• Title/Summary/Keyword: Scheduling model

Search Result 1,011, Processing Time 0.029 seconds

The Scheduling Algorithm for Operating the Facility of Exhibition and Convention (전시.컨벤션 시설의 합리적 운영을 위한 스케줄링 개발)

  • Kim, Chang-Dae;Joo, Won-Sik
    • IE interfaces
    • /
    • v.19 no.2
    • /
    • pp.153-159
    • /
    • 2006
  • The research of scheduling algorithms for operating the facility of exhibition and convention can be hardly found in published papers. This study is to find problems in the process of operating the facility of exhibition and convention and to develop the scheduling algorithm satisfying those problems. The scheduling algorithm of this paper is developed through constructing the mathematical model and analyzing the mathematical structure of variables and constraints in that model. The scheduling algorithm developed in this paper consists of the first stage of scheduling, the second stage of feasibility routine and the third stage of improving scheduling results. Some experimental results are given to verify the effectiveness of the scheduling algorithm developed in this paper.

Comparison Study of Nonlinear CSAS Flight Control Law Design Using Dynamic Model Inversion and Classical Gain Scheduling (항공기 CSAS 설계를 위한 고전적 Gain Scheduling 기법과 Dynamic Model Inversion 비선형 기법의 비교 연구)

  • Ha, Cheol-Geun;Im, Sang-Su;Kim, Byeong-Su
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.7
    • /
    • pp.574-581
    • /
    • 2001
  • In this paper we design and evaluate the longitudinal nonlinear N(aub)z-CSAS(Command and Stability Augmentation System) flight control law in \"DMI(Dynamic Model Inversion)-method\" and classical \"Gain Scheduling-method\", respectively, to meet the handling quality requirements associated with push-over pull-up maneuver. It is told that the flight control law designed in \"DM-method\" is adequate to the full flight regime without gain scheduling and is efficient to produce the time response shape desired to the handling quality requirements. On the contrary, the flight control law designed in \"Gain Scheduling-method\" is easy to be implemented in flight control computer and insensitive to variation of the actuator model characteristics.n of the actuator model characteristics.

  • PDF

A Study on a Mathematical Model of the Long-term Track Tamping Scheduling Problem (도상 다짐작업의 장기 일정계획 문제에 관한 수리적 모형 고찰)

  • Oh Seog-Moon;Lee Jeeha;Lee Hee-Up;Park Bum Hwan;Hong Soon-Heum
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.50-56
    • /
    • 2006
  • This paper presents a mathematical model of the long-term track tamping scheduling problem in the Korean highspeed railway system. The presented model encompasses various operational field constraints, moreover improves a state-of-the-art model in extending the feasible space. We show the model is sized up to intractable scale, then propose another approximation model that is possible to handle with the present computer system and commercial optimization package, directly. The aggregated index, lot, is selected, considering the resolution of the planning horizon as well as scheduling purpose. Lastly, this paper presents two test results for the approximation model. The results expose the approximation model to quite promising in deploying it into an operational software program for the long-term track tamping scheduling problem.

Task-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.117-121
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. Despite the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the tasks expected to be performed by schedulers has been an on-going concern in the construction industry. This study proposes a task-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A task-technology fit model that aims to measure the extent to which a construction scheduling method functionally matches the tasks expected to be performed by the scheduling staff. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

Staffing-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.631-635
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. In spite of the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the capabilities of the scheduling staff has been an on-going concern in the construction industry. This study proposes a staffing-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A staffing-technology fit model that aims to measure the extent to which a construction scheduling method matches the staff's experience, know-how and capabilities. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

Improvement of Optimal Bus Scheduling Model Reflecting Bus Passenger's Degree of Satisfaction (이용자 만족도를 반영한 최적 버스 배차 간격 설정 모형의 개발)

  • Bae, Sang-Hoon;Kim, Tag-Young;Ryu, Byung-Yong
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.6 no.3
    • /
    • pp.12-23
    • /
    • 2007
  • The purpose of this studγ if to understand problem of present bus scheduling system and to develop optimal bus scheduling model which improve bus passenger's degree of satisfaction(DOS) and bus company's operation efficiency at the same time. This study developed optimal bus scheduling model, which reflected bus passenger's degree of satisfaction(DOS), applied to existing model that summery of bus operation cost($C_o$), passenger queuing time cost($C_{pw}$) and passenger travel time cost($C_{pl}$). And optimal bus scheduling model which developed in this study is optimized that using LINGO program based on linear program. Also by using the general case in Busan, compare total cost of present bus scheduling system and existing scheduling model with total cost of optimal bus scheduling model which reflected bus passenger's degree of satisfaction(DOS).

  • PDF

Fuzzy Logic-based Grid Job Scheduling Model for omputational Grid (계산 그리드를 위한 퍼지로직 기반의 그리드 작업 스케줄링 모델)

  • Park, Yang-Jae;Jang, Sung-Ho;Cho, Kyu-Cheol;Lee, Jong-Sik
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.5
    • /
    • pp.49-56
    • /
    • 2007
  • This paper deals with grid job allocation and grid resource scheduling to provide a stable and quicker job processing service to grid users. In this paper, we proposed a fuzzy logic-based grid job scheduling model for an effective job scheduling in computational grid environment. The fuzzy logic-based grid job scheduling model measures resource efficiency of all grid resources by a fuzzy logic system based on diverse input parameters like CPU speed and network latency and divides resources into several groups by resource efficiency. And, the model allocates jobs to resources of a group with the highest resource efficiency. For performance evaluation, we implemented the fuzzy logic-based grid job scheduling model on the DEVS modeling and simulation environment and measured reduction rates of turnaround time, job loss, and communication messages in comparison with existing job scheduling models such as the random scheduling model and the MCT(Minimum Completion time) model. Experiment results that the proposed model is useful to improve the QoS of the grid job processing service.

  • PDF

Integration of Process Planning and Operations Scheduling by Process Net Model and Genetic Algorithm (공정 네트 모델과 유전 알고리즘에 의한 공정 계획과 일정 계획의 통합)

  • 박지형;강민형;노형민
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.3
    • /
    • pp.82-87
    • /
    • 1998
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper, an integrated system of process planning and operations scheduling based on the concept of process net model and genetic algorithm is suggested. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

Context-Aware Ad Contents Scheduling over DOOH Networks based on Factorization Machine

  • Nguyen, Van Hoang;Nguyen, Thanh Binh;Chung, Sun-Tae
    • Journal of Korea Multimedia Society
    • /
    • v.22 no.4
    • /
    • pp.515-526
    • /
    • 2019
  • DOOH(Digital Out Of Home) advertising targets for reaching consumers through outdoor digital display medias. Traditionally, scheduling of advertisement contents over DOOH medias is usually done by operator's strategy, but an efficient ad scheduling strategy is not easy to find under various advertising contexts. In this paper, we present a context-aware factorization machine-based recommendation model for the scheduling under various advertising contexts, and provide analysis for understanding of the contexts' effects on advertising based on the recommendation model. Through simulation results on the dataset adapted from a real dataset of RecSys challenge 2015, it is shown that the proposed model and analysis based on the model will be effective for better scheduling of ad contents under advertising contexts over DOOH networks.

Calculation of a reference force for feedrate scheduling using the FEM analysis of a tool (엔드밀링 공구의 유한요소해석을 통한 이송속도 스케줄링의 기준 절삭력 산출)

  • 이한울;조동우
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2004.10a
    • /
    • pp.416-421
    • /
    • 2004
  • Off-line feedrate scheduling is presented as the advanced technology to regulate cutting forces at the desired level through change of feedrates. In rough cutting, the feedrate scheduling aims at reducing the machining time, which is the most important factor for better productivity. Thus, the largest force which can avoid breakage of tool shank and tooth is a reference force for feedrate scheduling in rough cutting. In this paper, a calculation method of the reference cutting force for feedrate scheduling is developed. This model calculates rupture plane of tooth using the FEM analysis of a tool and computes the reference force using the transverse rupture strength of a tool. Experiments validate that the presented feedrate scheduling model reduced machining time drastically and regulate cutting forces at the reference cutting force.

  • PDF