• Title/Summary/Keyword: Schedule-based

Search Result 1,318, Processing Time 0.03 seconds

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

Scheduling Management Agent using Bayesian Network based on Location Awareness (베이지안 네트워크를 이용한 위치인식 기반 일정관리 에이전트)

  • Yeon, Sun-Jung;Hwang, Hye-Jeong;Lee, Sang-Yong
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.21 no.6
    • /
    • pp.712-717
    • /
    • 2011
  • Recently, diverse schedule management agents are being researched for the efficient schedule management of smart devices users, but they remain at a confirmatory level. In order to efficiently manage user's schedules, execution of planned schedules should be monitored to help users properly execute their schedules, or feedback must be given so that when setting up new schedules, users can plan their schedule according to their schedule establishment patterns. This research proposes a schedule management agent that infers the user's behaviors by using acquired user context, and provides schedule related feedback depending on the user's behavior patterns, when users are executing their schedules or planning new schedules. For this, collected user context information is preprocessed and user's behavior is inferred by Bayesian network. Also, in order to provide feedbacks necessary for confirming the user's schedule execution and new schedule establishment, a context tree pattern matching method for the user's schedule, location and time contexts was applied, then verified with 6 weeks of user simulation in a mobile environment.

Agent-based control systemfordistributed control of AGVs (AGV의 분산제어를 위한 에이전트 기반의 제어시스템)

  • O, Seung-Jin;Jeong, Mu-Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.1117-1123
    • /
    • 2005
  • This paper deals with a new automated guided vehicle (AGV) control system for distributed control. Proposed AGV control system adapts the multi-agent technology. The system is composed of two types of controller: routing and order. The order controller is in charge of assignment of orders to AGVs. Through the bidding-based negotiation with routing controllers, the order controller assigns a new order to the proper AGV. The order controller announces order information to the routing controllers. Then the routing controllers generate a routing schedule for the order and make a bid according to the routing schedule. If the routing schedule conflicts with other AGV's one, the routing controller makes an alternative through negotiation with other routing controllers. The order controller finally evaluates bids and selects one. Each controller consists of a set of agents: negotiation agent, decision making agent and communication agent. We focus on the agent architecture and negotiation-based AGV scheduling algorithm. Proposed system is validated through an exemplary scenario.

  • PDF

A Study on the Integrated Estimation of Delivery and Manufacturing Cost for Build-to-Order Manufacturing (주문형 생산에서의 납기 및 원가 예측 연동에 관한 연구)

  • 김인준;강무진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1456-1461
    • /
    • 2004
  • Companies of Build-to-Order(BTO) strive to achieve customer responsiveness and cost efficiency simultaneously. The success of BTO depends upon the high volume production based on product plat form and delayed differentiation principle on the one hand, and upon the rapid estimation of delivery and cost for the customer orders on the other hand. Expeditious processing of a specific order requires the rearrangement of production resources and the schedule, which results in increased cost. This paper describes a cost estimation method using activity-based costing depending on the schedule change caused by urgent customer orders.

  • PDF

Resource Constrained Dynamic Multi-Projects Scheduling Based by Constraint Programming (Constraint Programming을 이용한 자원제약 동적 다중프로젝트 일정계획)

  • Lee, Hwa-Ki;Chung, Je-Won
    • IE interfaces
    • /
    • v.12 no.3
    • /
    • pp.362-373
    • /
    • 1999
  • Resource Constrained Dynamic Multi-Projects Scheduling (RCDMPS) is intended to schedule activities of two or more projects sequentially arriving at die shop under restricted resources. The aim of this paper is to develop a new problem solving method for RCDMPS to make an effect schedule based by constraint programming. The constraint-based scheduling method employs ILOG Solver which is C++ constraint reasoning library for solving complex resource management problems and ILOG Schedule which is a add-on library to ILOG Solver dedicated to solving scheduling problems. And this method interfaces with ILOG Views so that the result of scheduling displays with Gantt chart. The scheduling method suggested in this paper was applied to a company scheduling problem and compared with the other heuristic methods, and then it shows that the new scheduling system has more preference.

  • PDF

A Study on the development of Schedule based Architectural construction Simulation System (공정관리 프로세스 중심의 시뮬레이션 시스템 개발방향에 관한 연구)

  • Jo, Jin;Kim, Sun-Hyo;Park, Jong-Bae;Kwon, O-Cheol;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.353-356
    • /
    • 2007
  • The purpose of this study is to propose development of Schedule based Architectural Construction Simulation System. In this study (or paper), we analysis the simulation system concept ant) its characteristics, and analyze the main functions simulation system and the range of functions which are already used currently. Therefore, we could find the limit of the present simulation system. and propose more effective solutions to develop Schedule based Architectural Construction Simulation System.

  • PDF

Tiered-MAC: An Energy-Efficient Hybrid MAC Protocol for Wireless Sensor Networks (Tiered-MAC: 무선 센서 네트워크를 위한 에너지 효율적인 하이브리드 MAC 프로토콜)

  • Lee, Han-Sun;Chung, Kwang-Sue
    • Journal of KIISE:Information Networking
    • /
    • v.37 no.1
    • /
    • pp.42-49
    • /
    • 2010
  • Because sensor nodes operate with the limited power based on battery which cannot be easily replaced, energy efficiency is a fundamental issue pervading the design of communication protocols developed for wireless sensor networks. In wireless networks, energy efficient MAC protocols can usually be described as being either a contention-based protocol or a schedule-based protocol. It is suitable to use combination of both contention-based protocol and schedule-based protocol, because the strengths and weaknesses of these protocols are contrary to each other. In this paper, in order to minimize energy consumption of sensor nodes and maximize network lifetime, we propose a new MAC protocol called "Tiered-MAC" The Tiered-MAC uses a schedule-based TDMA inside maximum transmission range of sink node and a contention-based CSMA otherwise. Therefore, by efficiently managing the congested traffic area, the Tiered-MAC reduces the unnecessary energy consumption. Based on the ns-2 simulation result, we prove that the Tiered-MAC improves the energy-efficiency of sensor network nodes.

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

Project Schedule Notification and Issue Tracking System Based on Social Networking Service on a Smartphone (스마트폰 상에서 프로젝트 관리를 위한 소셜 네트워킹 서비스 기반의 일정 통지 및 이슈추적 시스템)

  • Kang, Dae-Ki;Chang, Won-Tae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.3
    • /
    • pp.669-677
    • /
    • 2010
  • In this paper, we propose a novel project schedule notification and issue tracking system based on a social networking service for project management on a smartphone. The proposed system has a server subsystem and a client subsystem. The server is in charge of enabling a deadline notification and an issue tracking of the project to project participants by exploiting a legacy social networking service. The client running on a smartphone displays timelines of the project schedule using Gantt chart and let the project participant edit their schedule. The proposed system combines the mobility of smartphones and the connectivity of social networking services and apply them to schedule notification and issue tracking, which demonstrates a novel usage of social networking services.