• Title/Summary/Keyword: Scheduling

Search Result 4,895, Processing Time 0.029 seconds

Scheduling Optimization for Safety Decommissioning of Research Reactor (연구로 안전 해체를 위한 스케쥴링 최적화)

  • Kim, Tae-Sung;Park, Hee-Seoung;Lee, Jong-Hwan;Chang, Sung-Ho;Kim, Sang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.67-75
    • /
    • 2006
  • Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.

Project Scheduling for Object-Oriented Development in Matrix Organization (유전자 알고리즘을 이용한 매트릭스조직의 객체지향개발 프로젝트 스케줄링)

  • Lee, Gun-Ho;Kim, Uen-Jin
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.5
    • /
    • pp.67-78
    • /
    • 2007
  • This paper discusses a scheduling problem on object-oriented developments over multiple teams with limited resources in matrix organization. The objective of the problem is to minimize the makespan of overall projects. There are tangible and intangible advantages such as efficient resource share, improvement of productivity, development efforts and cost reduction, etc. by dispatching resources properly to the development teams. Traditionally, the project scheduling has been done with a manager's intuition or heuristic. We present a scheduling model with illustrative examples, stochastic search approach, and apply a variety of problems generated randomly to the approach. The results are analysed.

Train Scheduling and Rescheduling In Pakistan

  • Abid, Malik Muneeb;Khan, Muhammad Babar
    • International Journal of Railway
    • /
    • v.6 no.1
    • /
    • pp.7-12
    • /
    • 2013
  • This paper provides an overview of Pakistan Railways scheduling and rescheduling. First of all, Pakistan Railways is introduced with its brief history and importance in this country. Assets of this network with passengers and freight using this are given. Current hope less situation is leading to privatization of this system as well as promoting short distance traveler to use road and Government efforts to retain is also presented. Train scheduling in Pakistan is being done manually, based on manual time distance graph preparation and resolution of conflicts based on manager's experience and ability. In Real-time management of this traffic Lahore head office is connected with six control stations in the Pakistan, decision for resolution of any disturbance is coordinated among them. It is recommended that computer aided tools must be developed for this system to help traffic managers and it is needed to invest on the segments to increase their speed limits which might attract passengers to use this mode of transportation with high priority.

Lyapunov-based Fuzzy Queue Scheduling for Internet Routers

  • Cho, Hyun-Cheol;Fadali, M. Sami;Lee, Jin-Woo;Lee, Young-Jin;Lee, Kwon-Soon
    • International Journal of Control, Automation, and Systems
    • /
    • v.5 no.3
    • /
    • pp.317-323
    • /
    • 2007
  • Quality of Service (QoS) in the Internet depends on queuing and sophisticated scheduling in routers. In this paper, we address the issue of managing traffic flows with different priorities. In our reference model, incoming packets are first classified based on their priority, placed into different queues with different capacities, and then multiplexed onto one router link. The fuzzy nature of the information on Internet traffic makes this problem particularly suited to fuzzy methodologies. We propose a new solution that employs a fuzzy inference system to dynamically and efficiently schedule these priority queues. The fuzzy rules are derived to minimize the selected Lyapunov function. Simulation experiments show that the proposed fuzzy scheduling algorithm outperforms the popular Weighted Round Robin (WRR) queue scheduling mechanism.

New Scheduling Algorithm for Fairness Criteria of ATM ABR (ATM ABR의 공평성들을 위한 새로운 스케쥴링 알고리즘)

  • 오미진;강정림;정경택;정동수
    • Proceedings of the IEEK Conference
    • /
    • 2002.06a
    • /
    • pp.81-84
    • /
    • 2002
  • The WRR scheduling algorithm is widely used in ATM networks due to its simplicity and the low cost of hardware implementation. It guarantees minimum cell rate according to the weight of each queue. The fairness is a important factor for ABR service. That is, Scheduling algorithm allocates network resources fairly to each VC. In this paper, we propose a scheduling algorithm for satisfying the two fairness criteria, MCR plus equal share and Maximum of MCR or Max-Min share, among the six criteria defined by ATM Forum TM 4.1 specification. The WRR, Nabeshima et al, and the proposed scheduling algorithms are compared with respect to fairness and convergence time throughout experimental simulation.

  • PDF

Dynamic Pfair Scheduling Using an Improved Reach Function (개선된 도달 함수를 이용한 동적 Pfair 스케줄링)

  • Park, Hyun-Sun;Kim, In-Guk
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.11 no.1
    • /
    • pp.165-170
    • /
    • 2011
  • The Pfair scheduling algorithm, which is an optimal algorithm in the hard real-time multiprocessor environments, is based on the fixed quantum size. Recently, several methods that can determine the optimal quantum dynamically are developed in the mode change environments. These methods are based on the reach function and in many cases, we have to do the sequential search to find the optimal quantum. In this paper, we propose a new scheduling method, based on the improved reach function, that can determine the optimal quantum more quickly.

On-line Scheduling Analysis for Job-Shop Type FMS

  • Lee, Jeong Hwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.64
    • /
    • pp.63-76
    • /
    • 2001
  • This paper presents a job-shop type flexible manufacturing system(FMS) scheduling problem and examines the effects of scheduling rules on the performance of FMS. Several machine and AGV scheduling rules are tested against the mean flow-time criterion. In this paper, I compare the rules under various experimental conditions by using an FMS simulation model. One of the objectives of this study is to discuss how the simulation-based scheduling problem can be operated. The other is to measure sensitivity of the rules to changes at inter arrival time, queue capacity, breakdown rates for machines and AGV, and AGV speed. Therefore, the results of simulation experiments were considered on FMS design and operating stages. A comprehensive bibliograph? is also presented in the paper.

  • PDF

Adaptive Cross-Layer Packet Scheduling Method for Multimedia Services in Wireless Personal Area Networks

  • Kim Sung-Won;Kim Byung-Seo
    • Journal of Communications and Networks
    • /
    • v.8 no.3
    • /
    • pp.297-305
    • /
    • 2006
  • High-rate wireless personal area network (HR-WPAN) has been standardized by the IEEE 802.15.3 task group (TG). To support multimedia services, the IEEE 802.15.3 TG adopts a time-slotted medium access control (MAC) protocol controlled by a central device. In the time division multiple access (TDMA)-based wireless packet networks, the packet scheduling algorithm plays a key role in quality of service (QoS) provisioning for multimedia services. In this paper, we propose an adaptive cross-layer packet scheduling method for the TDMA-based HR-WPAN. Physical channel conditions, MAC protocol, link layer status, random traffic arrival, and QoS requirement are taken into consideration by the proposed packet scheduling method. Performance evaluations are carried out through extensive simulations and significant performance enhancements are observed. Furthermore, the performance of the proposed scheme remains stable regardless of the variable system parameters such as the number of devices (DEVs) and delay bound.

Efficient Message Scheduling for WDM Optical Networks with Minimizing Flow Time

  • Huang, Xiaohong;Ma, Maode
    • Journal of Communications and Networks
    • /
    • v.6 no.2
    • /
    • pp.147-155
    • /
    • 2004
  • In this paper, we propose an efficient sequencing technique, namely minimum Row time scheduling (MFTS), to manage variable-Iength message transmissions for single-hop passive starcoupled WDM optical networks. By considering not only the message length but also the state of the receivers and the tuning latency, the proposed protocol can reduce the average delay of the network greatly. This paper also introduces a new channel assignment technique latency minimizing scheduling (LMS), which aims to reduce the scheduling latency. We evaluate the proposed algorithm, using extensive discrete-event simulations, by comparing its performance with shortest job first (SJF) algorithm. We find that significant improvement in average delay could be achieved by MFTS algorithm. By combining the proposed message sequencing technique with the channel selection technique, the performance of the optical network could be further improved.

Scheduling Parallel Machines for the Customer Order Problem with Fixed Batch Sequence (고정된 주문 작업순서를 갖는 소비자 주문 문제를 이한 병렬 기계의 일정계획)

  • Yang, Jaehwan
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.29 no.4
    • /
    • pp.304-311
    • /
    • 2003
  • This paper considers a new variation of scheduling problems where jobs are dispatched in batches. The variation is the case where the batch sequence is fixed. The objective is to minimize the sum of the completion times of the batches. This simple environment has a variety of real world applications such as part kitting and customer order scheduling. We show that this problem is binary NP-complete when there exist two machines. For the same problem, we develop an optimal dynamic programming (DP) algorithm which runs in pseudo-polynomial time. We finally prove the optimality of the DP algorithm.