• Title/Summary/Keyword: Schedule-Cost Integration

Search Result 41, Processing Time 0.025 seconds

Module Suggestion to Develop an Integration System of Schedule and Change Control (공정 및 변경관리 통합시스템 개발을 위한 모듈 제안에 관한 연구)

  • So Young-Sung;Oh Seung-Jun;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.393-396
    • /
    • 2002
  • Purpose of this study is to suggest some modules to integrate schedule and change control. The study has been performed through the process of literature review, effect comparison of being not integrated and integrated of the schedule and change control, and finally suggest new integrated modules. The results of this study are as follows: 1) Suggestion of a Predicted Change Information Control Module: This nodule can be used to assess the impact of changes in advance and to prepare counteraction. 2) Suggestion of a Change Information Control Module: This module is used to update current schedule for the realized changes. 3) Suggestion of a Revision History Maintenance Module: This module is used to record schedule and cost revision history and to analyze the overall change trend.

  • PDF

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city - (BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 -)

  • Lee, Hae-Chan;Kim, Jin-Man;Choi, Cheol-Ho;Song, Sang-Hoon
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

Development of Real Time Simulation Environment Based on DEVS Formalism Applicable to Avionics System Integration Laboratory (항공용 SIL에 적용 가능한 DEVS 형식론 기반의 시뮬레이션 환경 개발)

  • Seo, Min-gi;Shin, Ju-chul;Baek, Gyong-hoon;Kim, Seong-woo
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.5
    • /
    • pp.345-351
    • /
    • 2019
  • Avionics System Integration Laboratory is an integrated test environment for the integration and the verification of avionics systems. Recently, in order to fully consider the requirements verification of avionics system from the aspect of the entire system integration, the participation in the development of the SIL field is advanced from the requirement analysis of the aircraft. Efforts are being made to minimize the cost and the period of development of a SIL so that it does not affect the overall schedule of the aircraft development. We propose the avionics simulation model framework (ASMF) based on the modeling formalism applicable to SIL in order to reduce development period/cost and increase maintenance by standardizing the modeling methods of SIL.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

A Case Study of the Effects of Cloud System on the Efficiency Improvement and Cost-saving of Production Processes (클라우드 시스템이 기업의 공정관리 효율성과 비용절감에 미치는 영향 - J사(社) 사례(事例)를 중심(中心)으로 -)

  • Lee, Bo-Young;Park, Yong-Tae
    • The Journal of Information Systems
    • /
    • v.26 no.2
    • /
    • pp.143-164
    • /
    • 2017
  • Purpose The purpose of this study is to investigate to investigate the effects of cloud system on the efficiency improvement and cost-saving of production processes. It also tries to provide small- and medium-sized companies and IT practitioners with a practical guideline for a successful implementation of could systems. Design/methodology/approach This study was conducted by observing and analyzing a case of implementing a cloud system at a small-sized company having multiple job sites in terms of the improvement in data-sharing efficiency and cost-saving of production processes. Findings This study found that cloud system was an effective way of sharing data between and among production processes of geographically scattered job sites and thus, helped the company to remedy problems of work schedule and load-balance along sequential production processes. Cloud system also allowed the company to reduce the number of visits made by 3-inspectors to four job sites by 75% and the personnel cost related to inspectors' site visit.

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공기-비용 최적화 모델 개발)

  • Lee, Sihyun;Lee, Seounghyun;Son, Jaeho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.43-51
    • /
    • 2016
  • Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.