• Title/Summary/Keyword: Scheduling System

Search Result 2,160, Processing Time 0.025 seconds

A Mathematical Model for Airline Ground Crew Scheduling Problem (항공사 지상직 승무원 근무 당번표 작성문제)

  • Ko, Young Dae;Oh, Yonghui
    • Korean Management Science Review
    • /
    • v.29 no.3
    • /
    • pp.183-192
    • /
    • 2012
  • For the past several decades, personnel scheduling and rostering problem has been one of the most popular research topics in optimization area. Among the numerous applications, airline (aviation) industry has been given most attention due to the economic scale and impact. Most of the literatures about the staff scheduling problem in airline industry are dealing with the air crew, pilots and flight attendances, and the rest of the literatures are about the ground staff, by whom cleaning, maintenance, fueling of aircraft and handling luggage are done from landing to taking off. None of the literatures found by the authors are dealing with the airline ground crew. In this paper roster of airline ground crew, who is responsible for issuing boarding pass, checking baggage, etc, is introduced, formulated and solved using CPLEX. Some expressions of the mathematical formulations, which are not suitable input format of the CPLEX, were transformed. Numerical examples are presented for the validation of proposed scheduling system.

A Scheduling Scheme using Partial Channel Information for Ad-hoc Networks (Ad-hoc 망에서 채널의 부분정보를 이용한 스케줄링 기법)

  • 신수영;장영민
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.28 no.11B
    • /
    • pp.1031-1037
    • /
    • 2003
  • A new scheduling scheme, which uses channel quality information of each flow in Bluetooth system of ad-hoc network for effective bandwidth assignment, has been proposed in this paper. By an effective bandwidth assignment, QoS (Quality of Service) could have been ensured in case of asymmetric data traffic, mixed data transmission, and congested data transmission in a specific channel. The scheduling algorithm determines channel weights using partial channel information of flows. Case studies conducted by NS-2 (Network Simulator 2) and Bluehoc simulator has been presented to show the effectiveness of the proposed scheduling scheme.

Single Machine Scheduling Problem with Step-deterioration under A Rate-modifying Activity (단일 복구조정활동 하에 단계적 퇴화를 가지는 단일기계 생산일정계획)

  • Kim, Byung Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.3
    • /
    • pp.43-50
    • /
    • 2014
  • In this paper, we deal with a single machine scheduling problems integrating with step deterioration effect and a rate-modifying activity (RMA). The scheduling problem assumes that the machine may have a single RMA and each job has the processing time of a job with deterioration is a step function of the gap between recent RMA and starting time of the job and a deteriorating date that is individual to all jobs. Based on the two scheduling phenomena, we simultaneously determine the schedule of step deteriorating jobs and the position of the RMA to minimize the makespan. To solve the problem, we propose a hybrid typed genetic algorithm compared with conventional GAs.

Low-power Scheduling Framework for Heterogeneous Architecture under Performance Constraint

  • Li, Junke;Guo, Bing;Shen, Yan;Li, Deguang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.5
    • /
    • pp.2003-2021
    • /
    • 2020
  • Today's computer systems are widely integrated with CPU and GPU to achieve considerable performance, but energy consumption of such system directly affects operational cost, maintainability and environmental problem, which has been aroused wide concern by researchers, computer architects, and developers. To cope with energy problem, we propose a task-scheduling framework to reduce energy under performance constraint by rationally allocating the tasks across the CPU and GPU. The framework first collects the estimated energy consumption of programs and performance information. Next, we use above information to formalize the scheduling problem as the 0-1 knapsack problem. Then, we elaborate our experiment on typical platform to verify proposed scheduling framework. The experimental results show that our proposed algorithm saves 14.97% energy compared with that of the time-oriented policy and yields 37.23% performance improvement than that of energy-oriented scheme on average.

Multimedia Service Scheduling Algorithm for OFDMA Downlink (OFDMA 다운링크를 위한 멀티미디어 서비스 스케줄링 알고리즘)

  • Jang, Bong-Seog
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.2
    • /
    • pp.9-16
    • /
    • 2006
  • This paper proposes a scheduling algorithm for efficiently processing multimedia pakcet services in OFDMA physical system of the future broadband wireless access networks. The scheduling algorithm uses wireless channel state estimation, and allocates transmission rates after deciding transmission ordering based on class and priority policy. As the result, the proposed scheduling algorithm offers maximum throughput and minimum jitter for realtime services, and fairness for non-realtime services. In simulation study, the proposed algorithm proves superior performances than traditional round robin method.

  • PDF

A Fault-tolerant Task Scheduling Algorithm Supporting the Minimum Schedule Length (최소의 스케줄 길이를 유지하는 결함 허용 태스크 스케줄링 알고리즘)

  • Min, Byeong-Jun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.4
    • /
    • pp.1201-1210
    • /
    • 2000
  • In order to tolerate faults which may occur during the execution of distributed tasks in high-performance parallel computer systems, tasks are duplicated on different processors. In this paper, by utilizing the task duplication based scheduling algorithm, a new task scheduling algorithm which duplicates each task on more than two different processors with the minimum schedule length is presented, and the number of processors required for the duplication is analyzed with the ratio of communication cost to computation time and the workload of the system. A simulation with various task graphs reveals that the number of processors required for the full-duplex fault-tolerant task scheduling with the obtainable minimum schedule length increases about 30% to 75% when compared with that of the task duplication based scheduling algorithm.

  • PDF

Simulation for Flexibility of Flexible Job Shop Scheduling (유연 Job Shop 일정계획의 유연성에 대한 시뮬레이션)

  • Kim, Sang-Cheon;Kim, Jung-Ja;Lee, Sang-Wan;Lee, Sung-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.4 no.3
    • /
    • pp.281-287
    • /
    • 2001
  • Traditional job shop scheduling is supposed that machine has a fixed processing job type. But actually the machine has a highly utilization or long processing time is occurred delay. Therefore product system is difficult to respond quickly to the change of products or loads or machine failure etc. Here we use flexible job shop which is supposed that a machine has several jobs by tool change. The heuristic for the flexible job shop scheduling has to solve two problems. One is a routing problem which is determine a machine to process job. The other is sequencing problem which is determine processing sequence. The approach to solve two problems arc a hierarchical approach which is determined routing and then schedule, and a concurrence approach which is solved concurrently two problems by considering routing when it is scheduled. In this study, we simulate for flexibility efficiency fo flexible job shop scheduling with machine failure using hierarchical approach.

  • PDF

Conceptual Design of Production Planning and Scheduling Module to Improve Delivery Quality

  • Choi, Jung-Sang
    • Journal of the military operations research society of Korea
    • /
    • v.29 no.1
    • /
    • pp.112-119
    • /
    • 2003
  • The procedure and implementation of an simulation based production planning and scheduling system. Production planning and scheduling is important problem in manufacturing field. It is so important for delivery quality as well as productivity, too. In this paper, heuristic production planning and scheduling module for improving delivery quality and productivity will be discussed. Beginning with total demand and initial work in process, the algorithms for production scheduling and planning can efficiently generate a feasible production resources and capacity schedule results in high resource utilization, minimum number of the late orders and reduced labor variability. The algorithm is executed to achieve the best on time delivery performance. The developed heuristic algorithms in the module will be expected to provide the better delivery performance and productivity.

Evaluation of Appointment Policy and Scheduling Rule for a Dental Clinic Based on Computer Simulation (시뮬레이션을 이용한 치과의원의 예약정책과 스케줄링 규칙 평가)

  • Lee, Jong-Ki;Kim, Myeng-Ki;Ha, Byung-Hyun
    • Korea Journal of Hospital Management
    • /
    • v.16 no.4
    • /
    • pp.161-182
    • /
    • 2011
  • In today's competitive dental markets, it is of paramount importance to improve service quality and at the same time to use scarce resource efficiently. In this study, we present appointment policies and scheduling rules for private dental clinics to reduce the waiting time of patients and to increase the revenue by utilizing resource more effectively. This study validates the proposed appointment policies and scheduling rules based on simulation models. We show that the bottleneck-based appointment policy is the most effective among appointment policies, followed by the multiple-block appointment one. The shortest processing time among scheduling rules contributes most to the performance of the appointment system.

  • PDF

Constrained Multi-Area Dispatch Scheduling Algorithm with Regionally Distributed Optimal Power Flow Using Alternating Direction Method (ADM 기반 분산처리 최적조류계산을 이용한 다지역 제약급전계획 알고리즘)

  • Chung, Koo-Hyung;Kim, Bal-Ho;Lee, Jong-Joo;Kim, Hak-Man
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.3
    • /
    • pp.245-252
    • /
    • 2010
  • This paper proposes a constrained multi-area dispatch scheduling algorithm applicable to interconnected power system operations. The dispatch scheduling formulated as an MIP problem can be efficiently computed by GBD algorithm. GBD guarantees adequate computation speed and solution convergence by reducing the dimension of the dispatch scheduling problem. In addition, the regional decomposition technique based on ADM is introduced to obtain efficient inter-temporal OPF solution. It can find the most economic dispatch schedule incorporating power transactions without each regional utility's private information open.