• 제목/요약/키워드: Schedule generator

검색결과 41건 처리시간 0.025초

경쟁시장에서 보수계획의 수익영향과 최적보수 방향 (A Study on the Effects of Maintenance Schedule in a Competitive Electricity Market)

  • 김창수;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.593-595
    • /
    • 2003
  • The introduction of electricity industry provides generators incentives to recover the related cost through the market. Hence, the generator should sell his/her electricity at high market-clearing price with optimal operation of his/her power plant. The maintenance of power plant is the most critical factor in affecting generators' decision-making. This paper analyzes technique for establishing maintenance schedule reflecting recovery cost and considers differences in monthly load pattern in minimizing LOLP.

  • PDF

송전계통을 고려한 발전기 예방정비계획 방법론에 관한 연구 (Method of Generator Maintenance Scheduling Considering Transmission System)

  • 한석만;신영균;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.104-106
    • /
    • 2004
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. In this paper, we divide maintenance schedule problem into master-problem and sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem.

  • PDF

배선 및 선박운항일정계획에 관한 연구 -유조선의 운항일정계획을 중심으로- (A Study on Cargo Ships Routing and Scheduling Emphasis on Crude Oil Tanker Scheduling Problems)

  • 허일
    • 한국항해학회지
    • /
    • 제14권1호
    • /
    • pp.21-38
    • /
    • 1990
  • This paper discusses the various modes of operations of cargo ships which are liner operations, tramp shipping and industrial operations, and mathematical programming, simulation , and heuristic method that can be used to solve ships routing and scheduling problems for each of these operations. In particular, this paper put emphasis on a crude oil tanker scheduling problem. The problem is to achieve an optimal sequence of cargoes or an optimal schedule for each ship in a given fleet during a given period. Each cargo is characterized by its type, size, loading and discharging ports, loading and discharging dates, cost, and revenue. Our approach is to enumerate all feasible candidate schedate schedules for each ship, where a candidate schedule specifies a set of cargoes that can be feasibly carried by a ship within the planning horizon , together with loading and discharging dates for each cargo in the set. Provided that candidate schedules have been generated for each ship, the problem of choosing from these an optimal schedule for each ship is formulated as a set partitioning problem, a set packing problem, and a integer generalized network problem respectively. We write the PASCAL programs for schedule generator and apply our approach to the crude oil tanker scheduling problem similar to a realistic system.

  • PDF

대형 터빈-발전기에서의 유체 불안정진동 해소사례 (A case study on the vibration by fluid induced instability at large steam turbine-generator)

  • 한승우;노철우;김인철;주인국;김명식
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 추계학술대회논문집
    • /
    • pp.1066-1071
    • /
    • 2007
  • This case study refers to turbine-generator with retrofitted turbine rotor. Vibration problem occurring after the retrofit was mainly due to high vibration from exciter side. However, repeated test run and operation during scheduled maintenance caused high vibration from generator bearing, and post-overhaul test run before turbine vibration correction caused oil whip on the bearing. This case study shows how to analyze vibration condition of high turbine generator vibration detected during the post-overhaul test run and vibration condition of offline and online data to reflect it on establishing maintenance schedule and overhaul correction procedure. Vibration data could be acquired during steady load operation or even with varying speed and load. Each data is important for machinery condition evaluation. This case study shows that the vibration data during extreme condition is the key factor in analysis, which helps to find the machinery problem.

  • PDF

대형 터빈-발전기에서의 유체 불안정진동 해소사례 (A Case Study on the Vibration by Fluid Induced Instability at Large Steam Turbine-generator)

  • 한승우;노철우;유무상;김인철;주인국;김명식
    • 한국소음진동공학회논문집
    • /
    • 제18권2호
    • /
    • pp.238-246
    • /
    • 2008
  • This case study refers to turbine-generator with retrofitted turbine rotor. Vibration problem occurring after the retrofit was mainly due to high vibration from exciter side. However, repeated test run and operation during scheduled maintenance caused high vibration from generator bearing, and post-overhaul test run before turbine vibration correction caused oil whip on the bearing. This case study shows how to analyze vibration condition of high turbine generator vibration detected during the post-overhaul test run and vibration condition of offline and online data to reflect it on establishing maintenance schedule and overhaul correction procedure. Vibration data could be acquired during steady load operation or even with varying speed and load. Each data is important for machinery condition evaluation. This case study shows that the vibration data during extreme condition is the key factor in analysis, which helps to find the machinery problem.

비협조 동적게임이론을 이용한 경쟁적 전력시장의 발전기 보수계획 전략 분석 (An Improved Generation Maintenance Strategy Analysis in Competitive Electricity Markets Using Non-Cooperative Dynamic Game Theory)

  • 김진호;박종배;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권9호
    • /
    • pp.542-549
    • /
    • 2003
  • In this paper, a novel approach to generator maintenance scheduling strategy in competitive electricity markets based on non-cooperative dynamic game theory is presented. The main contribution of this study can be considered to develop a game-theoretic framework for analyzing strategic behaviors of generating companies (Gencos) from the standpoints of the generator maintenance-scheduling problem (GMP) game. To obtain the equilibrium solution for the GMP game, the GMP problem is formulated as a dynamic non-cooperative game with complete information. In the proposed game, the players correspond to the profit-maximizing individual Gencos, and the payoff of each player is defined as the profits from the energy market. The optimal maintenance schedule is defined by subgame perfect equilibrium of the game. Numerical results for two-Genco system by both proposed method and conventional one are used to demonstrate that 1) the proposed framework can be successfully applied in analyzing the strategic behaviors of each Genco in changed markets and 2) both methods show considerably different results in terms of market stability or system reliability. The result indicates that generator maintenance scheduling strategy is one of the crucial strategic decision-makings whereby Gencos can maximize their profits in a competitive market environment.

TWBP 시장에서 계통운용자의 발전설비 예방정비계획 조정 알고리즘에 관한 연구 (A study on generator maintenance schedule coordination of system operator in WBP markets)

  • 한석만;정구형;김발호;박종배;차준민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.740-742
    • /
    • 2004
  • In TWBP markets, ISO determines the maintenance schedule based on Gencos' and Transcos' offers under reasonable criterion. This paper presents ISO's alternative procedure to coordinate maintenance schedules submitted by Gencos and Transcos. ISO's coordination procedure is formulated as an optimization problem that minimizes expected losses in Gencos' revenue subject to system reserve requirement.

  • PDF

발전기 예방정비계획 전산모형 개발 (Development of Generator Maintenance Scheduling Program)

  • 박종배;정윤원;주행로;이명희;신점구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.216-217
    • /
    • 2006
  • This paper presents development of program for generator maintenance scheduling. The maintenance scheduling of generating units is a dynamic discrete combinatorial optimization problem with constraints to determine the optimal maintenance periods of each generating units for a given planning periods. The developed program is designed so as to provide the maintenance schedule satisfying the operating reserve margin levelization and the procurement of proper reliability. In order to verify the effectiveness of the developed program, the numerical study has been performed with the practical data in 2005.

  • PDF

핵발전소 증기발생기의 초음파 비파괴 평가를 위한 영상처리 소프트웨어 개발 (Development of Image Processing S/W for UT-NDE of Steam Generator of Nuclear Power Plant)

  • 이영석
    • 한국산학기술학회:학술대회논문집
    • /
    • 한국산학기술학회 2006년도 춘계학술발표논문집
    • /
    • pp.217-222
    • /
    • 2006
  • This paper describes a development of ultrasonic examination analysis software to analyze steam generator of nuclear power plant. The developed software includes classical analysis method such as A, B, C and D-scan images. This software provides the information of shape, depth, size and position of flaws. To do such, we obtain raw data from specimens and/or real pipeline of power plants and, modify the obtained ultrasonic 1-dimensional data according to prepared software design schedule. The developed analysis software is applied to specimens containing various flaws with known dimensions. The results of applications showed that the developed software provided accurate and enhanced images of flaws on various specimens.

  • PDF

대규모 시간전개형 네트워크에서의 효율적 최대유량 해법 (Efficient Maximal Flow Algorithms in a Large Time-Expanded Network)

  • 이달상
    • 산업경영시스템학회지
    • /
    • 제19권37호
    • /
    • pp.211-220
    • /
    • 1996
  • We consider the problem of scheduling a maximal amount of additional, low priority transport through a large multiperiod network, given that we may not interfere with an existing schedule for high priority transport. The problem is transformed into the Time-Expanded network(TENET) without traverse time using TENET Generator (TENETGEN). We describe two specialized heuristic algorithms that guarantee the optimal solutions and show the effectiveness of them by comparing quite favorably with Dinic.

  • PDF