Project Scheduling Problem with Resource Constraints Minimizing Cost (자원비용을 고려한 프로젝트 스케듈링에 관한 연구)

  • 서순근;최종덕
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.23
    • /
    • pp.19-25
    • /
    • 1991
  • In this paper, constrained resource project scheduling problems schedule project activities subject to finite constraints on the availability of non-storable resource. Further, resources are assumed to be available per period in constant amounts, and are also demanded by an activity in constant amounts throughout the duration of the activity. We describe formulation which minimizes the combined cost of fluctuations in resource demand and delay of project completion. Cost bounding procedures are augmented by dominance relationships presented as theorems. This paper presents algorithm for solving the problem. And numerical examples are presented. Sensitivity analysis to evaluate the effect of changes of cost efficients is conducted.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

A Study of Complaint and Conflict Factors in Construction Projects (건설사업의 민원 및 갈등 요인 도출에 관한 연구)

  • Lee, Ju-Hui;Mun, Jun-bu;Lee, Chang-jun;Yun, Sung-min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.279-280
    • /
    • 2021
  • The conflict is gradually increasing and becoming more serious in Korea. Especially, there are many conflict among stakeholders in public construction projects and its economic, social effects are enormous. This negatively affects the performance of construction projects, such as schedule delay and increasing construction costs. Complaints are often extended to public conflicts so that complaints have to be considered for conflict management. However, complaints and conflicts were distinguished and have been studied differently in previous studies. In this research, the literature that analyzed complaints and conflict factors was reviewed, and the complaint that included the conflict factors were categorized and derived.

  • PDF

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

Operating System level Dynamic Power Management for Robot (로봇을 위한 운영체제 수준의 동적 전력 관리)

  • Choi Seungmin;Chae Sooik
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.42 no.5 s.335
    • /
    • pp.63-72
    • /
    • 2005
  • This paper describes a new approach for the operating system level power management to reduce the energy consumed in the IO devices in a robot platform, which provides various functions such as navigation, multimedia application, and wireless communication. The policy proposed in the paper, which was named the Energy-Aware Job Schedule (EAJS), rearranges the jobs scattered so that the idle periods of the devices are clustered into a time period and the devices are shut down during their idle period. The EAJS selects a schedule that consumes the minimum energyamong the schedules that satisfy the buffer and time constraints. Note that the burst job execution needs a larger memory buffer and causes a longer time delay from generating the job request until to finishing it. A prototype of the EAJS is implemented on the Linux kernel that manages the robot system. The experiment results show that a maximum $44\%$ power saving on a DSP and a wireless LAN card can be obtained with the EAJS.

The Problem and Improvement Solution Regarding the Inquiry of Sample (검체 문의에 관한 문제점 및 개선방안)

  • Yang, Joon-Ho;Seo, Jung-Mi;Song, Hoon-Gang;Kim, Eun-Jung;Kim, Chang-Ho
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.13 no.3
    • /
    • pp.193-195
    • /
    • 2009
  • Purpose: The work flow of international hospital's laboratory consists of rapid test and result report at the present day. However, the frequent inquiry of sample, which cause affairs to delay and efficiency to Lower, affects medical examination. In order to promote work's efficiency, we should improve the problem and make work smooth between a laboratory, outs and ward. Materials and Methods: This study runs as follows. First, Investigating test result, test schedule, test receipt, quick result, etc through the activity required from September to November 2007 about the inquiry of sample. After analysis of the problem in December, remaking the test schedule for improvement solution and reporting it to outs and ward. When the result is retest and dilution, we directly fill in a result space with the result situation of the patient to let them know beforehand. We also, prevent the omission of the result through checking the sample list and discriminate in vivo from in vitro by changing the laboratory's telephone number. We have improved the problem about the inquiry of sample through valuation and analysis since the improvement activity from January to March 2008. Result: The case about the frequent inquiry of sample has reduced by 57.8%. this improvement activity indicated that p-value<0.05 was statistically significant through paired t-test. This activity make study smooth and we rapidly report the result. Conclusion: By reducing the case regarding the inquiry of sample, work discontinuation, and concentration reduction, the work efficiency was increased.

  • PDF

Competitive Advantage Strategy of Construction Duration by SWOT Analysis (SWOT 분석을 통한 건설기업의 공기경쟁력 강화 전략)

  • Kim, Sun-Kuk;Lee, Hyun-Soo;Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.109-117
    • /
    • 2006
  • Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.

A Development of an Integrated Inventory Managing System for Steel-Plates (강재 통합 관리 시스템 개발)

  • Lee, Seok Hyun;Yu, Ji Hun;Kim, Hyun Chul;Jang, Seok Min;Lim, Rae Soo;Kim, Ho Kyeong;Heo, Joo Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.2
    • /
    • pp.130-137
    • /
    • 2014
  • As one of the largest shipbuilding company in the world, STX Offshore & Shipbuilding currently developed an inventory managing system for steel-plates, which is applied to their steel stock yard. In a traditional way to manage steel yard, almost every work has been done by manually. The manual steel-plate piling process caused some problems such as process delay due to piling errors and the uncertainty of work plan due to lack of information. To solve these problems, we developed an integrated inventory managing system based on real-time crane tracking system which automatically updates steel-plates' piling status. We built the integrated steel-plate database, developed several programs including steel-plate input program, real-time steel-plate monitoring program and steel-yard management program, and constructed hardware system for tracking magnetic cranes. As a result, a supervisor of steel-yard can manage the inventory of steel-plates efficiently and furthermore plan an efficient piling schedule and crane working schedule.