• Title/Summary/Keyword: Scheduling & Control

Search Result 956, Processing Time 0.042 seconds

Comparison Study of Nonlinear CSAS Flight Control Law Design Using Dynamic Model Inversion and Classical Gain Scheduling (항공기 CSAS 설계를 위한 고전적 Gain Scheduling 기법과 Dynamic Model Inversion 비선형 기법의 비교 연구)

  • Ha, Cheol-Geun;Im, Sang-Su;Kim, Byeong-Su
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.7
    • /
    • pp.574-581
    • /
    • 2001
  • In this paper we design and evaluate the longitudinal nonlinear N(aub)z-CSAS(Command and Stability Augmentation System) flight control law in \"DMI(Dynamic Model Inversion)-method\" and classical \"Gain Scheduling-method\", respectively, to meet the handling quality requirements associated with push-over pull-up maneuver. It is told that the flight control law designed in \"DM-method\" is adequate to the full flight regime without gain scheduling and is efficient to produce the time response shape desired to the handling quality requirements. On the contrary, the flight control law designed in \"Gain Scheduling-method\" is easy to be implemented in flight control computer and insensitive to variation of the actuator model characteristics.n of the actuator model characteristics.

  • PDF

Identification of scheduling problems for CSCW-based shop floor control in agile manufacturing

  • Cha, Soohyun;Cho, Hyunbo;Jung, Mooyoung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.208-215
    • /
    • 1995
  • Numerous solution methods for scheduling problems such as part dispatching problem, operation sequence problem have been suggested as a means to be embedded in hierarchical or centralized shop floor control. Under the preceding control philosophies, however, response to changes in the shop floor status is quite slow and timely decision is sometimes impossible. Moreover, the control software becomes too large and it is almost impossible to modify the control software when the configuration of the shop floor changes. In agile manufacturing which emerged recently to cope with quick response and easy modifiability when unexpected changes occur, a new control policy is needed. CSCW[Computer Supported Cooperative Work] based shop floor control casts a different view on scheduling problems. Decisions are made locally when requested and useful information is scattered among agents for its efficient use. Adaptation is easy because agents are -'plug compatible or portable. In this paper, scheduling problems occurring under CSCW based shop floor control are identified and characterized. Traditional scheduling problems are reviewed from the CSCW viewpoint. All the control entities involved in the shop floor can be found and used to defined agents. With these entities and CSCW concept, possible scheduling problems are identified.

  • PDF

Maximum Allowable Delay Bounds and Real-time Scheduling Method of Networked Discrete-time Control Systems (네트워크 기반 이산 시간 제어 시스템의 최대 허용 지연 한계 및 실시간 스케줄링 기법에 관한 연구)

  • Kim Dong-Sung;Choi Dong-Hyuk
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.12 no.7
    • /
    • pp.719-727
    • /
    • 2006
  • This paper proposes a new method to obtain a maximum allowable delay bound for a scheduling of networked discrete control systems and event-based scheduling method. The proposed method is formulated in terms of linear matrix inequalities and can give a much less conservative delay bound than the existing methods. A network scheduling method is presented based on the delay obtained through the proposed method, and it can adjust the sampling period to allocate same utilization to each control loop. The presented method can handle three types of data (sporadic, emergency data, periodic data and non real-time message) and guarantees real-time transmission of periodic and sporadic emergency data using modified EDF scheduling method.

SCHEDULING TECHNIQUE FOR CONTROL STEP (스케듈링 기법 연구)

  • JeongYoungSong;NamWooBack
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.3
    • /
    • pp.163-173
    • /
    • 2001
  • This paper deals with scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informaion trom the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth - order elliptic wave filter of a standard benchmark moedl, and then it is drawing up T.N matrix table by the number resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource th use this table. All of existing list scheduling techniques determine the priority function first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Scheduling Technique for Control Step (제어구간에 의한 스케듈링 기법)

  • Song, Jeong-Young;Back, Nam-Woo
    • The Journal of Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.35-45
    • /
    • 2002
  • This paper deals with the scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informations from the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth – order elliptic wave filter of a standard benchmark model, and then it is drawing up T.N matrix table by the number of resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource to use this table. All of existing list scheduling techniques determine the priority functions first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Performance Verification of the Modified Gain Scheduling Controller by Speed Control of a DC Motor (DC 모터 제어를 통한 개선된 게인 스케줄링 제어기의 성능 검증)

  • Cheon, Min-Kyu;Park, Mig-Non;Hyun, Chang-Ho;Lee, Hee-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.312-314
    • /
    • 2006
  • This paper describes performance of the modified gain scheduling controller by speed control of a DC motor. The modified gain scheduling controller can perform tracking at more than one equilibrium points. The modified gain scheduling controller which considers transient response according to added zero shows better result of tracking performance than the unmodified gain scheduling controller shows.

  • PDF

Design of the intelligent control-based job scheduler (지능형 제어기법에 의한 생산 계획 설계)

  • 이창훈;서기성;정현호;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.286-289
    • /
    • 1989
  • The purpose of this paper is to design a job scheduling algorithm utilizing intelligent control technique. Rulebase is built through the evaluation of rule-set scheduling. 24 scheduling rule-sets and meta-rules are employed. An appropriate scheduling rule-set is selected based on this rulebase and current manufacturing system status. Six criteria have been used to evaluate the performance of scheduling. The performance of sheduling is dependent on random breakdown of the major FMS components during simulation.

  • PDF

Application of the hierarchical scheduling policy to FMC (FMC에 계층적 스케쥴링 전략의 적용)

  • Yeo, Yong-Kee;Lyou, Joon
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10a
    • /
    • pp.482-487
    • /
    • 1991
  • The scheduling algorithm based on the hierarchical scheduling policy is presented for the Job Shop type FMC control, and the simulation results using this hierarchical scheduling policy are with the results which are based on the heuristic scheduling policy. The results show that the hierarchical ling policy is more efficient than the heuristic scheduling policy in either case that there exist machine failures in the FMC or not.

  • PDF

Scheduling and simulation for FMC systems (FMC 시스템의 스케쥴링 및 시뮬레이션)

  • 서기성;이노성;안인석;박승규;이규호;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.370-375
    • /
    • 1992
  • This paper deals with the scheduling and simulation for FMC(Flexible Manufacturing Cells). In order to achieve CIM, there is a critical need to link factory level and machine level. The primary functions performed by this link for all jobs issued to the shop floor and cell include short-term scheduling and dynamic operational scheduling. Here, hierarchical control structure is introduced to define these functions. And Intelligent scheduling through expert module is adopted for efficiency of FMC operation. Computer simulation reveals that expert scheduling method is better than heuristics in various performance index.

  • PDF

An Effect of Pitch Gain-Scheduling on Shaft Vibration Response of Wind Turbine (풍력터빈 축 진동 응답에 대한 피치 게인-스케쥴링의 효과)

  • Lim, Chae-Wook;Jo, Jun-Chul
    • The KSFM Journal of Fluid Machinery
    • /
    • v.15 no.2
    • /
    • pp.36-40
    • /
    • 2012
  • Pitch control of wind turbine is activated above rated wind speed for the purpose of rated power regulation. When we design pitch controller, its gain-scheduling is essential due to nonlinear characteristics of aerodynamic torque. In this study, 2-mass model including a vibration mode of drive-train for a 2 MW wind turbine is considered and pitch control with gain-scheduling using a linearization analysis of the nonlinear aerodynamic torque is applied. Some simulation results for the pitch gain-scheduling under step wind speed are presented and investigated. It is shown that gain-scheduling in pitch control is important especially in the region of high wind speeds when there exists a vibration mode of drive-train.