• Title/Summary/Keyword: Schedule Simulation

Search Result 409, Processing Time 0.025 seconds

Scheduling Start-up Transient Periods of Dual Armed Cluster Tools (양팔 클러스터장비의 초기 전이 기간 스케줄링)

  • Hong, Kyeung-Hyo;Kim, Ja-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.3
    • /
    • pp.17-26
    • /
    • 2015
  • A cluster tool used in many kinds of semiconductor processes for improving the performance and the quality of wafers has a simple configuration, but its schedule is not easy because of its parallel processing module, a lack of intermediate buffers, and time constraints. While there have been many studies on its schedule, most of them have focused on full cycles in which identical work cycles are repeated under constant task times. In this research, we suggest strategies of start-up transient scheduling which satisfies time constraints and converges into a desirable steady schedule for full work cycle. The proposed schedules are expected robust under the stationary stochastic task times. Finally, we show that the strategies make schedules enters the desirable steady schedule and robust using the simulation.

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

Analysis of Multi-Pass Wet Wire Drawing Process and Its Application (다단 습식 신선공정 해석 및 적용)

  • Lee S. K.;Kim B. M.
    • Transactions of Materials Processing
    • /
    • v.14 no.8 s.80
    • /
    • pp.689-695
    • /
    • 2005
  • Multi-pass wet wire drawing process is used to produce fine wire in the industrial field. The production of fine wire through multi-pass wet wire drawing process with appropriate dies pass schedule would be impossible without understanding the relationship among many process parameters such as material properties, dies reduction, friction conditions, drawing speed etc However, in the industrial field, dies pass schedule of multi-pass wet wire drawing process has been executed by trial and error of experts. This study investigated the relationship among many process parameters quantitatively to obtain the important process information fur the appropriate pass schedule of multi-pass wet wire drawing process. Therefore, it is possible to predict the many important process parameters of multi-pass wet wire drawing process such as dies reduction, machine reduction, drawing force, backtension force, slip rate, slip velocity rate, power etc. The validity of the analyzed drawing force was verified by FE simulation and multi-pass wet wire drawing experiment. Also, pass redesign was performed based on the analyzed results, and the wire breakage between the original pass schedule and the redesigned pass schedule was compared through experiment.

A Study on the development of 4D based Architectural construction Simulation System (4D 시스템 기반의 건축시공 시뮬레이션 개발 방향 - 공정 프로세스 중심으로 -)

  • Jo, Jin;Kwon, Gi-Bum;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.119-122
    • /
    • 2007
  • The purpose of this study is to propose development of Schedule based Architectural Construction Simulation System. In this study (or paper), It analyzes the simulation system concept and its characteristics, and analyze the main functions simulation system and the range of functions which are already used currently. Therefore, It could find the limit of the present simulation system, and propose more effective solutions to develop Schedule based Architectural Construction Simulation System.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

SMI Compatible Simulation Scheduler Design for Reuse of Model Complying with SMP Standard

  • Koo, Cheol-Hea;Lee, Hoon-Hee;Cheon, Yee-Jin
    • Journal of Astronomy and Space Sciences
    • /
    • v.27 no.4
    • /
    • pp.407-412
    • /
    • 2010
  • Software reusability is one of key factors which impacts cost and schedule on a software development project. It is very crucial also in satellite simulator development since there are many commercial simulator models related to satellite and dynamics. If these models can be used in another simulator platform, great deal of confidence and cost/schedule reduction would be achieved. Simulation model portability (SMP) is maintained by European Space Agency and many models compatible with SMP/simulation model interface (SMI) are available. Korea Aerospace Research Institute (KARI) is developing hardware abstraction layer (HAL) supported satellite simulator to verify on-board software of satellite. From above reasons, KARI wants to port these SMI compatible models to the HAL supported satellite simulator. To port these SMI compatible models to the HAL supported satellite simulator, simulation scheduler is preliminary designed according to the SMI standard.

A Call Analysis and Design.Implementation of Simulation Model in the Call Center (콜 센터에서의 인입호 분석과 시뮬레이션 모델 설계 및 구현)

  • 김윤배;이창헌;이계신;이병철
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.75-85
    • /
    • 2003
  • With recent advances in technology and the changing nature of business, call center management has become a rapidly growing industry. However theoretical analysis about the call center system is very difficult, and the forecasting of call volume also. In the situation, it is significant that we study call-flow system, design system model and perform simulation. If these are possible, it is able to control the staff schedule and the resource management efficiently. This study introduces the process of applying the call center to simulation. So, it is feasible to break from the intuitive management by a minority manager and analyze it scientifically. The enterprise can reduce unnecessary expense, make an offer high quality to user in a keen competition

  • PDF

Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule (중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션)

  • Son, Myeong-Jo;Kim, Tae-Wan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.5
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.

An Enhanced Simulated Annealing Algorithm for Rural Postman Problems (Rural Postman Problem 해법을 위한 향상된 Simulated Annealing 알고리즘)

  • 강명주
    • Journal of the Korea Society of Computer and Information
    • /
    • v.6 no.1
    • /
    • pp.25-30
    • /
    • 2001
  • This paper proposes an enhanced Simulated Annealing(SA) algorithm for Rural Postman Problems(RPPs). In SA, the cooling schedule is an important factor for SA algorithms. Hence, in this paper a cooling schedule is proposed for SA for RPPs. In the simulation. the results of the SA using the proposed cooling schedule and the results of the SA using the existing cooling schedules are compared and analyzed. In the simulation results, the proposed method obtained the better results than the existing methods.

  • PDF