• 제목/요약/키워드: Schedule generator

검색결과 40건 처리시간 0.019초

생산일정계획 성능향상을 위한 2단계 휴리스틱 방법의 개발 (Development of a Two-Phase Heuristic Method for the Enhancement of a Production Schedule)

  • 홍윤호;김승권;김선욱;이준열
    • 대한산업공학회지
    • /
    • 제20권3호
    • /
    • pp.65-77
    • /
    • 1994
  • There are so many situations in which production schedules need to be rescheduled, due to the uncertainty or dynamic characteristics existing in manufacturing environment. Under the circumstances, it is necessary to build a system which helps a schedule manager understand the dynamic situations and reflect his insight into the system easily. We developed a system that can improve a production schedule. The system consists of a schedule editor and a schedule generator. The schedule editor, a rule-based system, always keeps a schedule feasible by keeping track of local changes in the revised one. The schedule generator consists of a two-phase heuristic method. In the lst phase it generates a schedule by a priority rule with Giffler and Thompson algorithm then it improves the performance in terms of the makespan in the 2nd phase. Experimental results show that, most of the times, the system generates a better schedule than the one with ordinary priority rules only.

  • PDF

경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구 (Generator Maintenance Scheduling of System Operator in Competitive Electricity Markets)

  • 한석만;신영균;정구형;김강원;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권8호
    • /
    • pp.477-483
    • /
    • 2004
  • In competitive electricity markets, maintenance schedule is submitted by generation companies (GENCOs) and transmission companies (TRANSCOs), and coordinated by Independent System Operator (ISO) with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule. In this paper, it is focused on modeling a coordination algorithm by ISO for the maintenance schedule based on the Simulated Annealing algorithm. The proposed model employs the minimum information such as generator capacity, forced outage rate and generator maintenance schedules. The objective function of this model represents minimization of adjustment on schedules submitted by GENCOs.

경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구 (A study on generator maintenance scheduling of system operator in competitive electricity markets)

  • 한석만;신영균;김발호;박종배;차준민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.447-449
    • /
    • 2003
  • In competitive electricity markets, maintenance schedule is submitted by Genco's and Transco's, and coordinated by ISO with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule.

  • PDF

송전계통을 고려한 계통운용자의 발전기 예방정비계획 알고리즘에 관한 연구 (An Algorithm for Generator Maintenance Scheduling Considering Transmission System)

  • 한석만;신영균;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권7호
    • /
    • pp.352-357
    • /
    • 2005
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules when the collective maintenance schedule reported to 50 by Gencos not satisfy the specified operating criteria, such as system reliability or supply adequacy. This paper presented a method that divides generator maintenance scheduling of the 50 into a master-problem and a sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem. And, the 50 should use the open information only, because the information such as cost function of a generator and bidding Price is highly crucial for the strategies of profit maximization.

TWBP 시장에서 계통운용자의 발전설비 예방정비계획 조정 알고리즘에 관한 연구 (Coordination of Generator Maintenance Schedule in Two-Way Bidding Pools)

  • 한석만;정구형;김발호;박종배;차준민
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권12호
    • /
    • pp.685-688
    • /
    • 2004
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. The SO's coordination usually involves sorts of financial conflict among Genco's. This paper proposes a coordination algorithm which minimizes the total financial loss of Genco's while satisfying the required operating criteria.

기계 가용성 제약을 고려한 흐름공정 상황하에서 Makespan을 최소화하기 위한 향상된 유전 알고리듬 (An Improved Genetic Algorithm to Minimize Makespan in Flowshop with Availability Constraints)

  • 이경화;정인재
    • 산업경영시스템학회지
    • /
    • 제30권1호
    • /
    • pp.115-121
    • /
    • 2007
  • In this paper, we study flowshop scheduling problems with availability constraints. In such problems, n jobs have to be scheduled on m machines sequentially under assumption that the machines are unavailable during some periods of planning horizon. The objective of the problem is to find a non-permutation schedule which minimizes the makespan. As a solution procedure, we propose an improved genetic algorithm which utilizes a look-ahead schedule generator to find good solutions in a reasonable time Computational experiments show that the proposed genetic algorithm outperforms the existing genetic algorithm.

한국철도에서의 계획단계 동력차 스케줄링 최적화 및 전문가 지원시스템의 프로토타입 프로그램 개발에 관한 연구 (Optimization of Planning-Level Locomotive Scheduling at KNR and Development of Its Implementation Prototype Program)

  • 문대섭;김동오
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.46-53
    • /
    • 1999
  • As of July 1999, i,185 lomocotives(excluding metropolitan area electric locomotives) are in Korean National Railroad(KNR). With this limited number of resources assigning locomotives to each trains of timetable is very important in the entire railway management point of view because schedule can be regarded as goods in transportation industry. On a simple rail network, it is rather easier to assign proper locomotives to trains with the experience of operating experts and get optimal assignment solution. However, as the network is getting bigger and complicated, the number of trains and corresponding locomotives will be dramatically increased to rover all the demands required to service all of the trains in timetable. There will be also numerous operational constraints to be considered. Assigning proper locomotives to trains and building optimal cyclic rotations of locomotive routings will result in increasing efficiency of schedule and giving a guarantee of more profit. The purpose of this study is two fold: (1) we consider a planning-level locomotive scheduling problem with the objective of minimizing the wasting cost under various practical constraints and (2) development of implementation prototype program of its assigning result. Not like other countries, i.e. Canada, Sweden, Korean railroad operates on n daily schedule basis. The objective is to find optimal assignment of locomotives of different types to each trains, which minimize the wasting cost. This problem is defined on a planning stage and therefore, does not consider operational constraints such as maintenance and emergency cases. Due to the large scale of the problem size and complexity, we approach with heuristic methods and column generation to find optimal solution. The locomotive scheduling prototype consists of several modules including database, optimization engine and diagram generator. The optimization engine solves MIP model and provides an optimal locomotive schedule using specified optimization algorithms. A cyclic locomotive route diagram can be generated using this optimal schedule through the diagram generator.

  • PDF

경쟁적 전력시장에서 발전기 예방정비계획 알고리즘에 관한 연구 (A study on generator maintenance scheduling in competitive electricity markets)

  • 한석만;신영균;김발호;박종배;차준민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.643-645
    • /
    • 2003
  • In competitive electricity markets, each GenCo establishes generator maintenance schedule and submits to ISO those. Then, ISO reviews and arranges maintenance schedule of each GenCo to meet the standard for reliability. This paper presents the new optimization model which can apply to competitive electricity markets. The object of this model is to minimize schedules variation of each GenCo and to satisfy system reliability.

  • PDF

시간 전개형 네트워크를 이용한 선로의 최대흐름 스케쥴링 (A maximal-Flow Scheduling Using time Expanded Network in a track)

  • 이달상;김만식
    • 대한교통학회지
    • /
    • 제8권2호
    • /
    • pp.67-75
    • /
    • 1990
  • This paper treats the problem to schedule for trains with how transit priority so as to maximizing the number that can be sent during given time periods without interfering with the fixed schedule for train with high transit priority in a track. We transform the this problem into Time Expanded Network without traverse time through application of Ford and Fulkerson Model and construct the Enumeration Algorithm for solutions using TENET Generator (TENETGEN). Finally, we compare our algorithm with Dinic's Maximal-Flow Algorithm and examine the avaliability of our procedures in personal computer.

  • PDF

통과 우선순위가 있는 선로의 최대 흐름문제 (Maximal-Flow-Problem with transit priority in a track)

  • 이달상;김만식
    • 산업경영시스템학회지
    • /
    • 제13권21호
    • /
    • pp.111-117
    • /
    • 1990
  • This paper treats the problem to schedule for train with low transit priority so as to maximizing the number that can be sent during given time without interfering with the fixed schedule for train with high transit priority in a track. We transform the this problem into Time-Expanded Network without traverse time through application of Ford-Fulkerson Model, develop a TENET GENerator(TENETGEN) and obtain the data of TENET using developed TENETGEN. Finally, we seek the optimal solution to these data with Dinic's Maximal-Flow Algorithm and examine the availability of our procedures in personal computer.

  • PDF