• Title/Summary/Keyword: Scheduling

Search Result 4,886, Processing Time 0.037 seconds

An Improved DWRR Cell Scheduling Algorithm based on the QoS of Delay (지연 특성을 고려한 개선된 DWRR 셀 스케쥴링 알고리즘)

  • 곽지영;김체훤;김두현;남지승
    • Proceedings of the IEEK Conference
    • /
    • 2000.06c
    • /
    • pp.81-84
    • /
    • 2000
  • Scheduling algorithm proposed in this paper is based on both DWRR(Dynamic Weighed Round Robin) method and QLT(Queue Length Threshold) method. The proposed scheduling algorithm guarantees delay property of realtime traffic, not considered in previous DWRR method, with serving realtime traffic preferentially by using RR(Round Robin) method which service each channel equally and QLT algorithm that is dynamic time priority method. Proposed cell scheduling algorithm may increase some complexity over conventional DWRR scheme because of delay priority based cell transmission method. However, due to reliable ABR service and congesition avoidance capacity, proposed scheduling algorithm has good performance over conventional DWRR scheme. Also, delay property based cell transmission method in proposed algorithm minimizes cell delay and requires less temporary buffer size

  • PDF

Discrete event systems modeling and scheduling of flexible manufacturing systems

  • Tamura, Hiroyuki;Hatono, Itsuo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10b
    • /
    • pp.1564-1569
    • /
    • 1991
  • In this paper we describe Flexible Manufacturing Systems (FMS) using Petri nets, since Petri nets provide a powerful tool for modeling dynamical behavior of discrete concurrent processes. We deal with off-Line and on-Line rule-based scheduling of FMS. The role of the rule-base is to generate appropriate priority rule for resolving conflicts, that is, for selecting one of enabled transitions to be fired in a conflict set of the Petri nets. This corresponds to select a part type to be processed in the FMS. Towards developing more Intelligent Manufacturing Systems (IMS) we propose a conceptual framework of a futuristic intelligent scheduling system.

  • PDF

Evolutionary Network Optimization: Hybrid Genetic Algorithms Approach

  • Gen, Mitsuo
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.195-204
    • /
    • 2003
  • Network optimization is being increasingly important and fundamental issue in the fields such as engineering, computer science, operations research, transportation, telecommunication, decision support systems, manufacturing, and airline scheduling. Networks provide a useful way to modeling real world problems and are extensively used in practice. Many real world applications impose on more complex issues, such as, complex structure, complex constraints, and multiple objects to be handled simultaneously and make the problem intractable to the traditional approaches. Recent advances in evolutionary computation have made it possible to solve such practical network optimization problems. The invited talk introduces a thorough treatment of evolutionary approaches, i.e., hybrid genetic algorithms approach to network optimization problems, such as, fixed charge transportation problem, minimum cost and maximum flow problem, minimum spanning tree problem, multiple project scheduling problems, scheduling problem in FMS.

  • PDF

A Development of Decision Support System for Nurse Scheduling (일 대학병원 간호직원 근무 스케쥴링 전산화 개발 사례)

  • 최용선;이은숙;박정호
    • Journal of Korean Academy of Nursing
    • /
    • v.25 no.1
    • /
    • pp.80-87
    • /
    • 1995
  • The critical problem of nurse scheduling in the hospital is determining the day-to -day shift assignments for each nurse for the specified period in a way that satisfies the given requirements of the hospital. As nurse scheduling involves many factors and requirements, manual scheduling requires much time and effort to produce an adequate schedule. A PC - based decision support system, developed in Turbo - C/sup ++/, for nurse scheduling was introduced. The system is composed of 4 sub-systems : 1) Entering basic information for each nursing unit : 2) Generation of an appropriate initial schedule and revised schedule for a given period, maximally satisfying each nurse's duty requests : 3) Provision of variety of statistical information, and 4) Help messages for each modular function. Icons and a mouse are used for easier graphic user interface and reducing the need for typing efforts. This system can help nurses develop quick and easy schedule generation and allow more time for the patient care.

  • PDF

Development of Accurate Cutting Simulation and Feedrate Scheduling System for CNC Machining (CNC 가공의 정밀 절삭 시뮬레이션 및 이송속도 스케줄링 시스템 개발)

  • 이한울;고정훈;조동우
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2004.04a
    • /
    • pp.370-375
    • /
    • 2004
  • This paper presents an accurate cutting simulation and feedrate scheduling system for CNC machining. This system is composed of a cutting simulation part and a feedrate scheduling part. The cutting simulation part computes the geometric informations and calculates the cutting forces in CNC machining. The cutting force model using cutting-condition-independent coefficients was introduced for flat end milling and ball end milling. The feedrate scheduling part divides original blocks of NC code into smaller ones with optimized feedrates to adjust the peak value of cutting forces to reference forces. Some machining examples show that the developed system can control the cutting force at desired levels.

  • PDF

Branch and Bound Algorithm for Two-Machine Reentrant Flowshop with the Objective of Minimizing Total Flowtime (재투입이 존재하는 2단계 흐름공정에서 총 작업 흐름시간을 최소화하는 분지한계방법)

  • Choi, Seong-Woo;Shim, Sang-Oh
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.1-9
    • /
    • 2010
  • In this paper, we consider a two-machine re-entrant permutation flowshop scheduling problem with the objective of minimizing total flowtime, and suggest branch and bound algorithms for the scheduling problem. In this scheduling problem, each job must be processed twice on each machine, that is, each job should be processed on the two machines in the order of machine 1, machine 2 and then machine 1 and machine 2. In this research, based on the results of existing researches for re-entrant permutation flowshop scheduling problems, various dominance properties, lower bound and heuristic algorithm are suggested for the problem, and those are used to develop branch and bound algorithms. In the computational experiments for evaluation of the performance of the algorithms, the suggested branch and bound algorithms are tested on randomly generated test problems and results are reported.

Adaptive Scheduling in Flexible Manufacturing Systems

  • 박상찬;Narayan Raman;Michael J. Shaw
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.13 no.1
    • /
    • pp.57-57
    • /
    • 1988
  • This paper develops an adaptive scheduling policy for flexible manufacturing systems. The inductive learning methodology used for constructing this state-dependent scheduling policy provides and understanding of the relative importance of the various system parameters in determining the appropriate scheduling rule. Experimental studies indicated the superiority of the suggested approach over the alternative approach involving the repeated application of a single scheduling rule for randomly generated test problems as well as a real system, and under both stationary and nonstationary conditions. In particular, its relative performance improves further when there are frequent disruptions, and when disruptions are caused by the introduction of tiiight due date jobs, one of the most common surces of disruptions in most manufacturing systems.

Optimum Scheduling Algorithm for Job Sequence, Common Due Date Assignment and Makespan to Minimize Total Costs for Multijob in Multimachine Systems (다수(多数) 기계(機械)의 총비용(總費用)을 최소화(最小化)하는 최적작업순서, 공통납기일 및 작업완료일 결정을 위한 일정계획(日程計劃))

  • No, In-Gyu;Kim, Sang-Cheol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.1
    • /
    • pp.1-11
    • /
    • 1986
  • This research is concerned with n jobs, m parallel identical machines scheduling problem in which all jobs have a common due date. The objective of the research is to develop an optimum scheduling algorithm for determining an optimal job sequence, the optimal value of the common due date and the minimum makespan to minimize total cost. The total cost is based on the common due date cost, the earliness cost, the tardiness cost and the flow time cost of each job in the selected sequence. The optimum scheduling algorithm is developed. A numerical example is given to illustrate the scheduling algorithm.

  • PDF

Scheduling Methods for a Hybrid Flowshopwith Dynamic Order Arrival (주문 생산 방식을 따르는 혼합 흐름 공정에서의일정계획에 관한 연구)

  • Lee, Geun-Cheol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.4
    • /
    • pp.373-381
    • /
    • 2006
  • This paper considers a scheduling problem for a hybrid flowshop with dynamic order arrival. A hybrid flowshop is an extended form of a flowshop, which has serial stages like a flowshop but there can be more than one machine at each stage. In this paper, we propose a new method for the problem of scheduling with the objective of minimizing mean tardiness of orders which arrive at the shop dynamically. The proposed method is based on the list scheduling approach, however we use a more sophisticated method to prioritize lots unlike dispatching rule-based methods. To evaluate the performance of the proposed method, a simulation model of a hybrid flowshop-type production system is constructed. We implement well-known dispatching rules and the proposed methods in the simulation model. From a series of simulation tests, we show that the proposed methods perform better than other methods.

Advanced Planning and Scheduling (APS) System Implementation for Semiconductor Manufacturing : A Case at Korean Semiconductor Manufacturing Company (반도체 제조를 위한 고도화 계획 및 일정 관리 시스템 구축 : 국내 반도체 업체 사례)

  • Lim, Seung-Kil;Shin, Yong-Ho
    • IE interfaces
    • /
    • v.20 no.3
    • /
    • pp.277-287
    • /
    • 2007
  • Semiconductor manufacturing is one of the most complex and capital-intensive processes composed of several hundreds of operations. In today’s competitive business environments, it is more important than ever before to manage manufacturing process effectively to achieve better performances in terms of customer satisfaction and productivity than those of competitors. So, many semiconductor manufacturing companies implement advanced planning and scheduling (APS) system as a management tool for the complex semiconductor manufacturing process. In this study, we explain roles of production planning and scheduling in semiconductor manufacturing and principal factors that make the production planning and scheduling more difficult. We describe the APS system implementation project at Korean semiconductor manufacturing company in terms of key issues with realistic samples.