• Title/Summary/Keyword: School Facility Construction

Search Result 205, Processing Time 0.025 seconds

BIM for Construction Quality Record

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.252-254
    • /
    • 2015
  • Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.

  • PDF

Quantification of the CO2 Footprint in Residential Construction

  • Don Mah;Juan D. Manrique;Haitao Yu;Mohamed Al-Hussein;Reza Nasseri
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.525-536
    • /
    • 2009
  • The current residential process adheres to a traditional method of construction involving wood framing on-site on poured concrete foundations which has been widely applied in North America. A conventional residential construction process can include seventeen distinct stages ranging from stake-out to pre-occupancy inspection. The current practice possesses short comings including high construction material wastes, long scheduling timelines, adverse weather conditions, poor quality, low efficiencies and negative environmental impacts from transportation and equipment use. Over CAN $5 billion dollars was spent in the construction sector during 2007 in Canada. Previous findings in CO2 emissions during the construction process of a conventional dwelling emphasize more than 45 tonnes of CO2 emissions. Hence, in Alberta alone during 2007, almost 50,000 residential units would release more than two million tonnes of CO2. These numbers demonstrate the economical and environmental impact in building construction and its relationship with CO2 emissions. The aim of this paper is to quantify the CO2 emissions from the current residential construction process in order to establish the baseline for CO2 emission reduction opportunities. The quantification collection methodology will be approached by identifying the seventeen various stages of construction and quantifying the contributions of CO2 from specific activities and their impacts of work for each stage. The approach of separating these into separate stages for collection will allow for independent opportunities for analysis from various independent contractors from the entire scope of work. The use of BIM will be implemented to efficiently quantify CO2 emissions. Based on the CO2 quantification baseline, emission reduction opportunities such as an industrialized construction process will be introduced that allows homebuilders to reduce the environmental and economical impact of home construction while enabling them to produce higher quality, more energy efficient homes in a safer and shorter period of time.

  • PDF

A Study on the Analysis of Actual costs and Maintenance costs for Elemental Classification hierarchy (부위별 분류 체계를 통한 공사비 및 유지관리비 분석 - 교육 시설물을 중심으로 -)

  • Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.142-150
    • /
    • 2010
  • The purpose of this study is to analyze maintenance costs and estimation of elemental costs for educational buildings. The adapted research method selected four school buildings in seoul region as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and estimate analyzed construction costs and maintenance costs according to that system. According to the analysis, the study proposed a partial construction costs analysis table and maintenance costs table and analyzed proper construction costs and maintenances costs. The results of this study are as follows 1) The average ratio followed by calculation of partial construction costs of the four school buildings are as followings. The total construction costs is analysed 6,666million won and each part of average rations is structure 47.15%, exterior of building 8.34%, interior of building 23.37%, electricity & fire fighting facility 5.74%, water supply & healthy facility 4.27%, heating & water supply facility 5.25%, landscape 1.36%, civil engineering works 4.51%. 2)The average ratio followed by analysis of partial maintenance costs of the four school buildings are as followings. The total maintenance costs is analysed 4,309 million won and each part of average ratio is exterior of building 11.02%, interior of building 41.81%, electricity & fire fighting facility 14.81%, water supply & healthy facility 11.22%, heating & water supply facility 12.76%, landscape 5.75%, civil engineering works 2.63%.

Methane Engine Combustion Test Facility Construction and Preliminary Tests (메탄엔진 연소시험설비 구축 및 예비 시험들)

  • Kang, Cheolwoong;Hwang, Donghyun;Ahn, Jonghyeon;Lee, Junseo;Lee, Dain;Ahn, Kyubok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.25 no.3
    • /
    • pp.89-100
    • /
    • 2021
  • This paper deals with the construction of a combustion test facility and preliminary tests for hot-firing tests of a methane engine. First, the combustion test facility for a 1 kN-class thrust chamber using liquid oxygen/gas methane as propellants was designed and built. Before hot-firing tests, the cold-flow tests of each propellant line and the ignition tests of torch igniter/afterburner were performed to verify propellant supply stability of the combustion test facility, operation of the control and measurement system, and successful ignition. Finally, a preliminary hot-firing test was conducted to measure the combustion efficiency, heat flux, and combustion stability of a thrust chamber prototype. The constructed combustion test facility will be helpfully used for basic research and development of methane engine thrust chambers.

A Research on the Construction Plan for School Facility Compounding - To the state Kuui elementary school centers neighboring a big city - (학교시설 복잡화 건축계획 분석 연구 -대도시 근린주구의 초등학교 중심으로-)

  • Ha, Kwang-Suk;Lee, Jae-Rim
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.47-58
    • /
    • 2008
  • Driven by the changes of living environment and the improvement of life quality there is a growing desire for education, culture, daily life sports, and welfare of local residents. One of the places with the facilities and space which can accommodate such desires of the residents is elementary facility within welfare districts. Additionally, elementary school facilities are assuming more roles as the center of local community, and the current education facility policies are going through a great deal of changes and diversification of school facilities due to the operation of the new 7th education courses. Therefore, the purpose of this research was to analyze school facility compounding by domestic and overseas trends and patterns in line with the trend of the social demand, and the researcher found out that in Japan the mutual exchanges among local residents are very active by compounding sports facilities, cultural facilities, lifelong education facilities, and social welfare facilities in school facilities. Therefore, this thesis researched on the space structure pattern and planning elements of compounding facilities under the premise of utilizing them for the local society reflecting the domestic trends and characteristics, and intended to propose a direction for planned research on the compounded facilities of elementary school.

  • PDF

A Study on the Definition of the Educational Facility Maintenance (교육시설물 유지관리 업무규명에 관한 연구)

  • Shon Woo-Kyung;Kim Jang-Young;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.567-570
    • /
    • 2002
  • our country school construction from 1990 year middle the facility expension for the improvement or education environment and the maintenance expense of various conservative construction for old education facilities is increasing. It accomplishes the each subject wild for business which maintains the training facility enterprise to be, the minute paragraph of information and deficient standard of information. It brings about the duplication investment a waste of the revenue source which is limited. Occurrence information which it follows consequently in business process and requirement must clear. We the maintenance phase of the education facilities understand, problem point and obstacle VIP analysis it leads it presents it does analyze. The improvement process model which leads a hereafter function for obstacle VIP extraction and information model construction must be accomplished.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

A Study on the Regulation for Mental Healthcare Facility and Delivery System in China (중국의 정신의료시설 및 지원체계에 관한 법제도 연구)

  • Gao, Wen Mei;Yun, Woo Yong;Chai, Choul Gyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.24 no.1
    • /
    • pp.7-14
    • /
    • 2018
  • Purpose: This study analyzes mental healthcare delivery services and types of facilities, the status of installation and operation, and planning standard. The purpose of the study is to propose a basic data for the performance of related research and work tasks, along with an understanding of the Chinese mental healthcare facility type and support system. Furthermore, it will show a lack of current function management as the changes of mental health concept and demand for services increases, and it is intended to provide implications for the construction of mental health facilities. Methods: This study was conducted by a research on law and regulation of China's mental healthcare delivery service system and mental healthcare facility. The analyzed data are the national standard GB, the optional national standard GB/T, the building construction standard JGJ, and the report issued by the Health Planning and Development Committee. Results: At present mental healthcare facility construction in China is in the period of rapid development and it exposes the layout of medical facilities, which is not currently reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of mental healthcare service. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese Mental healthcare system and facilities, and can promote construction of Chinese mental healthcare facility theory in perfect condition.

Green Tourism Accessibility Evaluation for Policy Making of Rural Closed School - Case By Chungcheongnamdo Province - (농촌폐교 활용 정책수립을 위한 그린투어리즘 접근성 평가 - 충청남도를 대상으로-)

  • Chang, Woo-Seok;Jung, Nam-Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.4
    • /
    • pp.293-306
    • /
    • 2013
  • According to the increase of rural experience, that is important in satisfying needs of green tourism and vitalizing rural economy to use closed school in rural area as experience facility. For using closed school as experience facility, political and institutional assistants are needed in effective equipments and stable operation based on multi-perspective approach and analysis. In this study, we try to evaluate green-tourism accessibility of rural experience facility remodeled from closed school considering regional population and spatial characteristics. In evaluating process, gravity potential model are adapted with considering group size of customer and distance-friction coefficient. Distance-friction coefficient is a function of user restriction which depend on possible activity in each experience facility. Green tourism accessibility of experience facility is calculated with summation of accessibility to each region, and we analyzed it as a group by closed school type and location with application in Chungcheongnam-do. We found a correlation between green tourism accessibility of rural closed school and their income.

Characteristic Analysis of the Changes of Landscape Architecture Construction Costs in Time-series - Focused on the Cases of Works of Public Institution's at Capital Area - (아파트단지 조경 공사비의 공종별 경년변화 특성 분석 - 공공기관 시행의 수도권 아파트단지를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.150-159
    • /
    • 2015
  • This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.