• Title/Summary/Keyword: Scope Management

Search Result 1,248, Processing Time 0.037 seconds

Offshore Outsourcing Success : An Integrated Framework

  • Kim, Jin Ki
    • Journal of Information Technology Applications and Management
    • /
    • v.24 no.4
    • /
    • pp.153-170
    • /
    • 2017
  • As the digital economy goes global, firms are trying to find suppliers that can address their managerial goals and strategies. The alternatives are not confined to domestic firms. Firms have been trying to connect to foreign partners worldwide. Although offshore outsourcing grants firms various benefits, they present big cultural challenges. However, there is little research on the impact of cultural or country factors on outsourcing. The goal of this paper is to synthesize the outsourcing success literature and develop propositions for outsourcing success in the context of offshore outsourcing. This paper proposes that cultural effects should be included in evaluating the success of offshore outsourcing. Knowledge sharing and the scope of outsourcing are adopted in the base outsourcing success model from previous literature. In the extended model partnership quality is included as a mediator and organizational capability and outsourcing relationship type are also included as moderator. Finally, the integrated framework of offshore outsourcing success includes cultural factors as moderators of the relationships between outsourcing success antecedents and the success of offshore outsourcing. Reasoning for propositions, managerial implications, and future research directions are discussed.

An Adaptive Web Caching Method based on the Heterogeneity of Web Object (웹 객체 이질성 기반의 적응형 웹캐싱 기법)

  • Ko, Il-Suk;Na, Yun-Ji;Leem, Chun-Seong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2004.05a
    • /
    • pp.1379-1382
    • /
    • 2004
  • The use of a cache for storing and processing of Web objects is becoming larger. Also, many studies on the efficient management of the storing scope of caches are being done. Web caching algorithms have many differences from traditional algorithms. Particularly, heterogeneity of Web objects that are processing units of Web caching, and a variation of Web object reference characteristic with time are the important causes of the decrease the performance of existing algorithms. In this study, we proposed the new web-caching algorithm. A heterogeneity variation of an object can be reduced as the proposed method dividedly managing Web objects and a cache scope with heterogeneity, and it is adaptively reflecting a variation of object reference characteristics with the flowing of time. In the experiments, we verified that the performance of the proposed method was more improved than existing algorithms through the two experiment models which considered heterogeneity of an object.

  • PDF

Defining a "Safe System of Work"

  • Caponecchia, C.;Wyatt, A.
    • Safety and Health at Work
    • /
    • v.12 no.4
    • /
    • pp.421-423
    • /
    • 2021
  • Providing a "safe system of work" is the essence of the general duties that employers have to their employees under workplace health and safety regulations. Despite this, consistent and appropriate definition of what constitutes a safe system of work is almost non-existent. Available definitions tend to confuse a safe system of work with management practices intended to bring about a safe system, or conflate the broad system suggested in general duties clauses with procedures or work methods that are focused on particular hazards or tasks. This article develops a definition of safe systems of work which recognises the broad scope of the concept and includes psychological health and return to work processes. This definition can be used by a range of stakeholders to better communicate the scope of occupational health and safety duties and more consistently assess whether a safe system has been provided both before and after incidents occur.

The Improvement of Comprehensive situation management systems of Disaster Report (재난신고 종합상황관리체계 발전방안)

  • Lee, Jung-Il
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.559-580
    • /
    • 2010
  • General Command in the whole situation, managed effectively in order to perform the first briefing room of the reorganization plan and the personnel, the situation room of the business division of the scope(function), information exchange and delivery quickly and accurately to support the computerized Communications equipment and system construction, and various field Construction activities related to the information database construction, and should be made to secure the expertise of management personnel. Building of Computer - communication systems equipment environment for new IT technologies is necessary. From this perspective, the leadership position in the country in the Disaster Management Center in Seoul, organization and personnel, computer systems and communication system status, status of foreign countries like Dispatch managing disaster situations by identifying and analyzing the development plan is aimed to find.

  • PDF

A Study on Improved Disaster Management System in Defense Field (우리나라 국방 재난관리 체계의 제도적 개선에 관한 연구)

  • Kim, Min Ho;Seo, Sang Won
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.3
    • /
    • pp.105-111
    • /
    • 2017
  • The number of natural disasters has risen dramatically such as earthquakes, typhoons and floods. However, the scope of disasters expand in today's society due to the rapidly changing environment. This study is to suggest improvements for disaster management system in defense field in order to reduce possible loss or damage from a huge disaster. Through two case studies from the United States and Japan, this research aims to support policy making of disaster management system in defense field.

A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

Case Study of Risk Management on Communication Payload System Development (통신탑재체 개발 위험관리 Case Study)

  • Jeong, Cheol-Oh;Eun, Jong-Won
    • Journal of Aerospace System Engineering
    • /
    • v.5 no.2
    • /
    • pp.8-11
    • /
    • 2011
  • The scope of this paper is to show a risk management plan including how to perform risk assessment and to make a mitigation plan aspects of the communication payload system development. According to system engineering management guide of DoD of USA and risk management plan of satellite communication system, risk assessment and mitigation plan of communication payload system were performed. In this paper, it is indicated the process of risk management and risk assessment procedures as well as mathematical model for risk assessment of DoD guide. It is shown how risk assessment and mitigation plan have implemented in communication payload system development through case study.

Breakdown Structures for Physical Asset Management in Built Environment (건설 산업의 시설물 자산관리를 위한 분류체계 역량)

  • Gebremichael, Dagem Derese;Moon, Kyeongpil;Lee, Yunsub;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.305-306
    • /
    • 2021
  • Breakdown structure (BS) is a tool used to allocate information packages for various management functions and drive computerized information systems. Although several BS exists, work breakdown structures (WBS) and cost breakdown structures (CBS) are the most widely studied and used in previous literature. Nevertheless, heterogeneity of BS and respective management capabilities in current practices are not adequately addressed. In this context, this paper compared the management capabilities of various BS in both building and plant industries through systematic literature. Management requirements and applications scope, in terms of life cycle and stakeholder, were analyzed, respectively. Finally, finding and lesson-learned are outlined.

  • PDF

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

Improvement of Construction Management for Building Remodeling Projects (건축물 리모델링 프로젝트 사례적용에 의한 시공관리 개선방안)

  • Yeo Un-Yong;Yoon You-Sang;Suh Sang-Wook;Lim Byung-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.122-129
    • /
    • 2004
  • The purpose of this study is to propose a way that improves the construction management for remodeling of building. The study attempts to deal with the case study for application and suggests some positive and negative lessons. The main contents and results of the study are as follows. (1) Through the repetitive joint meetings among the various participants, decision making for the remodeling process can be speeded up. (2) Clear work order and communication for work scope can be accomplished by using perspective drawing in design phase. (3) Reliable construction planning and scheduling for remodeling of building can be proposed through case study. (4) By a sound survey, conflict elements can be resolved in advance. Also reasonable procurement plan of equipments and multi-skilled labor can be important factors to keep a construction schedule in time. (5) Through the comparison a case project with other sites having a similar work scope, improvement effect in a time and cost aspect was analyzed quantitatively. The study also recommends that, as a future research, the remodeling process model be developed for more general applications in remodeling of building.