• Title/Summary/Keyword: Schedule Simulator

Search Result 21, Processing Time 0.025 seconds

Development of Rollgap Simulator and Its Application to Draft Schedule Adjustment (롤갭 시뮬레이터의 개발과 패스스케쥴 개선)

  • Ahn Jaehwan;Lee Youngho;Lee In-Woo
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2004.08a
    • /
    • pp.163-172
    • /
    • 2004
  • A fast, accurate model for calculating roll gap variables are critical to the implementation of computer based automation systems for cold rolling mills. Based on the work of Fleck and Johnson, rollgap simulator with non-circular arc model was developed using the influence function. This developed model is capable of predicting values of force, torque and slip which can be applied over the wide range of rolling conditions including cold rolling/DR/temper mill with high execution speed. Friction coefficient was obtained as a function of operation conditions through analyzing measured data. After combination of rollgap simulator with production strategy, draft schedule for No.3 RCM (Reversible Cold Rolling Mill) in Incheon works of Dongbu Steel was developed. This draft schedule will be installed in the setup computer of No.3 RCM replacing old Hitachi model.

  • PDF

SMI Compatible Simulation Scheduler Design for Reuse of Model Complying with SMP Standard

  • Koo, Cheol-Hea;Lee, Hoon-Hee;Cheon, Yee-Jin
    • Journal of Astronomy and Space Sciences
    • /
    • v.27 no.4
    • /
    • pp.407-412
    • /
    • 2010
  • Software reusability is one of key factors which impacts cost and schedule on a software development project. It is very crucial also in satellite simulator development since there are many commercial simulator models related to satellite and dynamics. If these models can be used in another simulator platform, great deal of confidence and cost/schedule reduction would be achieved. Simulation model portability (SMP) is maintained by European Space Agency and many models compatible with SMP/simulation model interface (SMI) are available. Korea Aerospace Research Institute (KARI) is developing hardware abstraction layer (HAL) supported satellite simulator to verify on-board software of satellite. From above reasons, KARI wants to port these SMI compatible models to the HAL supported satellite simulator. To port these SMI compatible models to the HAL supported satellite simulator, simulation scheduler is preliminary designed according to the SMI standard.

Development of Integrated Simulator for AC Traction Power Supply System (윈도우즈 기반의 교류 전기철도 급전시스템 통합 시뮬레이터 개발)

  • Kim, Joo-Rak;Kim, Jung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.76-81
    • /
    • 2010
  • This paper describes the development of integrated simulator with GUI(Graphic User Interface) for traction power supply system. This simulator consists of a lot of calculation modules such as TPS, train time schedule, line constant, and power supply system analysis. Each module has input and output structure respectively. The algorithms of all modules have confirmed the validity to comparison with field test that is performed on both high speed railway line and conventional line.

DSL: Dynamic and Self-Learning Schedule Method of Multiple Controllers in SDN

  • Li, Junfei;Wu, Jiangxing;Hu, Yuxiang;Li, Kan
    • ETRI Journal
    • /
    • v.39 no.3
    • /
    • pp.364-372
    • /
    • 2017
  • For the reliability of controllers in a software defined network (SDN), a dynamic and self-learning schedule method (DSL) is proposed. This method is original and easy to deploy, and optimizes the combination of multiple controllers. First, we summarize multiple controllers' combinations and schedule problems in an SDN and analyze its reliability. Then, we introduce the architecture of the schedule method and evaluate multi-controller reliability, the DSL method, and its optimized solution. By continually and statistically learning the information about controller reliability, this method treats it as a metric to schedule controllers. Finally, we compare and test the method using a given testing scenario based on an SDN network simulator. The experiment results show that the DSL method can significantly improve the total reliability of an SDN compared with a random schedule, and the proposed optimization algorithm has higher efficiency than an exhaustive search.

Knowledge Based Simulation for Production Scheduling (생산일정계획을 위한 지식 기반 모의실험)

  • La, Tae-Young;Kim, Sheung-Kown;Kim, Sun-Uk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.1
    • /
    • pp.197-213
    • /
    • 1997
  • It is not easy to find a good production schedule which can be used in practice. Therefore, production scheduling simulation with a simple dispatching rule or a set of dispatching rules is used. However, a simple dispatching rule may not create a robust schedule, for the same rule is blindly applied to all internal production processes. The presumption is that there might be a specific combination of appropriate rules that can improve the efficiency of a total production system for a certain type of orders. In order to acquire a better set of dispatching rules, simulation is used to examine the performance of various combinations of dispatching rule sets. There are innumerable combination of rule sets. Hence it takes too much computer simulation time to find a robust set of dispatching rule for a specific production system. Therefore, we propose a concept of the knowledge based simulation to circumvent the problem. The knowledge based simulation consists of knowledge bases, an inference engine and a simulator. The knowledge base is made of rule sets that is extracted from both simulation and human intuition obtained by the simulation studies. For a certain type of orders, the proposed system provides several sets of dispatching rules that are expected to generate better results. Then the scheduler tries to find the best by simulating all proposed set of rules with the simulator. The knowledge-based simulator armed with the acquired knowledge has produced improved solutions in terms of time and scheduling performance.

  • PDF

Development and Analysis of Real-time Distributed Air Defense System Simulator Using a Software Framework (소프트웨어 프레임워크를 이용한 대공유도무기 실시간 분산 시뮬레이터 개발 및 분석)

  • Cho, Byung-Gyu;Youn, Cheong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.4 s.23
    • /
    • pp.58-67
    • /
    • 2005
  • To overcome limitations of test scope, schedule and cost, M&S(Modeling & Simulation) technique has been applied for T&E(Test and Evaluation) of the state-of-art weapon systems. This paper proposes an air defense simulation software framework to reduce both redundancy an[1 programming errors in system simulator. The proposed framework consists of a 'model' and a 'middleware' The 'middleware' is a reliable communication service layer that supports not only HLA(High Level Architecture) which is an international standard in M&S but also TCP/IP, UDP and etc. The main role of 'model' is to schedule and to run the real-time distributed simulation. The proposed framework has been applied to M-SAM(Middle range Surface to Air Missile) system simulator. The proposed framework's scheduling and communication performance results are satisfactory and were measured by hardwired NTP(Network Timer Protocol) time-stamp with GPS(Global Positioning System) timer for better precision.

Analysis of Transportation and Handling System of Advanced Spent Fuel Management Process Using Graphic Simulator (그래픽 전산모사를 이용한 차세대관리공정 원격운반취급 분석)

  • 홍동희;윤지섭;김성현;송태길;진재현
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.431-437
    • /
    • 2003
  • The graphic simulator has been used to analyze the problems that can occur during transporting and handling radioactive materials, and to derive necessary devices that can transport and handle spent fuel powder without scattering in a hot cell. The graphic simulator has advantages over the real scale physical mockup with respect to cost and schedule. The process equipment and maintenance devices can be verified in advance with less cost and reduced schedule. The derived results are being reflected in the design of equipment for demonstration and are being verified during demonstration.

  • PDF

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

The Study of Event Graph Modeling for Material Handling System in Semiconductor Fab (반도체 fab 라인의 물류 설비 모델링 방법론에 대한 연구)

  • Lee Jin-Hwi;Choi Byoung-Kyu
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1765-1770
    • /
    • 2006
  • 본 논문에서는 반도체 fab 라인의 물류 설비를 event graph로 모델링 하는 방법론을 제안하고 있다. 최근 반도체 fab 라인 같은 대표적인 자본 집약적 제조라인에서는 운영단계에서 투입 계획, PM schedule 및 operation rule 등을 변화시켜 가며 평가 및 검증해 볼 수 있는 what-if simulation을 위한 line simulator의 필요성이 점점 높아지고 있다. 그러나 상용 simulator는 각 제조라인의 특성에 맞게 customization하는데 많은 시간과 비용이 소요될 뿐만 아니라 특성을 반영하는데 한계가 있다. 따라서 이러한 line simulator를 개발할 때 근간이 되는 설비의 simulation model이 필요하다. 이 때 설비들은 생산(processing) 및 물류(handling) 설비로 나눌 수 있는데, 본 논문에서는 반도체 fab 라인의 물류 설비 모델링 방법을 제시하고 실제 물류 설비를 모델링 해 봄으로써 그 효용성을 알아본다.

  • PDF

A JIT Production Scheduling in Multi-Level Parallel Machine Flow Shops (다단계 병렬기계(多段階 竝列機械) 흐름생산에서 JIT 일정계획)

  • Yoo, Chul-Soo;Lee, Young-Woo;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.171-180
    • /
    • 1994
  • Defined is a Multi-level Parallel Machine Flow-Shop (MPMFS) which reflects some real world manufacturing situations. Just-In-Time (JIT) philosophy is applied to the MPMFS scheduling in order to achieve lowering work-in-process inventory level as well as meeting due dates. A schedule generating simulator is developed. The latest start time of each operation is determined by a backward simulation followed by another forward simulation to analyze the schedule feasibility and actual inventory level. Reasonable schedules are available through adjusting some parameters for allowance factors such as set-up times of machines and other environmental changes. The SLAMSYSTEM under Window is employed for this processing with some input/output data handling processes devised under DOS.

  • PDF