HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
Nuclear Engineering and Technology
/
제47권3호
/
pp.362-379
/
2015
In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.
The 2th International Conference on Construction Engineering and Project Management
/
pp.520-529
/
2007
Apportioning responsibilities of concurrent delay to the owner and the contractor is a difficult task, due to the sophisticate nature both in the schedule and in the factors that cause the delay. This research attempts to develop a simplified yet systematic approach that can be used for a fair apportionment of concurrent delay. A concurrent delay is defined herein as when the contractor and the owner have both caused independent critical path delays during the same approximate time period. Incorporating the concepts of windows analysis and critical path method (CPM), the developed approach has three "windowing of delay" steps to quickly apportion the delay in each of these windows, and a fourth step to sum up those apportioned delays to obtain each party's final responsibilities. This developed approach is found to be simple and effective at this stage; it will be tested against real cases in the near future.
오피스 건축물의 리모델링 사업에서, 신축과는 다른 리모델링 사업의 다양한 리스크로 인해 공기가 지연되는 사례가 빈번하게 보고되고 있다. 이에 본 연구에서는 리모델링 프로젝트의 리스크 요인들과 리모델링 공사의 작업별 공기지연 발생가능성의 관계를 분석하고자 수행되었다. 리모델링 사업의 경험이 있는 29명의 전문가 면담결과의 과학적 통계적 분석을 통해, 리모델링 사업의 리스크 요인과 그로 인한 작업별 공기지연 가능성을 크게 3가지 측면에서 분석하였다. 즉, (i) 리모델링 공사의 작업별 공기지연 가능성, (ii) 리모델링 공사의 리스크 요인별 중요도, (iii) 리모델링 공사의 공기지연에 영향을 미치는 리스크 요인 등 세가지 분석결과를 제시하였다.
The circadian system represents a temporal order which is mediated by the mutual coupling of oscillators and by the synchronizing effects of zeitgebers. It is known that well-being of man depends partly on the maintenance of this order, and that repeated or long lasting disturbances to it such as shift work will Cause harmful effects. This study was a quasi-experimental study to test the effect of shift directions for the clinical nurses on the circadian rhythm. Fourteen nurses working at the general units of Y hospital were selected according to the established criteria. Fourteen subjects were assigned to a weekly shift but the directions of shift work were phase delay first and then phase advance or vice versa. Oral temperature, total sleeping time, frequency of sleep-wake cycle, fatigue, mental performance, and physical symptom were measured during these days except holidays. The data collection period was from April 26, 1993 to July 3, 1993. MANOVA and Wilcoxon signed rank test were used for statistical analysis. The results are summarized as follows. 1. Having worked on evening and night shifts in either phase delay or phase advance schedules, temperature rhythms of shift workers were gradually adapted to the new sleep-wake cycles. A complete adaptation to work on the night shift was achieved the sixth day of the night shift in the phase delay schedule compared to the partial adaptation to the work on the night shift in the phase advance schedule. Accordingly, by putting evening shift between day and night shifts, it will be possible for circadian rhythm to adapt easily to the night shift. 2. There were differences in the total sleeping time, frequency of steep-wake cycle, fatigue, and physical symptom except for mental performance between night shift and day, evening shift. This indicates further that shift workers working on the night shift have a hard time adapting to the shift work compared to the other shifts. 3. Evaluating all the acrophases of temperature rhythm either in phase delay or phase ad-vance schedules, it was shown that night to evening shift in the phase ad-vance schedule revealed the smallest phase move. Also phase advance schedule showed poorer adaptation to shift work than phase delay schedule in connection with total sleeping time, frequency of sleep-wake cycle, fatigue, mental performance, and physical symptom. It is suggested, taken together, these findings reflect that phase delay schedule facilitated the degree of adjustment to the shift work compared to the phase advance schedule.
건설공사에서의 공기지연은 공사금액 증가, 발주처 클레임, 무리한 공기단축에 따른 건설공사의 질 하락 등 건설프로젝트에 악영향을 끼치는 주요 리스크 요인이다. 기존 연구에서는 공기지연 리스크의 중요도 및 우선순위를 파악하고 중요도에 따라 공정을 관리하였으나, 공기지연 리스크의 심도는 데이터 수집의 한계 등으로 정량화 연구가 미흡하다. 따라서 본 연구에서는 BERT (Bidirectional Encoder Representations from Transformers) 언어 모델을 활용하여 비정형데이터로 저장된 공사일지의 작업내용을 분석 가능한 WBS (Work Breakdown Structure) 기반의 정형데이터로 변환하고 리스크 분류 및 도출 체계, 공정계획에 사용가능한 리스크 발생확률, 리스크 확률분포(심도)의 정량화 방안을 제시하였다. 제안된 프로세스를 고속도로공사 8개 공구에 적용하여, 39개 세부 공중 중 8개의 세부 공종에서 75건의 우천 공기지연 리스크를 도출하였다. K-S 검정을 통해 4개 공종에서 유의미한 확률분포를 도출하였으며 위험도를 비교하였다. 향후 본 연구에서 제시된 프로세스는 시공단계에서 발생하는 다양한 공기지연 요인의 도출 및 심도 정량화에 적용될 수 있을 것으로 기대된다.
공공건설사업은 수많은 공종의 집합으로 이루어져 있어 공사중단, 공사지체 등으로 인한 공기지연이 필연적으로 발생하고 있다. 공기지연이 발생하는 경우에 지연일수를 산출하는 방법은 많은 연구를 통해 제시되고 있으나, 공기지연에 따른 계약금액조정에 대해서는 구체적으로 언급하고 있지 않기 때문에 실제 공공건설사업에 적용하는 데는 어려움이 있다. FIDIC계약조건에 비해 회계예규인 공사계약일반조건에 불분명한 문제를 안는 있는 것으로 나타났다. 따라서 본 연구는 공공건설프로젝트에 국한하여 공사 수행중에 공기관련 설계변경사유가 발생될 경우 공기연장 절차를 보다 투명하게 하고, 계약금액산정의 기준이 되는 구간에 대한 기준을 명확히 하기 위한 방안으로 명확한 공기연장사유, 수정공정표제출 등에 대한 방안을 제시하였다.
In large station with high density traffic, trains can be hardly controlled by CTC but by station dispatcher because CTC has difficulties in monitoring all states of affairs happening within each station such as departures, arrivals of many trains from different lines and shunting of trains to move between yards and platforms, etc. Therefore the station's dispatcher has to make quick decision about how to reschedule the times and routes for all the trains scheduled within a specific time window. And such decision becomes harder when an unexpected delay occurs because a delay occurring in a train propagates other trains as time goes on. Generally, it is called the conflict detection and resolution to adjust beforehand the distorted schedule due to a delay to original schedule. Our research is different from the state of the arts in that ours determines simultaneously the routes and the times of arrival and departure of trains, although others do only the arrival and departure time of the trains without considering the alternative routes and shunting of the station. This study suggests a mathematical approach for how to detect in advance and resolve efficiently the conflicts occurring within a station and it will be shown how to reduce delay using our approach by means of analysing the schedule of ChyungRyangRi station.
건설공사 한 프로젝트의 전체공기는 개별 작업들이 수행된 날짜의 합이라 할 수 있다. 개별 작업들에서 지연이 발생할 경우 전체 공기 또한 늦어지기 마련이다. 이러한 개별 작업의 계획상에서 작업이 수행될 확률을 높인다면 프로젝트의 공기달성 확률 또한 높아지게 될 것이다. 따라서, 계획상의 작업 실행여부 확인을 위하여 건설 생산프로세스에서 각 작업의 수행을 저해하는 제약요인을 도출하여 작업여건분석을 한다. 작업여건분석을 통해 저해요인 사전 제거와 작업간의 상호의존성을 파악으로 작성된 개별 작업계획들의 실행 가능성 확임함으로써 공사전체의 공기지연을 방지하는 체계를 구축하고자 한다.
Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
국제학술발표논문집
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.616-623
/
2022
Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.
대규모 병원정보시스템 프로젝트가 계획 대비 지연되는 경우가 종종 발생하고 있다. 따라서 프로젝트 관리 측면에서 일정 지연을 촉발하는 원인을 검토하고 지연 유발 요인들 간 인과관계 분석이 필요하다. 본 연구는 근거이론 방법론을 활용하여 병원정보시스템 개발 프로젝트 사례에 대한 일정 지연 요인을 발견하고 이들 간의 인과관계를 파악하고자 한다. 연구 결과, '비현실적 일정 수립'은 도미노 현상과 같이 전반적인 일정 지연에 영향을 미치고, '기존 시스템 분석 미흡'은 분석 품질의 저하를 야기하는 반면 '서브시스템 통합 인터페이스 부실'은 설계 품질의 저하로 이어졌다. 본 연구는 학술적인 측면에서 프로젝트 지연에 영향을 미치는 요인을 찾아내고 지연 요인들 간의 인과 관계를 분석하였으며, 실무적 관점에서는 System Integration (SI) 기업, 병원, 프로젝트 관리자 입장에서 프로젝트 일정 지연을 최소화할 수 있는 방안을 제시한 점에 의의가 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.