrid is presented. It is based on the Q-w and P-E droop control to achieve a seamless transition between grid-connected and stand-alone operation modes. Moreover, a new model for designing the controllers is built in the dq-frame based on the instantaneous power definition. The new-built model takes into account the dynamic performance of the output impedance of the inverter in the dq-frame and can be evaluated in the time domain. Compared to the traditional model based on the instantaneous power definition, the new-built model is more accurate to describe the dynamic performance of the system. Simulation and experimental results obtained with a microgrid consisting of two 40-kW line-interactive UPS systems are given to validate the control strategy of the line-active UPS system and the accuracy of the new-built model.
Park, Sung-Youl;Kim, Joo-Ha;Jung, Ah-Jin;Choi, Se-Wan
The Transactions of the Korean Institute of Power Electronics
/
v.21
no.3
/
pp.200-206
/
2016
In the microgrid, inverters for energy storage system are generally constructed in a parallel structure because of capacity expandability, convenience of system maintenance, and reliability improvement. Parallel inverters are required to provide stable voltage to the critical load in PCC and to accurately share the current between each inverter. Furthermore, when islanding occurs, the inverters should change its operating mode from grid-connected mode to stand-alone mode. However, during clearing time and control mode change, the conventional control method has a negative impact on the critical load, that is, severe fluctuating voltage. In this study, a parallel operation control method is proposed. This method provides seamless mode transfer for the entire transition period, including clearing time and control mode change, and has accurate current sharing between each inverter. The proposed control method is validated through simulation and experiment.
This study presents a strategy using the synchronized output regulation method (SOR) for controlling inverters operating in stand-alone and grid-connected modes. From the view point of networked dynamic systems, SOR involves nodes with outputs that are synchronized but also display a desirable wave shape. Under the SOR strategy, the inverter and grid are treated as two nodes that comprise a simple network. These two nodes work independently under the stand-alone mode. An intermediate mode, here is named the synchronization mode, is emphasized because the transition from the stand-alone mode to the grid-connected mode can be dealt as a standard SOR problem. In the grid-connected mode, the inverter operates in an independent way, in which the voltage reference changes for generalized synchronization where its output current satisfies the required power injection. Such a relatively independent design leads to a seamless transfer between operation modes. The closed-loop system is analyzed in the state space on the basis of the output regulation theory, which improves the robustness of the design. Simulations and experiments are performed to verify the proposed control strategy.
3GPP2 방식에서는 Macro Mobility 지원을 위하여 MIP를 이용하며 PDSN은 FA의 기능을 수행한다. 이때 하나의 PDSN에서 다른 PDSN으로 MS가 이동할 경우 지원되는 이동성을 Macro Mobility라 하며, POSN 관리 영역 내의 하나의 RN에서 다른 RN으로 이동시에 지원되는 이동성을 Micro Mobility라 한다. 본 논문은 Micro Mobility를 지원하기 위한 멀티캐스트 그룹 메커니즘 기반의 Seamless 핸드오프 알고리즘을 제안하고 있다. 제안된 알고리즘은 MS의 이동방향과 속도를 계산하여, 예상 이동경로에 인접한 RN들을 멀티캐스트 그룹으로 구성하고, 그룹 조인 시점을 최대한 늦춤으로서 망의 효율성을 높인다. 또한, 기존의 멀티캐스트 연결 방법이 가지고 있는 버퍼 오버헤드에 대한 문제점을 해결하기 위해, PDSN은 예상 핸드오프 시간 이후의 데이터만을 전송하며, RN 또한 예상 핸드오프 시간 이후의 데이터만을 버퍼링 한다. 제안된 알고리즘의 Dead Lock Free, Liveness 및 Reliability를 검증하기 위해 State Transition Diagram을 작성하고, 페트리 네트를 이용하였다.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.55
no.4
/
pp.224-230
/
2006
The conventional way to implement a bidirectional converter with boost/buck has been to use two general purpose PWM ICs with a single supply voltage. In this case, when one direction mode is in operation, the other is disabled and the output of the error amplifier of the disabled IC may be saturated to a maximum value or zero. Therefore, during mode transition, a circuit which can disable the switching operation for a certain time interval is required making it impossible to get a seamless transition. In this paper, the limitations of the conventional 42V/14V bi-directional DC/DC converter implemented with general current mode PWM ICs with a single supply voltage are reviewed and a new current mode PWM controller circuit with a dual voltage system is proposed. The validity of the proposed circuit is investigated through simulation. and experiments.
Journal of Electrical Engineering and information Science
/
v.3
no.2
/
pp.139-144
/
1998
This paper describes the design of a variable rate QPSK demodulator for digital satellite TV system. This true variable-rate demodulator employs a unique architecture to realize an all digital synchronization and detection algorithm. Data-flow based design approach enabled a seamless transition from high level design optimization to physical layout. The demodulator has been integrated with Viterbi decoder, de-interleaver, and Ree-Solomon decoder to make a single chip Digital Video Broadcast (DVB) receiver. The receiver IC has been fabricated with a 0.5mm CMOS TLM process and proved fully functional in a real-world set-up.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.