Numerical Evaluation of Tidal Characteristic Changes after Saemangeum Sea-dike Closing (수치모형(數値模形)을 이용(利用)한 새만금 방조제(防潮堤) 축조후(築造後)의 조석(潮汐) 운동(運動) 예측(豫測))

  • Park, Chang-Kyu;Lee, Nam-Ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.1 s.13
    • /
    • pp.61-76
    • /
    • 2001
  • During the performance of large scale tidal land reclamation project along the coast line, the construction of large scale structures such as sea-dikes, closing estuaries will induce big changes of near-shore hydraulic behavior. In this paper, its is aimed to verify the change of tide and currents after the construction of sea-dike of the Saemangeum project along the coast line. Numerical scale model "TRISULA" which development by Delft Hydraulics in the Netherlands was used. "TRISULA" is adopting the finite difference numerical scheme, and mostly using for hydro-dynamic solution along the sea and estuaries. Model boundary is covering $100{\times}170$ Km and constructed with $133{\times}337$ grids. Outer side boundary is divided 48 sections, and input 37 tidal components are gained from another big scale numerical "Yellow Sea" model. Model calibrations & verifications were performed th field tide & current datas which were measured along sea-dike alignment during Aug. $1997{\sim}Apr$. 1999. And then, numerical simulation with the tide condition dated 17 Apr. 1999 was performed with & without sea-dike construction condition for the comparison. Evaluated boundary is 20 km out-side from sea-dike alignment. Four cross lanes were set up, each of lane contains 3 points, for the comparison of sea-dike construction effects. Results showing the tidal amplitude is reducing approximately 20 cm after the construction of sea-dike during spring tide condition, amplitude 6.9m. Currents after construction of sea-dikes along the alignment, the northern part shows 50%(inner), 90%(outer) and the southern part shows 10%(inner) 50%(outer) of the currents before construction.

  • PDF

Risk Based Decision Support for Final Closing Section of a Sea Dike

  • Jee, Sung Hyun;Kang, Seong Hae;Kim, Jeong Hwan;Seo, Jong Won
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.49-57
    • /
    • 2013
  • A sea dike construction has been increased in Korea because of the actively deployed reclamation project in basis of efficient application in land. The degree of completion in sea dike construction is affected by final closing construction, which has a lot of uncertainty that often results in higher accidents rate. Therefore, this research identified risk factors of final closing construction and classified them. This research examines the likelihood and its impact for each risk factor and calculates the risk degree as to the risk matrix. Based on this, the impact and the environmental conditions that affect to risk factors are investigated and further responsive methods are established for each risk factor. Ultimately, this research attempts to provide the risk retrenchment method for inspectors by proposing risk estimation model, responsive action list, and risk management process.

Time Dependent Morphological Changes around the Closure Gap in Saemankeum (새만금 방조제 물막이 구간 주변에서의 지형변화예측(수공))

  • 박영욱;어대수;박상현
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.365-370
    • /
    • 2000
  • Sea dike construction for the tidal flat reclamation works in estuary and coast may change the characteristics of tidal motion and wave conditions in the region. In turn, a new hydraulic condition provides the impacts on sediment transport pattern and forms a new morphological environment. Also, morphological changes during the closure works of sea dike are closely related with a safy of sea dike. Therefore, the prediction of morphological changes is required secure the safe closure work and the economic design of sea dikes. To investigate morphological changes due to sea dike construction, hydrodynamic changes of tides and waves have to be evaluated, then sediment transport and sea bottom changes are computed. Mathematical modelling is required for representation of interrelation of tidal motion, wave and sediment transport. In this study, numerical model MORSYS is applied to compute the hydrodynamics and morphological changes around the closure gap for Saemankuem dike. This model allows a flexible integration of the module for waves, currents, sediment transport and bottom changes.

  • PDF

Mitigation for the anti-function in caused by Saemangeum reclamation (새만금간척에 따른 미티게이션)

  • 신문섭
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.169-174
    • /
    • 1999
  • The reclamation area of Saemangeum (Kunsan) located between 126$^{\circ}$10' -126$^{\circ}$50'E and and 35$^{\circ}$35'N -36$^{\circ}$05'N at the western coast of Korea. The construction of the 33km sea dike is building in the Saemangeum area. When the construction of the sea dike in the coastal region takes plase, there exists a certain amount of soil which is diffused by the tidal current. Behavior of the soil diffusion usually depends on its intrinsic characteristics, bathymetry, construction method and used mchinery. The amount of soil at the construction acts as a pollutant which is the cause of changing the marine environment. When the soil material is diffused , it may form a layer which obstructs the light passing into the sea and causes the extinction or alteration of the living beings on the sea bottom. The settlement of soil material could change the sea bottom deposit. The purpose of MITIGATION is to harmonize the development and the conservation of environment, to restrict environmental destruction and to reproduce the enviroment damaged by the construction in the coastal region. The purpose of this study is to find the method by which we minimize the anti-function of development in the coastal region. Tide and tidal current are calculated using a two-dimensional numerical model before the construction of sea dike in Saemangeum Bay. The numerical results are compared well with field observations. On the basis of these results, we caculated the tide and tidal current after the construction of the sea dike in order to investigate the change of the tide and tidal current after the construction of the sea dike. Moreover, we calculated the tide and tidal current after the construction of submerged breakwater in order to preserve the enviornmental condition of creature habitat . We compared the tide and tidal current before and after the construction of submerbed breakwater, to investigate the possbility of MITIGATION in the fisheries.

  • PDF

A Study of sea Dike meterials loss due to Scouring and Consolidation Settlement During the Periond of Construction on Construction on the West Cost of Korea (서해암 방조제 공사 기간중 유실토량 측정시험)

  • 안재숙
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.14 no.1
    • /
    • pp.2503-2519
    • /
    • 1972
  • The studies were carried out to find the cause and the quantitative evaluation of sea dike materials loss which is occured during the period of construction works for the tideland reclamation projects on the west coast of Korea. Major subjects to studies were to establish the typical relationships between the tidal flow and the movement of dike materials, the tidal-flow and the erosion, the dike materials and the ratio of material movement(losses), construction methods and the ratio of materials movement (losses). Based on the above subjects, the studies were made for the purpose of obtain the following informations; (1) Collecting and evaluaing the data of dike material losses due to foundation settlement, from designed existing dikes on the west coast. (2) By the field investigation at A-San Sea Dike, Pyong Taek Project, the Comparison would be made by the relationships between the tide velocity and the movement of dike foundation under the natural conditions and the period of construction so that find out the relationship between the dike materials of foundation situation and settlements. With regard to the dike construction works, it is so difficult to calculate the exact quantity of material losses due to the foundation settlements. The major factors that affect the settlement losses of the dike materials are: (1) Topographical variation (2) Swepting the sectional area of dike by the tide velocity. (3) Dumping riprap to the outerside of dike during the period of construction works. (4) Sectional area losses by the cause of occurence of the new tide channels. (5) material losses by the heavy storms. (6) Consolidation settlement by the foundation weakness. (7) Material losses by the earth materials by tide flow. Most hi호 material losses were occured by the Consolidation settlement due to the foundation weakness, the maximum tide velocities due to decrease the cross sectional area of the gaps and erosion of foundation due to the range of tide, Inner and outerside of dike, or dike material loses due to the tide flow. Final conclusion would be obtained by the continuous measurement of consolidation settlement at the stage of final clusure of the dike. (It is scheduled to close on the end of 1972) However, intermediate conclusion can be introduced as follows: (1) The estimation of material(losses) during the period of construction works for the existing sea-dikes up to date were only empirical. The material losses at the general closure for design was estimated at 10% of the riprap, 20% of the earth materials, and 20% of the riprap, 40% of the earth materials at the final closure of the dike. The final closure estimated double quantity to the general closure, but it is still doubt. (2) The ratio of consolidation settlements was found smaller than the calculated quantity. It can be foreseen that settlement speeds is higher thom the calculated speeds. (3) The movement of dike foundation under the natural conditions were not so depends on the geological conditions of the foundation. (4) When the tide velocities was estimated 100 at the normal tide, it was estimated 125 at the high tide and 55 at the low tide. The tide velocities at the low tide shows apparently lower than the high tide and the higher velocities at the deep water depth.

  • PDF

Water Quality of Sukmoon Lake Developed by Sea-Dike Construction (석문지구 간척지 담수호 수질변화)

  • 윤광식;인순한
    • Proceedings of the Korean Society of Rural Planning Conference
    • /
    • 1998.10a
    • /
    • pp.16-18
    • /
    • 1998
  • Fresh water lake was developed as a result of tidal land reclamation of the Sukmoon area. Water quality of lake has been monitored before and after sea-dike construction. Water quality degradation has been observed after Sukmoon sea-dike construction. In this paper observed water quality of the Sukmoon lake is presented and possible measures to improve water quality are also discussed.

  • PDF

The changes of hydraulic environment caused by construction of Saemankeum dike (새만금방조제 축조에 따른 수리환경 변화)

  • Park, Young-Jin;Park, Chang-Kyoo;Kwun, Soon-Kuk
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.306-309
    • /
    • 2001
  • The objective of this study is to evaluate the changes of hydraulic environment after the construction of Saemangeum sea-dikes. Numerical simulation on the tidal condition of dated 17 Apr. 1999 is performed with and without sea-dike construction status for the comparison. Results show the tidal amplitude is reducing approximately 20 cm after the construction of sea-dike during spring tide condition of 6.9 m amplitude. Currents after construction of sea-dikes along the alignment, the northern part shows 50% (inner), 90% (outer) and the southern part shows 10% (inner), 50% (outer) of the current before construction.

  • PDF

An experimental study on the Ground deformation caused by sea-dike construction (방조제 축조에 따른 지반의 변형에 관한 실험연구)

  • 김성필
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.5
    • /
    • pp.78-83
    • /
    • 2000
  • When a sea-dike is constructed on soft soils, it is much difficult to calculate ground deformation caused by forced displacements. In this study , a series of laboratory model tests have been performed to investigate the ground deformation under a constructed sea-dike on soft soils. Construction sequence of sea-dike embankment was assumed such as constructed by quarry first and followed by soils adjacent to quarry embankment. as test data and displacement in subsoils have been analyzed, it seems that deformation is caused by general shear failure. the shape of ground deformation caused by forced displacements was well defined be parabola . Upon comparing profiles and depth of forced displacement from the model test to those based on stress-baring capacity method commonly used, it has been found that deformation prediction using stress-bearing capacity method was not exact at the edge of loading.

  • PDF

Estimation of Areal Change in Hwa-ong Tidal Flat due to Sea Dike Construction Project using Multi-temporal Landsat TM Images (다중시기 Landsat TM 영상을 이용한 화옹지구의 간척사업에 따른 갯벌면적의 변화 추정)

  • Kim Seong-Joon;Bang Ro-Sung;Kwon Hyung-Joong
    • KCID journal
    • /
    • v.10 no.1
    • /
    • pp.73-79
    • /
    • 2003
  • The purpose of this study is to suggest a simple estimation method of tidal flat areas using multi-temporal Landsat TM images due to the progress of sea dike construction for tidal land reclamation. As a case study, Hwa-ong project in which dike construct

  • PDF

Changes of Tide Velocity and Direction with Saemangeum Project (새만금사업에 따른 조류속 및 유향 변화(농지조성 및 농어촌정비))

  • 김정균;송기일;최진규
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.66-71
    • /
    • 2000
  • This study was carried out to investigate the changes of tide velocity and sea bottom topology during the construction period of sea dike. The tide velocity and sea bottom depth were measured in Saemangeum area every year, and analyzed and compared to the initial data. The current and future changes of the tide velocity and direction according to the construction of Saemangeum sea dike were presented.

  • PDF