• Title/Summary/Keyword: Sea anchor

Search Result 64, Processing Time 0.028 seconds

Structural and Layout Design Optimization of Ecosystem Control Structures(1) -Characteristics of Mooring Force and Motion Control of the Longline Type Scallop Culturing Facility- (생태계 제어 시설물의 설계 및 배치 최적화(1) -연승식 양식시설의 계류력 특성 및 동요저감에 관한 연구-)

  • RYU Cheong-Ro;KIM Hyeon-Ju
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.28 no.1
    • /
    • pp.35-48
    • /
    • 1995
  • To develop the optimal design method for the longline type scallop culturing facilities in the open sea numerical calculations and hydraulic model experiments are carried out for the stability and function optimization. Using the results for the motion and tension of the facilities, stable design concepts and effects of motion control system by vertical anchor and resistance discs art discussed. The results of this study that can be applied to the design are as follows: 1) Total external forces by design wave $(H_{1/3}\;=\;6,7\;m,\;T_{1/3}\;=\;12sec)$ at the coastal waters of Jumunjin for unit facility (one main line) are estimated to 5-20 tons, and required anchor weights are 10-40 tons in the case of 2-point mooring system. Though the present facilities are stable to steady currents, but is unstable to the extreme wave condition of return period of 10 years. 2) The dimensions and depth of array systems must be designed considering the ecological environments as well as the physical characteristics including the mooring and holding forces that are proportional to the length and relative depth of main line to wave length, and the number of buoys and nets. 3) Oscillation of the facility is influenced by water particle motion and the weight of hanging net, and is excited at both edge, especially at the lee side. To reduce the motion of the nets, the vertical anchoring system and the resistence disc method are recommended by the experimental results, 4) The damage of rope near the anchor by abrasion should be prevented using the ring-type connection parts or anchor chains.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Developing a water discharge anchor & trap bolt to prevent basic salt from penetrating to harbor structures (해수 염기 침투방지를 위한 항만구조물 보수보강용 물배출 앵커 및 트랩볼트 개발에 관한 연구)

  • Ock, Jong-Ho;Moon, Sang-Deok;Lee, Hwa-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.535-541
    • /
    • 2018
  • Most construction methods for the repair and reinforcement of old reinforced concrete harbor structures involve a process of applying a fiber complex or fiber complex panel just like wallpaper to the bottom of structures, such as slabs or beams. On the other hand, these techniques result in the sealing of repaired and reinforced portions of the structures by the fiber products, preventing moisture, such as rainwater entering the structures through the upper surfaces of the slabs or beams from being released, and causing the entire concrete covering of the structures to be peeled off in the long run. To prevent this, it is necessary to develop a technique to protect the basic salt from the sea water from penetrating into the structures while expelling the water absorbed in the structures swiftly. This study attempted to solve the problem by modifying the anchor bolts currently used to repair and reinforce the port structure. That is, by drilling holes into the body of anchor bolts and modifying the caps of the bolts to produce a structure that would let the water flow like a toilet trap, the moisture inside of the structure could be drained through the holes in the anchor bolts. The water discharge anchor bolts developed were tested and observed for 6 months; the water was discharged in 73% of the anchors (200 anchor installation, 145 anchors).

The Model Experiment on Holding Power of the Anchors used in the Set Net (정치망 고정용 닻의 파주력에 대한 모형실험)

  • 윤일부;이주희;권병국;김성훈;신정욱
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.37 no.2
    • /
    • pp.95-105
    • /
    • 2001
  • A series of experiment is carried out to determine the holding power of the existing anchors used in the stationary gear in the coast of the South sea. The experiment apparatus is made of the pulling machine, the load cell, the personal computer and three water tanks the bottom of which are mud, sand and m & s respectively. The result obtained are as follows : 1. On the tension and holding power of the existing anchors, B-type of the stock anchor with two fluke shows the greatest and gets smaller on order of A-type one with a fluke. The holding power of the anchors shows the greatest in the mud and gets smaller in order of m & s, sand. And, the holding power depending upon the length of anchor rope increase as the length does up to the 4 times of depth. 2. On the holding power per fluke area of the existing anchors in case of ration of length of anchor rope to depth is 2, 3 and 4, A-type anchor shows about 310-320 kg/m supper(2), 470-480 kg/m supper(2), 590-640 kg/m supper(2) respectively, B-type one 260-265 kg/m supper(2), 390-450 kg/m supper(2), 630-700 kg/m supper(2) respectively, and C-type one 70-100 kg/m supper(2), 150-180 kg/m supper(2), 210-270 kg/m supper(2) respectively. The holding power per fluke area of the anchors increase as the length of anchor rope does. 3. On the coefficient of holding power of the existing anchors, A-type anchor shows the greatest and gets smaller in the order of B-type one, C-type one.

  • PDF

Behavior of Mooring Line of Silt Protector According to the Change of Sea Level (조위 변화에 따른 오탁방지막 계류라인의 거동)

  • 홍남식;김정윤;강석욱
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 2002.08a
    • /
    • pp.144-147
    • /
    • 2002
  • 오탁방지막은 해상이나 하천에서 준설 및 매립공사등으로 인한 부유사 확산을 방지하는 막체구조로서 부력이 우수한 Polystyrene계로 원통형 부체를 이루는 부체부, 고장력 합성섬유를 사용하여 외력에 대하여 저항하고 여과기능이 있는 막체부,그리고 막체부의 이동을 막기 위해 해저면에 고정시키는 계류라인(Mooring Line) 및 블록(Anchor Block)부로 이루어져 있다 특히 계류라인은 와이어로프 또는 체인 등으로 부체부와 앵커블럭을 연결시켜 주는 역할을 한다. (중략)

  • PDF

Behavior of Mooring Line of Silt Protector According to the Change of Sea Level (조위변화에 따른 오탁방지막 계류라인의 거동)

  • 홍남식;김정윤
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.14 no.3
    • /
    • pp.232-239
    • /
    • 2002
  • This paper studies the behavior of mooring line of silt protector according to the change of sea level. It is found from the analysis of the behavior that if the taut cable length has been determined appropriately within the range of safety factor, the tensioned cable has almost constant tension regardless of the water depth. The whole structure, however, becomes unstable due to the loss (zero tension) of the released cable tension. It is also recognized from the investigation for the effect of intial straight line angle on the behavior of mooring line that the design through the conceptually combined consideration of the cable tension, total scope and buoy deflection has to be required in the mooring analysis. Finally, the material of cable is not damaged because the cable tension is reduced by attached shellfish, but the whole structure may be also unstable by the effect on the anchor angle, total scope and buoy deflection.

Analysis for gillnet loss in the West Sea using numerical modeling (수치 모델링을 이용한 홑자망 어구의 유실 원인 분석)

  • LEE, Gun-Ho;KIM, In-Ok;CHA, Bong-Jin;JUNG, Seong-Jae
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.51 no.4
    • /
    • pp.600-613
    • /
    • 2015
  • The Fishing gear loss has been repeated every year in the West Sea; however, there has been no solution. So fisher men have undergone economic loss every year. Thus it is required to reduce the loss of fishing gear. In this study to find out the reason that the fishing gear is lost in the Sea, 10 years data of wave and current for 6 locations in the West Sea were investigated and a numerical modelling were conducted into the behaviour of a gillnet in wave and current. The fishing gear was modelled with the mass spring model. As a result, it came out into the open that the location where fishing gear loss occurred most frequently was Choongnam province. The height of the maximum significant wave in this province was 6.7 m and the period of that was 4.4 second. The maximum current speed was 0.7 m/s. As a result of simulation with these data, it was revealed that the buoy is one of the reasons to decrease the holding power of the gillnet. For example, the tension of anchor rope was decreased to 50% while the drag coefficient or volume of buoy was decreased to 25%. So it is predicted that an improvement of the buoy contributes to the reduction of the gillnet loss.

A Design of Mooring Line for the Buoy-Enabled Underwater Surveillance System (부이형 수중감시 시스템에서 계류라인의 구조 설계)

  • Byun, Yang-Hun;Choi, Bum-Kyu;Oh, Tae-Won
    • The Journal of Korean Institute of Information Technology
    • /
    • v.16 no.12
    • /
    • pp.41-47
    • /
    • 2018
  • The buoy-enabled underwater surveillance system is a device that is installed in a particular sea area and operated for a certain period of tine and moved to another sea area after recovery. In this paper, a mooring method which is applied for a buoy-enabled underwater surveillance system was selected to maintain installation and enure stable operation. Also, the structure of the mooring line was designed. Two-point mooring method was selected considering interference with the communication cable of array-assembly. The composite structure of buoy chain, nylon rope, and anchor chain is designed as the basic component of mooring line. For the verification of design, a numerical simulation and wave tank experiment were performed. Their results were confirmed similarity in test condition. Finally, the mooring lines were designed for the environment of the sea trial location. The mooring line produced by the final design confirmed the stability above the significant wave height considered in the design on the sea trial.

Experimental Results of Ship-to-Ship Stabilized Mooring System for Mobile Harbor

  • Jeong, Tae-Gweon;Lee, Yun-Sok;Chen, Chao;Kim, Se-Won
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2010.04a
    • /
    • pp.219-220
    • /
    • 2010
  • A new concept of ocean transport system, called mobile harbor, was introduced as a feasibility study in Korea in 2009. Target of the mobile harbor is a smart distance transport of containers with or without cargo handling cranes. Although the mobile harbor project has a lot of topics to deal with, this paper is to focus on only ship-to-ship stabilized mooring, which plays a key role in cargo handling. The ship-to-ship stabilized mooring system was developed and installed on beard a barge of LOA 32m and breadth 12m. The dockside tests as sea test were carried out so as to ascertain ascertained whether the systems can work well to control the barge's motion. The results of dockside test showed that the heave motion of the barge's motion can be reduced by more than 45%.

  • PDF

Experimental Results of Ship-to-ship Stabilized Mooring System for Mobile Harbor

  • Jeong, Tae-Gweon;Lee, Yun-Sok;Chen, Chao;Kim, Se-Won
    • Journal of Navigation and Port Research
    • /
    • v.34 no.4
    • /
    • pp.281-286
    • /
    • 2010
  • A new concept of ocean transport system, called mobile harbor, was introduced as a feasibility study in Korea in 2009. Target of the mobile harbor is a short distance transport of containers with or without cargo handling cranes. Although the mobile harbor project has a lot of topics to deal with, this paper is to focus on only ship-to-ship stabilized mooring, which plays a key role in cargo handling. The ship-to-ship stabilized mooring system was developed and installed on board a barge of LOA 32m and breadth 12m. The dockside tests as sea test were carried out so as to ascertain whether the systems can work well to control the barge’s motion. The results of dockside test showed that the heave motion of the barge's motion can be reduced by more than 45%.